Concrete Walkways
Concrete Walkways near you
A concrete walkway is the path from the gate or the parking space to the door, the route round the side of the house to the bins, and the run of steps that gets you from a raised garden down to a lower one. It is the piece of a property that everybody uses, including people who have never been there before, at night, carrying things, and it is the piece most likely to be built by eye rather than designed.
Tell us about your concrete walkway project and we’ll help you find local concrete contractors who serve your area.
Free for homeowners · No obligation to hire
On this page
Britain has a specific body of guidance for exactly this route. The building regulations do not only care about what happens inside the front door: the approach to a dwelling has its own provisions covering width, cross fall, ramp gradients, step dimensions and handrails, and where a path involves a change in level there are separate provisions about guarding. Those are written for new work, but they are also the clearest statement available of what a safe approach looks like, which makes them a good benchmark for replacing an existing path.
The other thing a path has to get right is water. A concrete path is impermeable, it usually runs alongside a wall, and it often ends at the public footway, so the direction it falls decides whether rain drains harmlessly into a border, soaks the base of your wall, or runs out onto the pavement and freezes there. That is both a practical question and, at the boundary with the highway, a legal one.
What the approach route to a dwelling in England should provide
Approved Document M Volume 1, the 2015 edition with 2016 amendments, covers access to and use of dwellings in England and deals directly with the approach route: the external and internal parts of the route to the dwelling that fall within its plot or curtilage, and, where parking is not within the curtilage, the route between the dwelling and the nearest point at which a visitor would expect to get in and out of a car. It says the route should be safe and convenient for everyone, including older and disabled people and some wheelchair users, should adopt the shallowest gradient that can reasonably be achieved, and should be step-free where possible.
The dimensions it gives are usable numbers for any path. The approach route should be level, gently sloping, ramped or, where unavoidable, stepped; all external parts should have a suitable ground surface; the route should be a minimum of 900mm wide with a maximum cross fall of 1 in 40; and where a driveway forms all or part of the route, an additional allowance at least 900mm wide should be provided so that a wheelchair user can pass a parked car. For a ramped approach, individual flights should be no more than 10m long at gradients up to 1 in 15 and no more than 5m long at gradients up to 1 in 12, every flight should be a minimum of 900mm clear width, there should be a top and bottom landing with an intermediate landing between flights and at any change of direction, and every landing should be a minimum of 1200mm long, clear of the swing of a door or gate.
Where the plot is too steep for a step-free route, the same document sets out the stepped approach: steps uniform with a rise of 75mm to 150mm and a minimum going of 280mm, measured 270mm from the narrow end of a tapered step; suitable tread nosings; no individual flight rising more than 1800mm between landings; a minimum clear flight width of 900mm; landings at top and bottom, and intermediate ones where necessary, each at least 900mm long; and a grippable handrail to one side of every flight with three or more risers, 850mm to 1000mm above the pitch line and extending at least 300mm beyond the flight.
Northern Ireland's version of the same path
Northern Ireland has its own regulations and its own guidance, and it is worth reading rather than assuming the England document carries across. Technical Booklet H of 2012, supporting the Building Regulations (Northern Ireland) 2012, sets out both a ramped approach and a stepped approach in terms that are recognisably similar but not identical. Its ramped approach should have an unobstructed width of not less than 900mm, ramps not exceeding 10m in length where the slope does not exceed 1 in 15 or 5m where it does not exceed 1 in 12, and landings with an unobstructed length of not less than 1200mm.
Its stepped approach should have flights of not less than 900mm unobstructed width, a rise of not more than 1800mm in each flight, steps with a uniform rise of not less than 75mm and not more than 150mm, a uniform going of not less than 280mm measured 270mm from the narrow end of a tapered tread, steps that are not open and have a profile that reduces the risk of tripping, a maximum of 16 steps in a flight, and landings of not less than 900mm unobstructed length. A suitable continuous handrail is expected on one side of the flight, and at an intermediate landing where the flight has three or more steps.
