Skip to content
LokalMatch

Hardwood Flooring

Hardwood Flooring near you

Hardwood flooring in Britain means one of three jobs: laying new solid boards, laying engineered boards, or bringing an original timber floor back into use. The housing stock decides which is sensible. A Victorian or Edwardian terrace usually has suspended timber floors over a ventilated void, with airbricks in the outside wall feeding air under the joists. A post-war or modern house is more likely to have a solid ground floor: a concrete slab with a screed over it, and a damp-proof membrane somewhere in the build-up.

Tell us about your hardwood flooring project and we’ll help you find local flooring contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

That difference drives everything a fitter does. Boards can be secret-nailed to joists or to a ply deck on a suspended floor, while a solid floor means gluing down or floating, and it means the moisture in the slab has to be dealt with first. Building regulations expect a floor next to the ground to hold that moisture back: in England the requirement sits in Part C of Schedule 1 to the Building Regulations 2010, and Scotland has its own mandatory standard 3.4 on moisture from the ground.

There is one more check before any old floor comes up. The Health and Safety Executive says asbestos may be part of any commercial or domestic building built or refurbished before the year 2000, and old floor finishes are a classic hiding place, so what is underneath the carpet matters as much as what is going on top of it.

Solid, engineered and original boards: what suits a British house

  • Solid oak or ash boards: milled from one piece, can be sanded back several times over a long life, and the least tolerant of a damp or unstable base.
  • Engineered boards: a real timber wear layer bonded to a cross-laid core, far more stable when a centrally heated house dries out in winter, and the usual choice over a screed or over underfloor heating.
  • Wide planks: more movement across the width in solid timber, which is why wide-board floors are commonly specified as engineered.
  • Original pine floorboards: often worth lifting, cleaning, re-fixing and sanding rather than covering, though old boards vary in thickness and some will have been cut about by earlier plumbing work.
  • Parquet and block flooring: small blocks laid in herringbone or basket patterns, frequently bedded in black bitumen adhesive in older properties, which is a reason to have the adhesive checked before it is scraped up.
  • Prefinished versus site-finished: factory-finished boards go down and are walked on quickly, while site finishing gives one continuous film across the joints and lets the colour be matched to an existing floor.

Ground moisture, ventilated voids and the subfloor questions that decide the job

Part C of Schedule 1 to the Building Regulations 2010 requires that the walls, floors and roof of a building adequately protect the building and the people who use it from harmful effects caused by ground moisture, precipitation, condensation and spillage from sanitary fittings. Approved Document C is the England guidance that sits under it. Scotland's equivalent is mandatory standard 3.4, which requires that a building is designed and constructed so there is no threat to the building or to the health of the occupants from moisture penetration from the ground, with separate guidance for ground-supported concrete floors and for suspended timber floors.

Those rules describe what a new floor must achieve, not what an old one actually does. A solid floor poured before membranes were routine may be passing moisture upwards quietly for years without anyone noticing, because the covering over it was permeable. Glue a timber floor to that slab and the moisture has nowhere to go, so the adhesive lets go and the boards cup. This is why a fitter should be testing the slab rather than looking at it, and why the honest answer to when the floor can be laid over a fresh screed is after a test, not after a fixed number of days.

A suspended timber floor has the opposite failure mode: it depends on air. The Scottish guidance for suspended timber floors expects permanent ventilators in the external walls, and the same principle applies to any ventilated void. Blocking the airbricks with a new patio, a raised bed or a bank of decking starves that void of air, and damp, poorly ventilated timber is how a good new floor is ruined from below. Before boards go down, a fitter should also be checking for movement in the joists, since a floor that bounces will eventually show it in the finish.

