Skip to content
LokalMatch

Permit & Drawing Services

Permit & Drawing Services near you

Prepare drawings and paperwork for a building permit. Tell us about your permit drawing project and we’ll help you find local designers who serve your area.

Free for homeowners · No obligation to hire

On this page

Permit drawings are the plans a municipality reviews before it allows construction to begin. For a new house, an addition, a basement unit, a garage or a deck, they show what will be built, where it sits on the lot and how it meets the building code, and they go in with the application form and whatever supporting documents the municipality lists. A permit drawing service prepares that package and often files it and follows it through review.

It's a narrower job than designing a home from scratch. You may already know the layout you want, have a contractor ready to start, or need drawings to bring earlier work done without a permit into compliance. The service turns that intent into a set an examiner can approve: it checks zoning early, uses a professional qualified for the size of the building and anticipates the forms and details the permit office will ask for.

This page explains who may prepare permit drawings in Ontario and Quebec, what a real municipal checklist contains, how review works from submission to issued permit, and the most common reasons a set is sent back for revisions.

Who can prepare permit drawings: BCIN-registered designers, architects and engineers

Ontario's guide to building permits tells homeowners to confirm, before hiring or paying anyone to prepare design plans for a permit application, that the person is registered with the Ministry of Municipal Affairs and Housing on the QuARTS public search registry. Registered designers hold a Building Code Identification Number (BCIN), and for a residential project the House qualification is the one to look for. Toronto's new-house application guide asks for a Schedule 1 designer information form from every designer except engineers and architects, whose own licences already answer for their qualifications.

In Quebec, the question turns on the architect. The provincial Architects Act sets size limits above which plans must be signed and sealed by an architect, as our architects page explains, and structural elements are sealed by an engineer when the work calls for one. Below those limits, technologists and drafting services prepare most residential permit sets. Each municipality decides which documents it wants with an application, so call the local permit office before drawing starts rather than after.

What goes into a new-house permit application: Toronto's checklist as an example

Every municipality publishes its own list, but Toronto's guide for a new house shows how much more than floor plans an examiner expects. An addition, a garage or a deck needs only part of it, and your own municipality's guide is the one that counts.

  • A site plan with property lines, easements and setbacks, plus a summary of permitted and proposed zoning figures such as lot area, gross floor area and coverage.
  • A lot grading plan designed so that water doesn't pond on your property or the neighbours'.
  • Fully dimensioned floor plans for every level, showing room uses and the locations of smoke alarms, carbon monoxide alarms and plumbing fixtures.
  • A roof plan, with truss and floor joist drawings when engineered framing systems are proposed.
  • Elevations showing finishes, window and door sizes, building height and the area of exposed building face and unprotected openings used in the code's spatial separation checks.
  • Cross-sections and footing and foundation details that describe each floor, wall and roof assembly.
  • Forms, including the Schedule 1 designer information, an energy efficiency design summary, an engineering responsibility form when sealed drawings are included, and a tree declaration.

From zoning check to issued permit: how building permit review works in Ontario

Start with zoning, not drawings. Toronto offers a zoning review before you apply that identifies which zoning and other applicable law requirements apply to a property, and its property information reports and building records can turn up earlier permits and drawings for the house. If the project needs a minor variance, the Committee of Adjustment has to grant it first: Ontario's guide states that a permit will not be issued until the zoning change or variance has been obtained.

Once a complete application is filed, a building code examiner reviews the drawings against the Ontario Building Code, including heating, ventilation and plumbing where they apply, and a zoning examiner confirms the project complies with the zoning bylaw and other applicable law. The Building Code sets review time frames for complete applications, and for a house it is 10 days. If the municipality refuses the application, it has to tell you why. The time frame only applies to a complete application, so a thorough, consistent set does more for your schedule than fast drafting.

After issue, the approved drawings become the reference for every inspection. Ontario's guide says the building official must carry out an inspection within two working days of being notified that a stage is ready, so keep the stamped set on site where the inspector and the trades can check it.

Why permit drawings get sent back: common deficiencies and how revisions are resubmitted

In Toronto, an application that doesn't comply receives a notice documenting why. Revised drawings go back through the city's online file submission hub as a single PDF, with revision bubbles marking each change so the examiner can find them quickly. Most deficiencies are avoidable with a careful review before the first submission.

