Concrete Driveways

Concrete Driveways near you

A concrete drive is an unusual choice in Britain and a sound one in the right circumstances. Most new domestic drives here are block paving, resin bound gravel or tarmac, so a homeowner asking for concrete is normally after its particular strengths: a continuous surface with no joints for weeds, a base that will take a heavy vehicle without rutting, and a life measured in decades rather than years. Its weaknesses are just as specific. It cracks if the joints are wrong, it cannot be lifted and relaid the way block paving can, and it is about as impermeable as a domestic surface gets.

Tell us about your concrete driveway project and we’ll help you find local concrete contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

That last point puts a concrete front drive squarely inside the front garden drainage rules, which are set out in full in the paving and driveway repair guides on this site and are not repeated here. In short, an impermeable surface over a certain area in a front garden needs either planning permission or a genuine arrangement for the water to reach a permeable area, so a concrete drive has to be designed around where the rain goes before anything else is decided.

The second thing to settle early has nothing to do with planning. If you will drive across a pavement or a verge to reach the drive, you need a vehicle crossing, and that is the highway authority's decision under its own legislation, on its own timescale. Sorting the crossing out after the concrete has cured is the most expensive sequencing error in this trade.

Driving across the footway: section 184 and the vehicle crossing

The law on crossing a pavement to reach your property sits in section 184 of the Highways Act 1980, which applies in England and Wales. It deals with the situation where the occupier of premises adjoining a highway habitually takes a vehicle across a kerbed footway or a verge, and it gives the highway authority the power to serve notice proposing either to construct a vehicle crossing over that footway or verge, or to impose reasonable conditions on the use of it. The notice must tell the recipient about the right to object and, except in the case of a conditions notice, that the authority may recover the expenses reasonably incurred in carrying out the work from the owner or the occupier.

Two parts of the section matter to a homeowner planning a drive. The first is that you can start the process yourself: an owner or occupier may request the authority to construct a crossing and, on depositing the quoted cost, require the authority to carry out the work. The second is the sanction. Where the authority has imposed conditions on the use of a footway or verge as a crossing, a person who knowingly uses it in contravention of those conditions commits an offence and is liable to a fine not exceeding level 3 on the standard scale.

Scotland has its own route. Section 56 of the Roads (Scotland) Act 1984 provides that no works shall be executed in, or excavation made under, a public road except with the roads authority's consent in writing and in accordance with any reasonable conditions imposed, that doing so without consent is an offence, and that the authority may remove the works or fill in the excavation at the person's expense and recover its reasonable costs. Forming an access across a Scottish footway is therefore a conversation with the roads authority before a contractor is booked, not after.

Skips, spoil and water reaching the pavement

A concrete drive generates a lot of material coming out and a lot of material going in, and both meet the public highway. Section 139 of the Highways Act 1980 is unambiguous about the first: a builders' skip shall not be deposited on a highway without the permission of the highway authority for that highway. The authority may attach conditions covering the siting and dimensions of the skip, its visibility markings and paint, the care and disposal of its contents, the way it is lit and guarded, and when it must be removed. Depositing a skip without permission makes the owner liable to a fine not exceeding level 3 on the standard scale, and the same level applies to failures over lighting, markings, owner identification or removal. If a contractor tells you a skip on the road needs no permit, that is a straightforward misstatement of the law.

Water is the second highway question, and it survives long after the job is finished. Section 163 of the same Act allows a competent authority to serve notice on the occupier, the owner, or both, requiring them within 28 days to provide and maintain such channels, gutters or downpipes as may be necessary to prevent water from the roof or any other part of the premises falling on people using the highway, and, so far as is reasonably practicable, to prevent surface water from flowing onto or over the footway. Failure to comply is an offence with a fine not exceeding level 1 on the standard scale and a further daily penalty while it continues.

That is why a design question about a concrete drive is really a legal one. A large impermeable slab laid falling towards the street discharges its rain onto the footway, where it freezes in winter and becomes somebody's fall. Ask the contractor to show you, on the quotation, which way the drive falls and what collects the water: a channel drain across the entrance discharging to a soakaway, or a fall towards a permeable border within your own ground.

What a domestic concrete drive is actually made of

  • A compacted sub base of crushed stone, whose depth is chosen for the ground conditions and the vehicles, and which does more for the drive's life than the concrete does.
  • A separating or slip membrane between the base and the slab, so the slab can shrink without dragging on the stone beneath it.
  • Steel mesh reinforcement in the slab, held at the correct height rather than laid on the ground and hoped for.
  • Air entrained concrete for external use, which builds microscopic bubbles into the mix so that freezing water has somewhere to expand.
  • Formed or saw-cut movement joints in a planned grid, since concrete will crack and the joints decide where.
  • Isolation joints where the slab meets a wall, a manhole, a threshold or a kerb, so that the two can move independently.
  • A surface finish chosen for grip: brushed or broom finished across the direction of travel, tamped, exposed aggregate or imprinted with a sealed pattern.
  • An edge detail, either a thickened slab edge or a kerb, since an unsupported edge is where a concrete drive starts to break.

