Heated Floors near you

Underfloor heating turns the floor itself into the emitter, so the room warms from a large, low-temperature surface instead of from a hot panel on a wall. In British homes it appears in two very different forms. Electric systems are mats or loose cable set in a levelling compound or adhesive bed, usually retrofitted to one room at a time and most often a bathroom or kitchen. Wet systems circulate warm water through pipes in a screed or in a low-profile panel, are run from the boiler or heat pump, and are normally whole-floor or whole-house decisions.

Tell us about your heated floor project and we’ll help you find local flooring contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

The choice is rarely about which is better. It is about build-up height, how the house is heated already, and how the room is used. An electric mat adds a few millimetres and can be run from an existing heating system's independent controls, but electricity is the expensive fuel to heat with. A wet system is cheap to run behind a heat pump and terrible to retrofit under a floor with no height to spare.

There is one thing an electric system brings that a wet one usually does not: an electrician and a notification. Fixed electrical work in a dwelling in England falls under Part P of the Building Regulations, and the rules are drawn differently in Wales, differently again in Scotland, and Northern Ireland's building regulations do not cover electrical safety at all. That is worth getting straight before the mat is ordered.

Mats, loose cable, low-profile wet systems and heated screeds

  • Electric heating mat: cable pre-spaced on a mesh, rolled out and set in adhesive or compound, the fastest retrofit and the easiest to get wrong around fixed units.
  • Loose electric cable: laid at a spacing chosen on site, which suits awkward room shapes where a fixed-width mat wastes area.
  • Foil or film systems: laid dry beneath a floating floor, avoiding a wet trade altogether but limited in the coverings they work under.
  • Wet pipe in a full screed: the traditional installation, high thermal mass, slow to respond and the most efficient to run at low flow temperatures.
  • Low-profile wet overlay panels: grooved boards taking a smaller-diameter pipe, designed for retrofit where build-up height is the constraint.
  • Pipe clipped between joists: used on suspended timber floors, with insulation beneath so the heat goes upwards rather than into the void.
  • Electric under a stone or tile floor in a bathroom, which is the single most common domestic installation and the one with the strictest electrical rules.

Notification: England, Wales, Scotland and Northern Ireland draw the line differently

In England, Approved Document P — the 2013 edition, which took effect on 6 April 2013 and is for use in England — applies to electrical installations in a dwelling-house or flat. An electric underfloor heating system is fixed electrical equipment and will normally be run from a new dedicated circuit, and a new circuit is one of the categories that must be notified. If it is going into a bathroom, the room is a special location and any addition or alteration to existing circuits there is notifiable too, not just a new circuit. Approved Document P sets three routes for getting notifiable work certified: self-certification by a registered competent person, certification by a registered third-party certifier, or certification by a building control body, and it gives the paperwork deadlines, including that a competent person or their registration body must give a Building Regulations compliance certificate to the occupier and to the building control body within 30 days of completion.

Wales draws the notifiable line more widely and it is a genuine difference rather than a wording change. Welsh Government guidance says you do not need to report replacing an electrical fitting such as a socket outlet, light fitting or control switch, any repair or maintenance work, or extra power points, lighting points or other alterations to existing circuits — except in a kitchen or bathroom, or outdoors. Adding a fused spur to an existing circuit is likewise exempt except in a kitchen, bathroom or outdoors. So an alteration that would be non-notifiable in an English kitchen is notifiable in a Welsh one.

Scotland and Northern Ireland are different systems again. In Scotland, schedule 3 to the Building (Scotland) Regulations 2004 lists work that may be done without a warrant but must still meet the standards, and the Scottish Government's own research into the regulation of electricians records that rewiring and wiring to artificial lighting need a warrant in flats and buildings over three storeys while houses up to two storeys are exempt, and that electrical work affecting a separating wall needs a warrant across all domestic building types. Scotland also has approved certifiers of construction who can certify that electrical work meets the regulations. Northern Ireland has no equivalent at all in its building regulations: the technical booklets published under the Building Regulations (Northern Ireland) 2012 run from B to V and there is no booklet for electrical safety.

What Part L expects of an underfloor heating installation

Approved Document L volume 1, the 2021 edition incorporating the 2023 amendments, has a short section devoted to underfloor heating, and it is unusually specific for guidance that homeowners rarely read. New underfloor heating systems should all have controls to adjust the operating temperature. Room thermostats for electric underfloor heating systems should have a manual override. Heating systems for screed floors greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied — a recognition that a thick heated screed cannot respond quickly and has to be managed by anticipation rather than by reaction.