  • Zoning figures on the site plan that don't match the drawings, or a setback, height or coverage limit nobody checked.
  • Sheets that contradict each other, such as a window placed differently on the floor plan and on the elevation.
  • Missing structural information for beams, lintels, footings or engineered floor and roof systems.
  • Energy efficiency information that doesn't match the wall, roof and window specifications shown in the sections.
  • Grading or drainage information left off a new house or a large addition.
  • Unsigned drawings, incomplete forms or a designer whose registration doesn't cover the type of building.

Permit drawings only, permit expediting or a full design service: choosing the right mandate

A permit-only mandate suits a project whose layout is already settled, such as a deck, a straightforward basement unit or an addition with a clear footprint. Permit expediting, which some offices offer separately, concentrates on assembling forms, filing the application and following up with the municipality rather than on drawing. If you still need to work out the layout, the look or how the project fits your budget, start with our building design page. If your contractor needs more detail to price and build from, see our construction drawings page, since a permit set rarely holds everything a crew needs on site.

Permit & Drawing Services: frequently asked questions

How long does it take to get a building permit for a house in Ontario?

The Building Code gives municipalities 10 days to decide on a complete application for a house. That clock starts only once nothing is missing, and it doesn't cover zoning approvals such as a minor variance. Drafting, zoning checks and revision rounds usually take longer than the review itself.

What happens if my project doesn't meet the zoning bylaw?

You can redesign the project to fit, or apply to the Committee of Adjustment or your municipality's equivalent for a minor variance. The building permit won't be issued until the variance is granted, so settle zoning before you pay for a finished permit set.

Can I prepare my own permit drawings?

Some municipalities accept owner-prepared drawings for simple projects, but they're held to the same standard as a professional set, and structural elements may still need an engineer. Ask your permit office what it accepts before you start drawing.

Do I need drawings to legalize work done without a permit?

Usually, yes. The municipality will want drawings of what was built, and inspectors may ask to open walls or ceilings to see the framing, insulation or wiring inside. A designer can measure the existing work and draw it, with an engineer's review if structure is involved.

Can I reuse the drawings from a previous owner's permit?

Old drawings from municipal building records are a helpful starting point for existing conditions, but a new application needs drawings of the current project under the current code. Someone else's design may also be protected by copyright, so have your designer verify existing conditions on site and draw the new work fresh.

Sources

  1. Building permits — Citizen's guide to land use planning, Government of Ontario
  2. Become a registered building practitioner — Government of Ontario
  3. New house: building permit application guide — City of Toronto
  4. Plan review process — City of Toronto
  5. Preliminary zoning reviews and information — City of Toronto
  6. New Architects Act (2020) — Ordre des architectes du Québec

Written by the LokalMatch editorial team. Last reviewed September 10, 2026.

Find designers by city

Ontario

Show 71 cities

Quebec

Show 74 cities

What affects the cost of permit drawing

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Type of professional and service needed
  • Size and complexity of the project
  • Level of detail in drawings or reports
  • Number of site visits and meetings
  • Number of design revisions
  • Help with permits or contractor selection

How to compare designers before you hire

  • Match the professional to the job: an architect or engineer where the work requires one, a designer for layout and finishes, or an inspector for a condition report.
  • Ask whether they are licensed or certified for this type of work in your province, where that applies.
  • Review a portfolio or sample report that's similar to your project.
  • Get a written agreement that spells out the services, deliverables, number of revisions and how fees are charged.
  • Ask whether their drawings will be suitable for a permit application, and whether they'll help with it.

Questions to ask designers before you hire

  • Are you licensed or certified for this type of work in my province?
  • What exactly will you deliver: drawings, specifications, a report or site visits?
  • How are your fees charged: a fixed fee, hourly or based on the project cost?
  • How many rounds of revisions are included?
  • Will your drawings be ready for a permit application, and will you submit it?
  • Can I see a sample of a similar project or report?
  • Do you carry professional liability insurance?

When to call a pro for permit drawing

  • Before removing or moving a wall that may be load-bearing
  • Before buying a home, to understand its condition
  • When a permit application needs drawings

Permit drawing permits and local rules

Some permit drawing work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Ready to get permit drawing quotes?

Tell us about your permit drawing project.

Do you offer permit drawing services?

Join LokalMatch to get matched with homeowners in the areas you serve.