How a concrete drive is laid, and where the hold-ups come

Excavation and base work come first and take longer than the pour. The ground is dug out to a formation that suits the sub base depth, soft spots are dug out and replaced rather than rolled over, the sub base is laid and compacted in layers, and levels and falls are set out with pegs and a laser. Any drainage, ducting for future lighting or a charge point, and the connection to a soakaway or channel drain is installed at this stage, because none of it can be added afterwards without cutting the slab.

Then the slab is formed, reinforced and poured. Formwork is set to the finished level and the falls, the membrane is laid, the mesh is positioned and supported, and the concrete is placed, compacted and levelled in one continuous operation for each bay. This is why the weather forecast decides the date: concrete placed in a hard frost, in heavy rain or in strong sun without protection does not reach the strength it was ordered at. A ready-mixed delivery also needs a route in, somewhere to stand and, on a tight site, a pump.

Finishing and curing decide how it looks and how it wears. The surface is textured for grip once the bleed water has gone, joints are formed or cut at the planned spacings, and the slab is protected while it gains strength. Curing is the stage most often skipped on a domestic job, and it is the difference between a surface that stays sound and one that dusts and crazes. Expect the drive to be kept off for the period the contractor specifies, and expect vehicles later than foot traffic.

Why concrete drives crack, and which cracks matter

  • Random cracking across a bay usually means joints were too far apart or cut too late, so the slab chose its own line.
  • A crack that runs from the corner of a manhole, a gully or a step is a stress concentration that an isolation joint would have prevented.
  • Surface scaling, where the top few millimetres flake away over winter, points at a mix without air entrainment, a surface overworked when it was placed, or de-icing salt on young concrete.
  • Crazing, a fine surface map of cracks, is a finishing and curing defect rather than a structural one, though it can collect dirt and look worse each year.
  • A cracked and rocking edge is nearly always an unsupported one, where a vehicle has run over the last few centimetres of slab with nothing beneath it.
  • A step forming at a joint means the ground under one side has settled or washed out, and filling the joint will not stop it.
  • Standing water in the middle of a drive is a levels problem from the day it was laid, and it is the fault that takes the most work to correct later.
  • Staining and slime in shaded areas are a slip hazard on a smooth finish, especially where the surface was steel floated rather than textured.

A concrete drive through a British winter

Freeze and thaw is the main weathering cycle acting on external concrete in Britain, and it works on water held in the surface. That is why external concrete is normally air entrained, and why a drive that ponds in one corner deteriorates there first. The practical consequence for a homeowner is that drainage and winter durability are the same subject: water that leaves the surface quickly does very little harm, while water that sits in a hollow through a frosty week does a great deal.

New concrete is at its most vulnerable in its first winter. De-icing salt on a young slab is a common cause of surface scaling, so if a drive is laid in autumn the contractor should tell you when salt may be used and what to do instead until then, which is usually to clear snow mechanically and to grit with sharp sand where grip is needed. Keeping the surface clear also matters more than it does on block paving, because a continuous slab sheds water only if the water can get to the edge or the channel.

The rest of the winter routine is unremarkable but worth doing. Keep the channel drain and any soakaway inspection point clear of leaves, since a blocked outlet turns a well-drained drive into a pond. Watch the joint sealant, because an open joint lets water into the base beneath. And keep an eye on where meltwater goes at the entrance, since that is the point at which your drive and the public footway meet and section 163 becomes relevant.

Looking after a concrete drive

  • Keep the falls working by clearing channel gratings, gullies and soakaway inspection points at least twice a year.
  • Replace failed joint sealant rather than ignoring it, because an open joint feeds water straight into the sub base.
  • Wash algae and moss off shaded areas before winter, since a smooth concrete surface with growth on it is genuinely slippery.
  • Avoid de-icing salt on concrete in its first winter, and use it sparingly afterwards on any surface that is already scaling.
  • Keep skips, grab lorries and delivery vehicles off a domestic slab where possible, and especially off the unsupported edges.
  • Deal with a small crack while it is small, sealing it so that water and grit cannot work into it and open it further.
  • Clean oil and fuel spills promptly, since concrete is porous enough to hold them and they weaken the surface over time.
  • Re-apply a surface sealer, if one was specified, at the interval the manufacturer states rather than when the drive starts looking tired.

What drives a concrete driveway quote, and how LokalMatch fits in

The big variables are below the surface and at the edges. What a contractor is pricing is the depth of excavation and how much spoil leaves the site, the sub base depth the ground actually needs, the slab thickness and the reinforcement, whether a vehicle crossing has to be applied for and paid for separately, what drainage is being installed and where the water is being sent, how many joints and edge details there are, and what surface finish you have chosen, since an imprinted or exposed aggregate finish is a different operation from a brushed one. Access matters as much as any of it: a site a ready-mixed lorry can discharge into directly is a different price from one that needs a pump or barrowing.