Asbestos under an old floor, and what building control expects

HSE's position on age is blunt: asbestos may be part of any commercial or domestic building built or refurbished before the year 2000, and it was widely used in homes until 1999, when it was banned. Under an old timber or tiled floor the candidates are the bitumen adhesives and mastics used to stick blocks and tiles down, and floor tiles themselves, since asbestos was added to PVC and thermoplastic floor tiles, stair nosings, sheet materials and screed materials. If any of that turns up when the carpet comes off, HSE's instruction is to stop work immediately, confirm what the material is or assume it is asbestos, and carry out a risk assessment. HSE also tells householders not to try to repair or remove asbestos materials themselves without training for non-licensed asbestos work.

Fitting a wooden floor is not itself work that needs building control approval in England and Wales, where gov.uk lists the alterations that do, such as replacing a fuse box, installing a bathroom involving plumbing, replacing windows and doors, replacing roof coverings and installing or replacing a heating system. The picture changes if the work becomes structural, for example if joists are cut, notched or replaced, or if a floor is opened up as part of a larger project. Scotland runs a different system entirely: mygov.scot lists building or removing load-bearing walls and other structural elements among the work that needs a building warrant, and a warrant is valid for three years. Northern Ireland works to the Building Regulations (Northern Ireland) 2012 and its own technical booklets. Ask your fitter to say plainly whether anything they propose touches the structure.

How a hardwood floor is fitted, from survey to skirting boards

  • Survey: establishing whether the floor is suspended timber or solid, checking flatness and level, testing a slab or screed for moisture, and asking the age of the property so old adhesives and tiles can be considered.
  • Lifting: removing the existing covering carefully rather than chasing it with a grinder, and stopping if suspect tiles, backing paper or black bitumen adhesive appear.
  • Base preparation: screwing down loose boards to kill squeaks, overboarding with ply where a thin covering needs a flat deck, or applying a levelling compound to a slab.
  • Acclimatisation: leaving the boards in the room, in the conditions they will live in, for the period the manufacturer specifies, with the heating running as normal.
  • Fixing: secret nailing to joists or to a ply deck, full bonding to a prepared slab, or floating over an underlay, with an expansion gap kept at every wall, threshold, pipe and fixed unit.
  • Finishing: sanding and sealing or oiling if the boards went down raw, then refitting the skirting boards or fitting beading, and setting thresholds where the floor meets another covering.
  • Handover: spare boards kept from the same batch, written care instructions and any guarantee paperwork.

What goes under the boards: ply, screed, membranes and adhesives

Most of the craft in a timber floor is invisible once it is down. Over a slab, the options are a levelling compound to take out undulations, a liquid surface damp-proof membrane where the original protection cannot be relied upon, or a battened or ply deck that lifts the timber clear and gives something to fix into. Over joists, a ply overlay of the right thickness turns a set of springy floorboards into a flat, stable deck. The adhesive matters too, because the manufacturer specifies which products are compatible with their boards and with any membrane, and mixing systems is a common cause of a claim being refused.

Underfloor heating changes the specification rather than ruling timber out. Engineered boards are the usual answer because the cross-laid core moves less as the floor warms and cools, and thinner boards let heat through more readily than thick solid stock. Ask the fitter to confirm in writing that the specific product is approved for use over the specific heating system, and that the commissioning sequence will be followed: the screed brought up and back down before laying, and the floor brought up to temperature gradually afterwards rather than being switched on hard on the first cold morning.

Central heating, humidity and the gaps that open in a British winter

Timber takes up and gives off moisture with the air around it, so a wooden floor in an occupied British home is never completely still. The pattern is predictable: in winter the heating runs, indoor air gets drier, and fine gaps open between boards; in a humid summer the boards take moisture back and the gaps close. A floor that has been acclimatised properly and laid with the correct expansion allowance absorbs that cycle without complaint. One laid tight to the skirting boards in a damp autumn can lift or peak when it expands with nowhere to go.

Two practical habits help. Keep the house at a reasonably steady humidity rather than swinging between a closed-up, heavily heated week and an open-windowed one, and do not let a rush of drying happen just after fitting, which is what tends to happen when a room is redecorated, the heating is turned up and the windows are shut. If a new floor is going in over winter, it is also worth agreeing when the heating will be running during the work, because acclimatising boards in an unheated room and then heating it hard is asking the floor to move twice.

Looking after a timber floor between refinishes

  • Put a proper barrier mat at the front and back doors, because wet grit walked in from a path is what actually wears the finish.
  • Sweep or vacuum with a soft head rather than a beater bar, and mop only lightly damp with a cleaner made for the finish.
  • Never steam-clean a wooden floor unless the manufacturer says so, since forcing moisture into the joints is exactly the wrong thing to do.
  • Deal quickly with leaks from radiators, washing machines and dishwashers, as water tracks sideways under a fitted floor long before it shows on the surface.
  • Fit felt pads to furniture and lift rather than drag heavy items, and use a hard-floor castor cup under anything on wheels.
  • Recoat a lacquered floor when the sheen dulls in the traffic routes, before wear cuts through to bare timber, and re-oil an oiled floor on the schedule its maker gives.
  • Keep the spare boards from the original batch somewhere dry, because a later batch will rarely match a floor that has aged.

What drives a hardwood flooring quote, and how LokalMatch fits in

Comparing timber flooring quotes is really comparing what each fitter proposes to do below the boards. One price may cover lifting the old covering, a ply overlay, a moisture test and new skirting boards; another may assume the room is ready and the existing skirting stays. Ask each fitter to state the base preparation, the fixing method, the expansion allowance and who is redecorating afterwards, and the numbers become comparable.

LokalMatch is where that comparison starts. You describe the flooring job once, including the room sizes, whether the floor is solid or suspended timber, the age of the property and anything you already know about what is under the current covering, and matched flooring pros covering your postcode contact you directly. The professionals pay for the requests they receive. LokalMatch does not lay floors, does not set prices and does not vet, rank or recommend any contractor, so the references, insurance and written specification are still yours to check.

  • Whether the boards are solid or engineered, and the thickness of the wear layer on engineered stock.
  • The state of the base: loose floorboards, a bouncing joist, an uneven slab or a screed that still holds moisture all add a day before anything is laid.
  • Whether a surface damp-proof membrane, a levelling compound or a ply overlay is needed.
  • The fixing method, since bonding a floor to a slab is slower than floating one over an underlay.
  • Site finishing on bare boards, which brings sanding, dust control, sealing and drying time into the programme.
  • Stairs, thresholds and awkward rooms with bays, pipes and fitted units, all of which are cutting work rather than laying work.
  • Removing the skirting boards and refitting or replacing them, plus the redecoration that follows.
  • Clearing and disposing of the old floor, which can be a significant part of the job where old adhesive has to be dealt with by someone competent.

Hardwood Flooring: frequently asked questions

Can I lay solid wood flooring on a concrete floor downstairs?

Sometimes, but it is the harder route. Solid boards cannot be nailed into a slab, so they have to be bonded or laid on battens or a ply deck, and the slab has to be dry enough first. Regulations expect a floor next to the ground to resist ground moisture, in England through Part C of the Building Regulations 2010 and in Scotland through standard 3.4, but an older slab may have no working membrane at all. Most fitters will suggest engineered boards on a solid ground floor because they move less and can be bonded directly once the base has been tested and, where necessary, treated with a surface damp-proof membrane.

There is black adhesive under my old parquet. Is that a problem?

Treat it as a stop-and-check, not a scraping job. Bitumen adhesives and mastics were used to bed floor finishes, and HSE says asbestos may be present in any building built or refurbished before the year 2000, with asbestos added to products including PVC and thermoplastic floor tiles and screed materials. The instruction if you suspect it is to stop work immediately, confirm what the material is or assume it is asbestos, and have a risk assessment carried out. HSE also advises householders not to remove asbestos materials themselves without training for non-licensed work.

Why has my new wooden floor developed gaps over the winter?