The insulation requirements underneath are where most retrofit arguments happen, because they take up the height nobody has. Ground floors and floors in contact with the outside should be insulated to limit heat losses to not more than 10W/m2, calculated from the thermal resistance of the floor finish and the underlying heated layer. Systems intended for intermittent or cyclical operation, or installed over unheated rooms, should be separated from the structural floor by insulation with a thermal resistance of at least 1.25(m2·K)/W. For an intermediate floor, the insulation layer reducing downward heat transmission should meet either that performance or the figures in BS EN 1264-4: not less than 0.5(m2·K)/W for electric systems and not less than 0.75(m2·K)/W for wet systems.

The practical reading is simple. Insulation under a heated floor is not an optional upgrade that improves efficiency at the margins; without it a significant share of the heat goes downwards into a slab, a void or the room below, and the floor above never feels as warm as expected. If a quotation for a retrofit does not mention insulation board beneath the heating layer, that is the first question to ask. Approved Document L is the England guidance; Scotland handles the same requirements through section 6 of its technical handbook and Northern Ireland through Technical Booklet F1.

How a heated floor is installed and commissioned

  • Heat loss calculation for the room, because underfloor heating works at a low surface temperature and cannot be oversized to compensate for a cold, draughty room.
  • Decide the build-up: insulation board, heating layer, screed or compound, finished covering — and check the resulting floor height at every doorway before anything is ordered.
  • Lay the insulation first, so the heat goes upwards rather than into the slab or the void beneath.
  • Set out the heating: mat or cable spacing planned around fixed units, baths and toilets, because you must never heat under a kitchen island or a fitted wardrobe.
  • Fix the floor sensor in a conduit so it sits between cable runs and can be replaced later without breaking out the floor, which is the single most valuable detail in the whole job.
  • Test the cable's resistance before, during and after the floor goes over it, and record the readings; a fault found afterwards is a demolition job.
  • Cover with compound, screed or adhesive, then leave it: the heating stays off through the full cure period the material specifies.
  • Commission gradually, bringing the floor up and back down as the covering's manufacturer requires, and hand over the certificates, the sensor location and the layout drawing.

Electric or wet, room by room

Electric wins on retrofit. It adds only a few millimetres, it needs no connection to the boiler or the heat pump, one room can be done without touching the rest of the house, and it heats up quickly enough to be used on a timer in a bathroom. The catch is running cost: electricity is the expensive way to make heat, which makes electric underfloor heating sensible as comfort heating in a small room and expensive as the main heat source for a large one.

Wet wins on running cost and on whole-house heating, especially behind a heat pump, because a large floor area at a low temperature is exactly the sort of emitter a heat pump wants. The price is disruption and height: a proper screed is a wet trade with a long drying period, low-profile panels still add build-up, and clipping pipes between joists means lifting the floor. It also has to be integrated with the rest of the heating system, with its own manifold, actuators and controls.

Where both are possible, the deciding questions are usually mundane. How much height is there at the doorways. Is there a manifold position with access to it. Is the room used for half an hour twice a day or all day. Is the house heated by a boiler that runs hot, which suits radiators, or a heat pump that runs cool, which suits a floor. Answer those and the choice generally makes itself.

A cold patch, a tripping RCD and the cable nobody can find

  • A cold area over part of the room, usually insulation missing beneath that section or cable spacing that was opened up to make the mat fit.
  • The residual current device tripping when the heating comes on, which points to damage to the cable and is a job for an electrician rather than for a reset button.
  • A failed floor sensor, cheap to replace when it sits in a conduit and a significant repair when it was buried directly in the screed.
  • A floor that takes hours to respond, normal for a thick heated screed and the reason Approved Document L expects automatic setback for screeds over 65mm.
  • Damage from a later trade, since a screw through a heating cable while fitting a threshold or a kitchen plinth is one of the commonest causes of failure.
  • A covering that was not approved for use over heating, leading to gapping, delamination or a maximum surface temperature being exceeded.
  • No layout drawing at handover, which makes every future fixing into that floor a gamble.

What a heated floor quote turns on, and how LokalMatch fits in

Electric and wet systems are priced on entirely different things, so compare like with like. An electric quote turns on the heated area rather than the room area, the type of mat or cable, the insulation board underneath, the levelling compound or adhesive bed over it, the thermostat, and the electrical work — which is where the cost sits if a new circuit has to be run from the consumer unit and certified. A wet quote turns on the number of zones and loops, the manifold and its position, the screed or overlay system, the pipework back to the heat source, the controls, and the drying and commissioning time. Build-up height drives both, because the cheapest system is the one the doorways can accommodate.

LokalMatch is the introduction, not the installation. Describe the job once with your postcode — which rooms, what the floor is now, how much height you have and how the house is heated — and heating and flooring pros covering your area get in touch with you. It costs a homeowner nothing to post the job; the pros pay for the requests they receive. LokalMatch does not install heating, does not set prices and does not vet, rank or recommend anyone, so confirming who is certifying the electrical work, and to whom, remains something to settle before the job starts.