Comparing those variables between firms is exactly what LokalMatch is built for. Describe the drive once with your postcode, the approximate size, the vehicles it will carry, whether there is a dropped kerb already and what is there now, and driveway contractors covering your area will get in touch. Posting a request costs a homeowner nothing, because the contractors pay for the requests they receive rather than the other way round. LokalMatch does not lay drives, does not set prices and does not vet, rank or recommend any of the firms that respond, so checking the specification, the drainage design and the crossing arrangements is a job that stays with you.

Concrete Driveways: frequently asked questions

Do I need permission to drive across the pavement to my new drive?

Yes, and the decision belongs to the roads or highway authority rather than to planners. In England and Wales the governing provision is section 184 of the Highways Act 1980, which lets an authority deal with habitual driving over a kerbed footway or verge, charge the property for the work, and attach conditions, with an offence for knowingly ignoring those conditions. The important practical point is timing: apply before you commit to a surfacing date, because the authority sets its own programme and a finished drive with no lawful way in is an expensive place to be.

Is the rule different in Scotland?

Yes. The Highways Act 1980 does not extend to Scotland, so the relevant provision is section 56 of the Roads (Scotland) Act 1984, which requires the roads authority's consent in writing before works are executed in, or an excavation made under, a public road, subject to any reasonable conditions it attaches. Going ahead without that consent is an offence, and the authority can undo the work and bill you for doing so. Speak to the council's roads service at the design stage, not once a contractor has a date in the diary.

Does a skip on the road need a permit?

It does. Section 139 of the Highways Act 1980 states that a builders' skip shall not be deposited on a highway without the permission of the highway authority for that highway, and permission may carry conditions about siting and dimensions, markings and paint, the care and disposal of the contents, lighting and guarding, and the date of removal. Depositing a skip on the highway without permission makes the owner liable to a fine of up to level 3 on the standard scale, as do failures over lighting, markings, owner identification or removal.

Will a concrete drive crack?

Concrete shrinks as it cures and moves with temperature, so the question is not whether it cracks but whether you decided where. That is what movement joints are for: formed or saw-cut on a planned grid so the slab relieves stress along a straight, sealed line instead of a ragged one across the middle. Isolation joints do the same job where the slab meets a wall, a manhole or a kerb. A quotation that does not mention joint spacing or edge detail is worth questioning before it is accepted.

Why is my new concrete drive flaking on the surface?

Surface scaling of the top few millimetres normally comes from one of three things: a mix without air entrainment exposed to freeze and thaw, a surface that was overworked or had water worked into it during finishing, or de-icing salt used on concrete that was still young. It is worth establishing which, because the remedy differs and because scaling caused by specification or workmanship is a conversation with the contractor. In the meantime, keep salt off it and keep water from standing on it.

Where should the water from a concrete drive go?

Into your own ground rather than onto the street, and the design should say so explicitly. Section 163 of the Highways Act 1980 lets a competent authority give an occupier or owner 28 days to provide and maintain channels, gutters or downpipes to stop water falling on people using the highway and, so far as reasonably practicable, to stop surface water flowing onto or over the footway, with an offence and a daily penalty for non-compliance. In practice that means falls towards a channel drain and soakaway, or towards a permeable border, marked on the quotation.

Do I need planning permission for a concrete front drive?

Concrete is an impermeable surface, so the front garden drainage rules are the first thing to check. Those rules, the area threshold behind them and how they differ across the United Kingdom are set out in full in the paving and driveway repair guides on this site rather than repeated here. The short version for a concrete drive is that the water has to be dealt with within your own ground, whether by falling to a permeable area or by a drainage system, and that a large impermeable slab draining to the street is the case the rules were written to prevent.

Sources

  1. Highways Act 1980, section 184: vehicle crossings over footways and verges
  2. Highways Act 1980, section 139: builders' skips
  3. Highways Act 1980, section 163: prevention of water flowing onto the footway
  4. Roads (Scotland) Act 1984, section 56: control of works and excavations in a public road
  5. Planning Portal: paving your front garden

Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides

Find concrete contractors by city

England

Show 173 cities

What affects the cost of concrete driveway

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size and thickness of the area
  • Removal of the old surface
  • Excavation and base preparation
  • Finish, colour or pattern
  • Access for equipment and trucks
  • Steps, curves, drains or retaining edges

How to compare concrete contractors before you hire

  • Choose a contractor who explains how they'll prepare the base, since most concrete and interlock problems start underneath.
  • Ask how they'll slope the surface so water drains away from the house.
  • Get a written quote that covers excavation, base material, reinforcement, finish and removal of the old surface.
  • Look at jobs they finished a few seasons ago to see how they've held up through freeze and thaw.
  • Ask whether they'll call to have underground utilities located before digging.

Questions to ask concrete contractors before you hire

  • How deep will you excavate, and what base will you put down?
  • Will you use reinforcement, and what kind?
  • How will you make sure water drains away from the house?
  • Does this work need a permit from my municipality?
  • How soon can the surface be walked on or driven on after it's done?
  • What warranty do you offer for cracking, settling or heaving?

When to call a pro for concrete driveway

  • Cracks that are widening or slabs that have sunk or lifted
  • Water pooling against the foundation after rain
  • Trip hazards on steps, walkways or driveways

Concrete driveway permits and local rules

Some concrete driveway work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators