Skip to content
LokalMatch

For home-service pros

Get bathroom renovation leads in Australia

Bathroom requests start with the scope: a full renovation, a tub or shower only, a refresh of the vanity, fixtures and tile, accessibility changes, or a new bathroom where there isn’t one. Homeowners also say which room (main bathroom, ensuite, powder room or basement bathroom) and the type of property.

Free to create a profile · No subscription required

Page reviewed 11 September 2026

What a bathroom renovation lead shows you

Every {lower} request answers these questions before it reaches you. Follow-up questions appear only when an earlier answer calls for them.

A new basement bathroom means new drains and venting, while a vanity refresh may not touch the plumbing at all, and the preview shows which one you’re looking at. Accessibility requests are their own choice, so if you install grab bars, curbless showers or tub conversions, you can say yes to exactly that work.

  1. How big is the project?

    • Full renovation
    • Tub or shower only
    • Refresh (vanity, fixtures, tile)
    • Accessibility changes
    • New bathroom where there isn’t one
  2. Which bathroom?

    Optional
    • Main bathroom
    • Ensuite
    • Powder room
    • Basement bathroom
  3. What type of property is it?

    • Detached house
    • Semi-detached or townhouse
    • Condo or apartment
    • Cottage or cabin
    • Duplex or multi-unit
    • Commercial property

Every request also includes

When the work is needed
  • Emergency / as soon as possible
  • Within a few days
  • Within a few weeks
  • Flexible / still planning
Budget range, if the homeowner picks one
  • Up to $1,000
  • $1,000–$5,000
  • $5,000–$10,000
  • $10,000–$25,000
  • $25,000 and up

Amounts in AUD.

Project summary
A short description of the job in the homeowner’s own words.
General location
The city or postal area. The exact address is shared only after you connect.
Photos
Up to 6 optional photos. Before you connect, you see how many were added.

Services you can choose

When you set up your profile, pick the ones you do and mark the rest as not for you.

The guide homeowners get on this site

We publish a bathroom renovation guide for homeowners. It is written for them, not for us, and its headings are a fair list of what someone who has read it will ask you about.

Read the bathroom renovation guide

What the guide covers

  • How a bathroom is built back up, and the hold points that matter
  • Membranes, tiles and tapware: what AS 3740 and WaterMark cover
  • Licences and approvals for a wet area, including who may lay the membrane
  • Signs that waterproofing has failed in an existing bathroom
  • Leaks that spread, apartments and asbestos in old wet areas
  • Exhaust, condensation and keeping a new bathroom sound
  • Insurance, statutory warranties and what to do about a leaking new bathroom

Questions it answers

  • How high do shower walls have to be waterproofed?
  • Is waterproofing a licensed trade in Australia?
  • Why does a small bathroom take so many weeks?
  • Do I need approval to renovate a bathroom?
  • Does the floor really need to fall to a floor waste?
  • How do I find bathroom renovators near me?

Guide last checked 14 September 2026.

What bathroom renovation leads cost

LokalMatch sets lead prices by service and location. You see the price of each lead before you decide, and you pay only when you choose to connect.

See how leads work

Current lead price

Pricing is set per request.

  • We haven’t published a standard price for bathroom renovation leads yet. You see the price of each lead before you decide, and you pay only when you choose to connect.

Licensing notes by province

These notes come from our provincial permit guides, which homeowners read before they hire. They summarize official sources and aren’t legal advice.

Browse all permit guides
  • Australian Capital Territory

    To provide a construction service in the ACT you need a licence, and the ACT lists who that covers: builders including owner-builders, electricians, plumbers, drainers and gasfitters, building surveyors, building assessors, gas appliance workers, works assessors and plumbing plan certifiers. The ACT is equally clear that trades like carpenters and bricklayers do not currently need a licence there, so a licence check is not a substitute for references on those trades. There are four classes of builder licence, each with a different scope of work.

    Sources: ACT Government – Construction licences

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

  • New South Wales

    A contractor licence is required to carry out, advertise or contract for building or trade work valued above a threshold NSW sets, measured on labour and materials including GST. The licence may be an individual or an endorsed contractor licence, a company or partnership contractor licence, or be paired with a qualified supervisor certificate.

    Sources: NSW Government – General building work licence

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

  • Northern Territory

    You must use a registered builder for prescribed residential building work. Work is prescribed if it is worth more than a value threshold the NT sets and involves particular buildings — class 1a and class 2 buildings, extensions or renovations that increase floor area, attached class 10 buildings, certain retaining walls, or relocating an existing building. You must also sign a contract with your builder for prescribed building work.

    Sources: NT Government – What is prescribed residential building work · NT Government – Residential building work that requires a registered builder

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

  • Queensland

    QBCC states that individuals and companies must hold a licence to carry out — that is, to contract for — building work above a value threshold it sets. In most cases you do not need your own licence if you are doing the work as an employee of a licensed contractor. Ask for the licence number and check it on the QBCC register.

    Sources: QBCC – When you need a licence

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

  • South Australia

    The trigger in South Australia is the activity, not the value. Individuals and businesses must be licensed as building contractors — including subcontractors running a business — if they carry out or organise building work for others, or to sell or let land or buildings. All building work must be supervised by a registered building work supervisor.

    Sources: SA.GOV.AU – Building work contractor's licence

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

  • Tasmania

    Builder licences in Tasmania come in three classes: Builder (General Construction), which manages or carries out building work, demolition, alterations, additions, relocations or repairs; Fire protection services builder; and Demolisher. Check the class covers the work you are hiring for, not just that a licence exists.

    Sources: CBOS – Builder licence

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

  • Victoria

    A company must be registered as a building practitioner to enter into major domestic building contracts, or to be named as builder on a building permit for major domestic building work or other work above a value threshold. The BPC warns that serious penalties apply for saying, or implying, that you or your company are registered when that is not true.

    Sources: Building and Plumbing Commission – Registration requirements and eligibility

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

  • Western Australia

    Western Australia states plainly that it is illegal for an individual, partnership or company to contract for or carry out a building service without first having the appropriate licence or registration from Building and Energy, and advises always checking that a provider's registration is current before you enter an agreement. Most other building work above a value threshold that also needs a building permit must be carried out by a registered builder.

    Sources: WA Government – Find a registered building service provider · Building and Energy – Building or renovating your home

    The National Construction Code sets the technical provisions for designing and constructing buildings and plumbing and drainage systems, but it has no force of its own: the ABCB states that the NCC is given legal effect through state and territory building and plumbing legislation, and that adoption dates are set by each state's administration. Requirements can apply at different times, or not at all, because of state variations — and the ABCB notes that gasfitting and electrical work are not covered by the NCC at all.

    Sources: ABCB – About the National Construction Code · ABCB – NCC 2025 state and territory adoption information · ABCB – Information for homeowners

How matching works

Requests are matched by published rules that are the same for every pro.

How we rank and match pros
  • You receive a request only for services you offer and haven’t excluded, in the areas you serve.
  • Your account must be active, with your email address and phone number verified, and you must be accepting new requests within the daily or weekly limits you set.
  • Requests reach you only with timings you accept, such as emergencies, and budgets that aren’t clearly outside the range you work in.
  • When more pros fit than a lead allows, we give more weight to an exact service match, how directly you cover the area, verification, how quickly you reply and, once you have at least three published reviews, your rating. Never to who pays more.
  • Each lead goes to a limited number of pros, and you see that number before you decide.

Invalid leads and refunds

If a lead turns out to be invalid, you can ask for a refund review from your dashboard. We look at each request and let you know the outcome. A lead may qualify when:

  • The contact details are wrong or don't work.
  • It duplicates a lead you already received.
  • It isn't a real request for work.
  • It's outside the services or areas you listed.
See how leads work

Verification you’ll need

Before you receive leads, you confirm your business email and phone number with one-time codes. Business registration, licence and insurance details are optional during sign-up; once our team checks them, your profile shows what was verified and when.

  • Contact details verified

    You confirm your business email and phone number with one-time codes. This is required before you receive leads.

  • Business registration checked

    Our team reviews the registration details you provide.

  • Licence and insurance checked

    Where your trade calls for a licence or insurance, we review what you provide.

Verification shows which details were checked and when. It isn’t a guarantee of workmanship, and it can’t be bought.

Read how verification works

Getting set up for bathroom work

  • Plumbing in a bathroom renovation falls under local plumbing rules; the notes below show what our permit guides say.
  • If you don’t do accessibility work, leave that service off.
  • Photos of your tile work and waterproofing details say more than a list of services.

Start getting bathroom renovation leads

Creating a profile is free and there is no subscription. You pay only for the leads you decide to take.