Older homes hide hazards you can't see. Asbestos may be in plaster, tiles, insulation and pipe wrap, and older paint may contain lead, so suspect materials are tested before anything is disturbed. Load-bearing walls, gas and electrical lines and buried utilities each call for the right specialist, never a guess or a sledgehammer.
Read on for the types of demolition, permits, utility disconnections, asbestos and lead, waste sorting, dust and noise, locates before digging, and when a structural engineer is needed.
Interior strip-out, structural demolition or full house demolition
The type of demolition sets the permit, the crew, the equipment and the precautions, so describe exactly what should come out and what must stay, with photos and any plans you have.
- Interior strip-out: removing finishes such as drywall, plaster, flooring, cabinets and fixtures while the structure stays, typically before a kitchen, bathroom or basement renovation.
- Partial structural demolition: taking out a wall, opening a floor, or removing a chimney, a porch or an addition, where part of the structure is affected and must be supported and redesigned.
- Accessory structures: garages, sheds, decks, pools and fences, smaller jobs that can still involve permits, utilities and disposal.
- Full house demolition: taking the whole building down to clear the lot, including the foundation where required, usually with heavy equipment.
- Deconstruction: taking a building apart piece by piece to salvage wood, doors, fixtures and other reusable materials, which takes longer but sends less to landfill.
Demolition permits: what your municipality requires
Taking down a house, a garage or any part of a building's structure generally requires a municipal demolition permit, and cities often add rules on heritage buildings, trees and notice to neighbours. In Toronto, for example, an application for a residential demolition permit with a replacement building includes a survey or grading plan showing the existing house, the property lines and the lot area, along with forms such as an infill public notice declaration, the owner's acknowledgement of demolition control conditions, a municipal road damage form and a tree declaration.
In Quebec, demolition is governed by each municipality's bylaws, and older or heritage buildings may face a more detailed review before a permit is issued. An interior strip-out may be covered by the renovation permit rather than a separate demolition permit. Your city's permit office can tell you which applies; start early, and agree in writing on who files the application.
Before and during demolition: utility disconnections, dust and noise
Gas, electricity, water and telecommunications have to be shut off and disconnected before a building, or part of one, comes down. That work belongs to the utilities themselves or to licensed trades working with them, not to the demolition crew and never to the homeowner. For a full demolition, contact each utility early, since removing a meter or cutting a service at the property line has to be scheduled, and get written confirmation of each disconnection before work starts. For an interior strip-out, a licensed electrician and plumber make the affected circuits and pipes safe, and a qualified gas technician caps any gas line, before the crew begins.
- Many municipal noise bylaws restrict construction noise to certain hours and days, so ask the contractor to schedule the loudest work accordingly.
- Dust control means sealing off the work area with plastic sheeting, covering vents and returns, using negative air machines where needed and wetting down debris outdoors.
- Protect what stays: floors, stairs, windows and the neighbours' property, including fences and cars near the site.
- Talk to neighbours before the work starts, especially in semi-detached homes, row houses and duplexes where walls are shared.
Asbestos and lead in older homes: testing before demolition
Health Canada lists siding, cement and plaster, floor and ceiling tiles, roofing products, paint, putty, drywall, caulking, sealants, spackling and insulation, including around hot water pipes and tanks, among the materials in older homes that may contain asbestos. It poses no significant health risk when left undisturbed in materials in good condition, but demolition disturbs everything. Health Canada advises having a professional test for asbestos before renovating and hiring a qualified asbestos removal specialist to remove it if it's found. In practice, that means a survey of suspect materials before any demolition, and removal by specialists before the general crew starts. In Quebec, construction sites where asbestos may be disturbed also fall under the CNESST's workplace safety requirements, so ask the contractor how it meets them.
Lead is the other common hazard. Health Canada says a home built before 1960 probably contains lead-based paint, and one built between 1960 and 1990 may have it on the exterior. Sanders, heat guns and torches turn it into toxic dust and fumes, and even small amounts of lead dust are dangerous to infants and children, so keep children away from the site and ask how the crew will contain and clean up dust. None of this is do-it-yourself work.
When demolition needs a structural engineer: load-bearing walls and partial removals
Removing or cutting into a load-bearing wall, a beam, a post, floor joists, a chimney or part of a foundation changes how loads travel through the house. That calls for a structural engineer's design, which specifies the new beam or support, the temporary shoring during the work and how loads will reach the foundation, and stamped drawings are often needed for the permit. Don't assume a wall isn't structural because it looks thin or runs a certain way; only a qualified professional can confirm it.
- Jobs that usually call for an engineer: removing or shortening a load-bearing wall, widening an opening in an exterior or foundation wall, cutting joists for a new stair, or taking out a chimney the framing relies on.
- Semi-detached homes, row houses and duplexes need extra care, since a shared wall or foundation also carries the neighbour's house.
- Temporary shoring goes in before anything structural comes out and stays until the new support is installed.
Demolition waste: sorting materials for recycling and disposal
Demolition produces large amounts of mixed waste, and sorting it on site is what allows much of it to be reused or recycled. Metal, clean wood, concrete, brick and asphalt shingles have recycling outlets in many regions, while drywall, insulation and mixed debris often go to sorting centres or disposal. Hazardous materials are kept apart and go only to facilities authorized to take them; Montreal's drop-off centres, for example, accept construction, renovation and demolition debris from residents but refuse asbestos.
- Salvage first: doors, cabinets, fixtures, hardwood and trim in good condition can be sold or donated before demolition starts.
- Ask the contractor how debris will be sorted, which bins will be on site and where each material ends up.
- Ask the asbestos specialist for proof that its waste went to an authorized disposal site.
Locates before digging out a foundation: Info-Excavation and Ontario One Call
Removing a foundation, a slab, a pool or a buried oil tank, or digging for a new foundation, means excavating near gas, electrical, water and telecom lines. In Quebec, the Régie du bâtiment du Québec asks contractors to submit a free locate request to Info-Excavation at least 4 business days before excavation begins. In Ontario, a locate through Ontario One Call is free and required by law, and should be requested at least 5 business days before digging. These services don't mark private lines, such as power to a detached garage or a gas line to an outdoor heater, so point out any you know about.
Demolition: frequently asked questions
Do I need a permit to demolish a house?
In most cases, yes. Demolishing a house or another building generally requires a municipal demolition permit, and some cities add conditions about replacement buildings, trees, heritage status and notice to neighbours. Check with your city's permit office before signing a contract.
Do I need an asbestos test before interior demolition?
In an older home, yes. Health Canada advises having a professional test for asbestos before renovating, since it can be in plaster, drywall, tiles, insulation and more. If it's found, a qualified specialist removes it before the rest of the demolition goes ahead.
Can I knock down a wall myself to save on demolition?
Not a load-bearing wall, and not any wall without knowing what's inside it. Removing structure without an engineer's design and shoring can cause sagging or collapse, and walls can hide wiring, plumbing, gas lines and, in older homes, asbestos.
Does a demolition contractor haul away the debris?
Usually, yes, but confirm it in the contract: who supplies the bins, who covers disposal, whether sorting and recycling are included, and whether the site is left broom-clean or graded. Asbestos waste is handled separately by the specialist that removed it.