Because timber gives up moisture to dry indoor air. When the heating runs through a British winter, boards shrink slightly across their width and fine gaps appear between them; when the air is more humid in summer they take that moisture back and close up again. Even seasonal movement in a floor that was acclimatised before fitting is normal. What is not normal is cupping, peaking or a floor lifting at the edges, which usually points to moisture coming from below or to an expansion gap that was too small or has been bridged by a heavy fitted unit.

Can I have a wood floor over underfloor heating?

Usually yes, with engineered boards and a proper commissioning sequence. The cross-laid core of engineered stock copes far better with warming and cooling than solid timber, and thinner boards let the heat through more readily. What matters is that the specific product is approved by its manufacturer for the specific system, that the screed has been brought up to temperature and back down before the floor goes down, and that the heating is raised gradually afterwards. Get all of that written into the quote rather than agreed verbally on the day.

Do I need building control involved to have a wooden floor fitted?

Not for the floor covering itself. In England and Wales, gov.uk lists the alterations that need building regulations approval, such as replacing a fuse box, installing a bathroom involving plumbing, replacing windows and doors or replacing a heating system, and laying a new covering is not among them. It is different if joists are cut or replaced or other structural work is involved. In Scotland, mygov.scot lists building or removing load-bearing walls and other structural elements among the work needing a building warrant, which is valid for three years, and Northern Ireland has its own regulations and technical booklets.

Should the skirting boards come off before the floor is laid?

It is a choice to make before the quote is agreed, not afterwards. Removing the skirting boards and refitting them over the finished floor hides the expansion gap neatly, but it risks damaging plaster and decoration and means redecorating. Leaving them in place and fitting beading against them is quicker and cheaper, but the bead is visible. Either way the gap itself is not optional on a floating or expanding floor, so decide who is doing the joinery and the painting, and get it written down.

Sources

  1. Building Regulations 2010, Schedule 1, Part C: site preparation and resistance to contaminants and moisture
  2. GOV.UK: Approved Document C, site preparation and resistance to contaminants and moisture (England)
  3. Scottish Government: building standards technical handbook 2022 domestic, standard 3.4 moisture from the ground
  4. HSE: asbestos frequently asked questions (buildings before 2000, banned 1999)
  5. HSE: where asbestos was used, including floor tiles, mastics and screed materials
  6. GOV.UK: building regulations approval (England and Wales)
  7. mygov.scot: building warrants

Written by the LokalMatch editorial team. Last reviewed 14 September 2026. How we write and check our guides

Find flooring contractors by city

England

Show 173 cities

What affects the cost of hardwood flooring

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Floor area and the number of rooms
  • Type and grade of flooring
  • Removal of the existing floor
  • Subfloor repairs or levelling
  • Stairs, angles and custom cuts
  • Trim, transitions and baseboards

How to compare flooring contractors before you hire

  • Choose an installer who works regularly with the type of flooring you want, since hardwood, tile, vinyl and carpet each need different skills.
  • Ask them to check the subfloor and moisture levels before giving a final price.
  • Get a written quote that covers removal of the old floor, subfloor prep, underlay, trim and transitions.
  • Ask whether you or the installer will supply the flooring, and who is responsible for ordering extra for waste.
  • Look at recent work in person or in photos, paying attention to seams, edges and transitions.

Questions to ask flooring contractors before you hire

  • Will you remove and dispose of the old flooring?
  • How will you check and prepare the subfloor?
  • Is my space suitable for this type of flooring, especially in a basement, kitchen or bathroom?
  • Are baseboards, transitions and stair nosings included?
  • Will you move the furniture and appliances, or should I?
  • Does your workmanship warranty cover problems like lifting, gaps or cracked tiles?

Hardwood flooring permits and local rules

Some hardwood flooring work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get hardwood flooring quotes?

Tell us about your hardwood flooring project.

Do you offer hardwood flooring services?

Join LokalMatch to get matched with homeowners in the areas you serve.