The Northern Ireland handrail heights are stated separately from the England ones and are worth quoting when you brief a contractor there: 900mm measured vertically above the pitch line of a flight of steps and 1000mm above the surface of a landing, extending not less than 300mm horizontally beyond the top and bottom nosings. Scotland works to its building standards technical handbooks instead, and Wales publishes its own Approved Documents, so in either case use the document for your own country rather than the England one.
Guarding, edges and the drop beside a path
- In England, Approved Document K expects guarding at the sides of flights and landings in a dwelling where there is a drop of more than 600mm, and gives a guarding height of 900mm for stairs, landings, ramps and internal floor edges in a single family dwelling, with 1100mm for external balconies and roof edges.
- Its performance statement for dwellings is the underlying principle: guarding capable of preventing people from being injured by falling from a height of more than 600mm.
- Scotland's domestic technical handbook of April 2026 asks for a protective barrier at the edge of every floor, stair, ramp, landing or raised area to which people have access where there is a difference in level of 600mm or more, and at any change of direction on an access route that is raised above the surrounding surface.
- Both jurisdictions expect guarding around a dwelling to stop a 100mm diameter sphere passing through it and to be difficult for a young child to climb, which is why horizontal rails are discouraged.
- Any wall, parapet or balustrade can serve as guarding provided it reaches the required height and can take the loads, so a low garden wall beside a raised path is not automatically adequate.
- A step forming where a path meets a threshold, a manhole cover or the public footway is a trip hazard in its own right and should be designed out rather than tolerated.
- Lighting is not in the geometry but it is in the risk: an unlit flight of external steps is where most falls on a domestic approach happen.
Where your path meets the public footway
Solid material coming off your land is dealt with by section 151 of the Highways Act 1980, which applies in England and Wales. A competent authority may, by notice to the owner or occupier of any land adjoining a street which is a highway maintainable at public expense, require him within 28 days from the date of service to execute such works as will prevent soil or refuse from that land from falling, or being washed or carried, onto the street or into any sewer or gully in it in such quantities as to obstruct the street or choke the sewer or gully. Failing to do so within the period is an offence with a fine up to level 3 on the standard scale and a further daily penalty, and there is a right of appeal to a magistrates' court.
Surface water is handled by section 163 of the same Act, which is aimed at premises rather than at land, and which is explained on the concrete driveways page on this site. Its effect for a path is simple enough to state here: an authority can require the occupier or owner to put in and keep the channels, gutters or downpipes needed to stop water from the premises falling on people using the highway and, as far as is reasonably practicable, to stop surface water reaching the footway, and there is an offence with a daily penalty for ignoring the notice.
Very few homeowners will ever see a notice under either section, but the two together describe what a well-built approach does at the boundary. Rain that lands on your path goes into your own drainage or your own planting. Soil, grit and gravel from a raised border or a bank beside the path stay on your side of the gate rather than washing across the pavement every time it rains. A path built falling towards the street fails that test on both counts at once.
Building a concrete path that stays where it was put
A path is a small slab and it fails in the same ways a big one does, so the sequence is the same and the discipline matters more because the margins are tighter. The route is set out and the levels are established first, including the crossfall and the point where the path meets the threshold, the drive and the footway. Then the ground is excavated to formation, soft areas are dug out rather than bridged, and a sub base is compacted in layers. On a narrow path it is tempting to skip the base entirely and pour the concrete straight onto the ground, and that is the single most common reason domestic paths crack and tilt within a few years.
Edges and joints come next in importance. A path has a very high ratio of edge to area, so an unsupported or thin edge is proportionally much more damaging than it is on a drive, and a thickened edge or a haunched kerb is worth the extra concrete. Movement joints are placed at regular intervals along the run and at every point where the path meets a wall, a step, a manhole or another slab, so the concrete cracks along a designed line rather than across the middle of the route.