Heated Floors: frequently asked questions

Does electric underfloor heating need to be notified to building control?

In England, usually yes, because it normally needs a new dedicated circuit and a new circuit is notifiable under Part P; and if it is going into a bathroom, that room is a special location where alterations to existing circuits are notifiable too. Approved Document P, the 2013 edition, allows three routes: self-certification by a registered competent person, certification by a registered third-party certifier, or certification by a building control body, with a compliance certificate to the occupier within 30 days. Wales has a wider notifiable list, Scotland uses the building warrant system with approved certifiers, and Northern Ireland's building regulations have no technical booklet covering electrical safety.

Do I need insulation under underfloor heating?

Yes, and Approved Document L volume 1 attaches figures to it rather than leaving it to judgement. A heated ground floor, or one exposed to the outside, has a cap on how much heat may be lost through it, and a system meant to be switched on and off, or sitting above an unheated room, has a minimum thermal resistance specified for the layer separating it from the structure below. An intermediate floor can meet either that performance or the separate values BS EN 1264-4 gives for electric and for wet systems. Skip the insulation and much of the output disappears downwards, which is the usual reason a retrofitted floor never feels as warm as the brochure promised.

Can underfloor heating go under any floor covering?

No, and this is where guarantees are most often lost. Every covering has a stated position on underfloor heating and usually a maximum surface temperature, and the specific product has to be approved for the specific system in writing rather than in general terms. Tile and stone are the natural partners because they conduct heat well and do not mind the cycling. Engineered timber is usually fine and solid timber usually is not. Thick carpet and a dense underlay can insulate the floor from the room. Get the approval and the maximum surface temperature into the quote, and make sure the controls will actually enforce it.

Why is my heated floor slow to warm up?

If it is a wet system in a full screed, that is inherent rather than a fault: a thick heated screed stores a lot of heat and responds slowly in both directions, which is why Approved Document L expects heating systems for screed floors thicker than 65mm to reduce the room temperature automatically at night or when the room is unoccupied. Such a system should be run on a long, gentle schedule rather than switched on for an hour. If an electric mat is slow, the usual suspect is missing or inadequate insulation beneath it, which sends much of the output downwards before the surface ever gets warm.

What happens if the heating cable fails after the floor is laid?

It depends almost entirely on what was done during installation. A failed floor sensor is a straightforward swap if it was installed in a conduit and a major repair if it was buried in the screed. A damaged heating cable can sometimes be located with specialist equipment and repaired through a small opening, but that relies on having a layout drawing showing where the runs go. This is why the resistance readings taken before, during and after covering, and the layout drawing at handover, are worth insisting on: they are what makes a later fault a repair rather than a new floor.

Sources

  1. GOV.UK: Approved Document P, electrical safety in dwellings (2013 edition, for use in England)
  2. GOV.WALES: building regulations and electrics, notifiable and non-notifiable work in Wales
  3. GOV.UK: competent person schemes, current schemes and how schemes are authorised
  4. Scottish Government: regulation of electricians in Scotland, appendix 3 on the Scottish building regulations
  5. Scottish Government: building standards technical handbook, work not requiring a building warrant
  6. Building Control Northern Ireland: technical booklets under the Building Regulations (Northern Ireland) 2012
  7. GOV.UK: Approved Document L, conservation of fuel and power (volume 1, dwellings, underfloor heating in section 6)

Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides

Find flooring contractors by city

England

Show 173 cities

What affects the cost of heated floor

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Floor area and the number of rooms
  • Type and grade of flooring
  • Removal of the existing floor
  • Subfloor repairs or levelling
  • Stairs, angles and custom cuts
  • Trim, transitions and baseboards

How to compare flooring contractors before you hire

  • Choose an installer who works regularly with the type of flooring you want, since hardwood, tile, vinyl and carpet each need different skills.
  • Ask them to check the subfloor and moisture levels before giving a final price.
  • Get a written quote that covers removal of the old floor, subfloor prep, underlay, trim and transitions.
  • Ask whether you or the installer will supply the flooring, and who is responsible for ordering extra for waste.
  • Look at recent work in person or in photos, paying attention to seams, edges and transitions.

Questions to ask flooring contractors before you hire

  • Will you remove and dispose of the old flooring?
  • How will you check and prepare the subfloor?
  • Is my space suitable for this type of flooring, especially in a basement, kitchen or bathroom?
  • Are baseboards, transitions and stair nosings included?
  • Will you move the furniture and appliances, or should I?
  • Does your workmanship warranty cover problems like lifting, gaps or cracked tiles?

Heated floor permits and local rules

Some heated floor work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get heated floor quotes?

Tell us about your heated floor project.

Do you offer heated floor services?

Join LokalMatch to get matched with homeowners in the areas you serve.