Finishing is where a path earns its keep in a wet climate. The surface should be textured for grip, usually brushed across the direction of travel, and the falls should be checked with a level before the concrete stiffens rather than assessed afterwards with a bucket of water. Steps get particular attention, since nosings are where a path hurts people, and the guidance is explicit about uniform rises and suitable nosing profiles. The slab is then cured and kept off for the time specified.
Why domestic paths fail, and what the failure looks like
- A path poured straight onto soft ground with no compacted base, which settles unevenly and tilts within a few winters.
- Steps in the surface at joints, at a manhole cover or where the path meets the drive, each of which is a trip hazard in the dark.
- A path that falls towards the house rather than away from it, which puts water against the wall and can bridge or breach the damp proof course.
- Water running off the path onto the public footway, where it freezes and becomes somebody else's fall.
- Cracked and crumbling edges where mowers, wheels and feet have run over an unsupported edge.
- Uneven step rises, particularly a shallow top or bottom step formed by a later surface being added, which is exactly what catches a foot.
- A smooth, steel floated finish in a shaded side passage, which grows algae and becomes treacherous for half the year.
- Tree roots lifting a section of path, which needs the cause dealt with on arboricultural advice rather than the concrete simply being relaid.
What drives a concrete walkway quote, and how LokalMatch fits in
Paths are priced on length and complication rather than on area alone, because the formwork, the edges and the setting out take a disproportionate share of the time. The things that change a quotation are how much excavation and spoil removal is involved, the depth of base needed for the ground you have, whether the route includes steps, a ramp or a change of direction, whether guarding or a handrail is being provided, how the concrete gets to a back or side passage that no lorry can reach, the finish specified, and what happens to the water at the bottom of the fall. Lifting and disposing of an old path, and working around drains, covers, gates and planting, is real work that a thin quotation often leaves out.
Getting two or three contractors to price the same brief is the point of LokalMatch. Describe the path once with your postcode, its approximate length and width, whether there are steps or a slope, what is there now and where the water should end up, and groundwork and paving contractors covering your area contact you directly. Nothing is charged to the homeowner; the professionals pay for the requests they receive. LokalMatch does not build paths, does not set prices and does not vet, rank or recommend anybody who replies, so comparing the base depth, the falls, the step dimensions and the finish across the quotations is your job rather than ours.
Concrete Walkways: frequently asked questions
How wide should a path to my front door be?
Approved Document M Volume 1, the 2015 edition with 2016 amendments for England, says an approach route should be a minimum of 900mm wide with a maximum cross fall of 1 in 40, and that where a driveway forms all or part of the route an additional allowance at least 900mm wide should be provided so that a wheelchair user can pass a parked car. Northern Ireland's Technical Booklet H uses 900mm for ramped and stepped approaches as well. Those are new-work figures, but they are a sensible benchmark when replacing an existing path.
How steep can a ramp to the door be?
Approved Document M Volume 1 limits individual ramp flights on an approach route to no more than 10m long at gradients up to 1 in 15 and no more than 5m long at gradients up to 1 in 12, with a minimum clear width of 900mm, a top and bottom landing, an intermediate landing between flights and at any change of direction, and every landing a minimum of 1200mm long clear of any door or gate swing. Northern Ireland's Technical Booklet H states the same 10m at 1 in 15 and 5m at 1 in 12 limits with 1200mm landings.
What dimensions should external steps have?
For a stepped approach to a dwelling in England, Approved Document M Volume 1 asks for uniform steps with a rise of 75mm to 150mm and a minimum going of 280mm, suitable tread nosings, no flight rising more than 1800mm between landings, a minimum clear width of 900mm, landings at least 900mm long, and a grippable handrail to one side of any flight with three or more risers, set 850mm to 1000mm above the pitch line and extending at least 300mm beyond the flight. Northern Ireland's Technical Booklet H gives the same rise and going, caps a flight at 16 steps and puts the handrail at 900mm above the pitch line and 1000mm above a landing.
When does a raised path need a handrail or guarding?
In England, Approved Document K asks for guarding at the sides of flights and landings in a dwelling where there is a drop of more than 600mm, and its performance statement is guarding capable of preventing injury from a fall of more than 600mm, at a height of 900mm for stairs, landings and ramps in a single family dwelling. Scotland's April 2026 domestic handbook expects a protective barrier where there is a difference in level of 600mm or more, and at any change of direction on a raised access route. In both cases the guarding should stop a 100mm sphere and should not be easy for a child to climb.
My path drains onto the pavement. Does that matter?
It is worth fixing, for two reasons. The practical one is ice: water crossing a pavement in a cold snap freezes where people walk, and that is a fall waiting to happen outside your own gate. The legal one is that the Highways Act 1980 gives an authority a route to require works where surface water reaches the footway from premises, and a parallel power over soil and grit washing off adjoining land onto the street. Correcting the crossfall, or adding a channel drain that discharges into a soakaway or a border within your boundary, deals with both.
Why has my concrete path tilted after only a few years?
Almost always because it was poured onto the ground rather than onto a compacted sub base. A path is narrow and light, so it has very little ability to bridge a soft spot, and any settlement, washing out or seasonal movement underneath shows up immediately as a tilt or a step. Tree roots and a leaking gully are the other two usual suspects. Relaying it with a proper compacted base, supported edges and joints at planned intervals is the durable answer, and where roots are involved that needs arboricultural advice first.
Sources
- GOV.UK: Approved Document M, access to and use of buildings
- Approved Document M Volume 1, 2015 edition with 2016 amendments: approach routes, ramps and stepped approaches (PDF)
- Approved Document K, 2013 edition: guarding and protection from falling (PDF)
- Building Control NI: Technical Booklet H 2012, ramped and stepped approaches (PDF)
- Scottish Government: building standards technical handbook, domestic, April 2026
- Highways Act 1980, section 163: prevention of water flowing onto the footway
- Highways Act 1980, section 151: prevention of soil or refuse being washed onto a street
Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides
Find concrete contractors by city
England
Show 173 citiesHide cities
- Concrete Walkways in Birmingham
- Concrete Walkways in Bournemouth
- Concrete Walkways in Bradford
- Concrete Walkways in Brighton and Hove
- Concrete Walkways in Bristol
- Concrete Walkways in Cambridge
- Concrete Walkways in Coventry
- Concrete Walkways in Derby
- Concrete Walkways in Exeter
- Concrete Walkways in Ipswich
- Concrete Walkways in Kingston upon Hull
- Concrete Walkways in Leeds
- Concrete Walkways in Leicester
- Concrete Walkways in Liverpool
- Concrete Walkways in London
- Concrete Walkways in Luton
- Concrete Walkways in Manchester
- Concrete Walkways in Middlesbrough
- Concrete Walkways in Milton Keynes
- Concrete Walkways in Newcastle upon Tyne
- Concrete Walkways in Northampton
- Concrete Walkways in Norwich
- Concrete Walkways in Nottingham
- Concrete Walkways in Oxford
- Concrete Walkways in Peterborough
- Concrete Walkways in Plymouth
- Concrete Walkways in Portsmouth
- Concrete Walkways in Reading
- Concrete Walkways in Sheffield
- Concrete Walkways in Southampton
- Concrete Walkways in Southend-on-Sea
- Concrete Walkways in Stoke-on-Trent
- Concrete Walkways in Sunderland
- Concrete Walkways in Swindon
- Concrete Walkways in Wolverhampton
- Concrete Walkways in York
- Concrete Walkways in Ashford
- Concrete Walkways in Aylesbury
- Concrete Walkways in Banbury
- Concrete Walkways in Barnsley
- Concrete Walkways in Barrow-in-Furness
- Concrete Walkways in Basildon
- Concrete Walkways in Basingstoke
- Concrete Walkways in Bath
- Concrete Walkways in Bebington
- Concrete Walkways in Bedford
- Concrete Walkways in Beeston
- Concrete Walkways in Birkenhead
- Concrete Walkways in Blackburn
- Concrete Walkways in Blackpool
- Concrete Walkways in Bloxwich
- Concrete Walkways in Bognor Regis
- Concrete Walkways in Bolton
- Concrete Walkways in Bootle
- Concrete Walkways in Bracknell
- Concrete Walkways in Brentwood
- Concrete Walkways in Burnley
- Concrete Walkways in Burton upon Trent
- Concrete Walkways in Bury
- Concrete Walkways in Cannock
- Concrete Walkways in Canterbury
- Concrete Walkways in Carlisle
- Concrete Walkways in Chatham
- Concrete Walkways in Chelmsford
- Concrete Walkways in Cheltenham
- Concrete Walkways in Chester
- Concrete Walkways in Chesterfield
- Concrete Walkways in Clacton-on-Sea
- Concrete Walkways in Colchester
- Concrete Walkways in Corby
- Concrete Walkways in Crawley
- Concrete Walkways in Crewe
- Concrete Walkways in Crosby
- Concrete Walkways in Darlington
- Concrete Walkways in Dartford
- Concrete Walkways in Dewsbury
- Concrete Walkways in Doncaster
- Concrete Walkways in Dudley
- Concrete Walkways in Durham
- Concrete Walkways in Eastbourne
- Concrete Walkways in Ellesmere Port
- Concrete Walkways in Farnborough
- Concrete Walkways in Folkestone
- Concrete Walkways in Gateshead
- Concrete Walkways in Gillingham
- Concrete Walkways in Gloucester
- Concrete Walkways in Gosport
- Concrete Walkways in Gravesend
- Concrete Walkways in Grimsby
- Concrete Walkways in Guildford
- Concrete Walkways in Halesowen
- Concrete Walkways in Halifax
- Concrete Walkways in Harlow
- Concrete Walkways in Harrogate
- Concrete Walkways in Hartlepool
- Concrete Walkways in Hastings
- Concrete Walkways in Hemel Hempstead
- Concrete Walkways in Hereford
- Concrete Walkways in High Wycombe
- Concrete Walkways in Hinckley
- Concrete Walkways in Horsham
- Concrete Walkways in Huddersfield
- Concrete Walkways in Huyton with Roby
- Concrete Walkways in Kettering
- Concrete Walkways in Kidderminster
- Concrete Walkways in Kingswinford
- Concrete Walkways in Kingswood and Fishponds
- Concrete Walkways in Lancaster
- Concrete Walkways in Lincoln
- Concrete Walkways in Loughborough
- Concrete Walkways in Lowestoft
- Concrete Walkways in Macclesfield
- Concrete Walkways in Maidenhead
- Concrete Walkways in Maidstone
- Concrete Walkways in Mansfield
- Concrete Walkways in Margate
- Concrete Walkways in Newcastle-under-Lyme
- Concrete Walkways in Nuneaton
- Concrete Walkways in Oldham
- Concrete Walkways in Paignton
- Concrete Walkways in Poole
- Concrete Walkways in Preston
- Concrete Walkways in Redditch
- Concrete Walkways in Rochdale
- Concrete Walkways in Rochester
- Concrete Walkways in Rotherham
- Concrete Walkways in Royal Leamington Spa
- Concrete Walkways in Royal Sutton Coldfield
- Concrete Walkways in Royal Tunbridge Wells
- Concrete Walkways in Rugby
- Concrete Walkways in Runcorn
- Concrete Walkways in Sale
- Concrete Walkways in Salford
- Concrete Walkways in Scarborough
- Concrete Walkways in Scunthorpe
- Concrete Walkways in Shrewsbury
- Concrete Walkways in Sittingbourne
- Concrete Walkways in Slough
- Concrete Walkways in Smethwick
- Concrete Walkways in Solihull
- Concrete Walkways in South Shields
- Concrete Walkways in Southport
- Concrete Walkways in St Albans
- Concrete Walkways in St Helens
- Concrete Walkways in Stafford
- Concrete Walkways in Stevenage
- Concrete Walkways in Stockport
- Concrete Walkways in Stockton-on-Tees
- Concrete Walkways in Stourbridge
- Concrete Walkways in Tamworth
- Concrete Walkways in Taunton
- Concrete Walkways in Telford
- Concrete Walkways in Torquay
- Concrete Walkways in Tynemouth
- Concrete Walkways in Wakefield
- Concrete Walkways in Wallasey
- Concrete Walkways in Walsall
- Concrete Walkways in Warrington
- Concrete Walkways in Washington
- Concrete Walkways in Watford
- Concrete Walkways in Wellingborough
- Concrete Walkways in Welwyn Garden City
- Concrete Walkways in West Bromwich
- Concrete Walkways in Weston-super-Mare
- Concrete Walkways in Weymouth
- Concrete Walkways in Widnes
- Concrete Walkways in Wigan
- Concrete Walkways in Woking
- Concrete Walkways in Wokingham
- Concrete Walkways in Worcester
- Concrete Walkways in Worthing
- Concrete Walkways in Wythenshawe
- Concrete Walkways in Yeovil
Northern Ireland
Show 7 citiesHide cities
Scotland
Show 10 citiesHide cities
- Concrete Walkways in Aberdeen
- Concrete Walkways in Dundee
- Concrete Walkways in Edinburgh
- Concrete Walkways in Glasgow
- Concrete Walkways in Cumbernauld
- Concrete Walkways in Dunfermline
- Concrete Walkways in East Kilbride
- Concrete Walkways in Hamilton
- Concrete Walkways in Livingston
- Concrete Walkways in Paisley
What affects the cost of concrete walkway
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size and thickness of the area
- Removal of the old surface
- Excavation and base preparation
- Finish, colour or pattern
- Access for equipment and trucks
- Steps, curves, drains or retaining edges
How to compare concrete contractors before you hire
- Choose a contractor who explains how they'll prepare the base, since most concrete and interlock problems start underneath.
- Ask how they'll slope the surface so water drains away from the house.
- Get a written quote that covers excavation, base material, reinforcement, finish and removal of the old surface.
- Look at jobs they finished a few seasons ago to see how they've held up through freeze and thaw.
- Ask whether they'll call to have underground utilities located before digging.
Questions to ask concrete contractors before you hire
- How deep will you excavate, and what base will you put down?
- Will you use reinforcement, and what kind?
- How will you make sure water drains away from the house?
- Does this work need a permit from my municipality?
- How soon can the surface be walked on or driven on after it's done?
- What warranty do you offer for cracking, settling or heaving?
When to call a pro for concrete walkway
- Cracks that are widening or slabs that have sunk or lifted
- Water pooling against the foundation after rain
- Trip hazards on steps, walkways or driveways
Concrete walkway permits and local rules
Some concrete walkway work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingFree project calculators
Guides about concrete walkway
- ✦
Concrete Contractors guide
Concrete work around a British home means driveways, paths, patios, garage and shed bases, steps, ground floor slabs and foundations.
Read guide - ✦
Concrete Repair guide
Concrete repair covers a wide spread of jobs that share one question: is the surface broken, or is something behind the surface breaking it.
Read guide - ✦
Concrete Levelling guide
Concrete levelling in a British home usually means one of two quite different jobs. Indoors it means getting a solid ground floor flat and dry enough for a floor covering to be laid on it, whether by grinding high…
Read guide
Ready to get concrete walkway quotes?
Tell us about your concrete walkway project.
Do you offer concrete walkway services?
Join LokalMatch to get matched with homeowners in the areas you serve.