Skip to content
LokalMatch

Event Production Companies

Event Production Companies near you

An event production company builds the event and runs it. Where a planner manages suppliers, budgets and guests, production is responsible for the physical and technical reality of the show: the stage and set, the structures that hold lighting and speakers, the crew who put it all up, the schedule that gets it built in time, and the person calling cues while it happens. On a conference this is the general session; on an outdoor event it is the stage, the roof and everything hanging from it.

Tell us what you need and we’ll help you find event production companies who serve your area.

Free for homeowners · No obligation to hire

On this page

The discipline is unregulated as a profession, but almost everything a production company does on site is governed by occupational health and safety law, and by more of it than most buyers expect. Ontario's Ministry of Labour, Immigration, Training and Skills Development publishes safety guidelines specifically for the live performance industry covering rigging and fall arrest, temporary performance and event structures, elevating work platforms, performer flying, pyrotechnics and working in the dark. Those guidelines are advisory and expressly do not replace the Occupational Health and Safety Act and its regulations, but they describe the standard of practice that competent companies work to.

The consequence for a buyer is that production is the supplier whose safety documentation you should actually read. A stage that collapses, a truss that falls or a crew member who falls from height is the category of risk that turns an event into a serious incident, and the companies that manage it well can show you how before you ask twice.

What event production companies supply

  • Staging and set: platforms, risers, scenic elements, backdrops and the structures that define the performance space.
  • Rigging: the trusses, motors, hardware and calculations that suspend lighting, sound, screens and scenery safely overhead.
  • Technical crew: riggers, stagehands, technicians, operators and the technical director who runs the site.
  • Show calling and stage management: cue sheets, timing and the person responsible for the programme running as rehearsed.
  • Production management: the build schedule, crew calls, equipment logistics, site plans and supplier coordination on site.
  • Outdoor infrastructure: stage roof systems, temporary structures, weather monitoring and the plans that govern them.
  • Special effects: pyrotechnics, flame effects, haze and confetti, each carrying its own safety and approval requirements.
  • Load-in and strike: the physical schedule of getting equipment into a venue, built, operated, dismantled and out again.

The production schedule: load-in, rehearsal, show and strike

Production runs on a schedule that reads backwards from doors. Load-in is the window in which trucks arrive, gear is brought into the room and the build happens in dependency order: rigging points and overhead work first, because nothing can be underneath while loads are being flown, then staging, then lighting and audio focus, then set dressing. Venues impose their own constraints on this, including dock access, curfew hours and which union or in-house crew must be used, and those constraints shape the cost far more than the equipment list does.

Rehearsal and technical checks follow the build, and they are the part most often compressed when the build runs late. A technical rehearsal exists to find the failures while there is still time to fix them, and cutting it converts a manageable problem into a visible one. Speakers and presenters should get time on the stage with the equipment they will actually use.

The show itself is run against cue sheets by a show caller working to the run sheet, with the technical director holding responsibility for the site. Strike is the reverse of load-in and is where fatigue-related incidents cluster, since it typically happens late at night after a long day. A production company that schedules strike realistically, rather than assuming a crew that has worked sixteen hours will dismantle a rig safely at two in the morning, is telling you something useful about how it operates.

Temporary structures, engineering sign-off and working at heights

Temporary stages and roof systems are engineered structures, not furniture. Ontario's live performance guidelines describe structures dedicated to housing the technical production of entertainment events, indoors or out, and state that such a structure should be designed in accordance with good engineering practice and approved by a professional engineer with relevant structural and live performance expertise, with a sign-off report from a professional engineer confirming it has been correctly constructed before use. Load documentation is expected to include drawings accompanied by a stamped engineering report detailing the load limits the structure is designed to bear, and signage identifying limits such as maximum occupancy or maximum wind velocity where applicable. Municipalities frequently add their own requirements for tents and temporary structures, so the local building department is a necessary call for outdoor events.

Working at heights is a training obligation with teeth. In Ontario, workers on construction projects who use fall protection such as travel restraint, fall restricting or fall arrest systems must complete a working at heights training program approved by the Chief Prevention Officer and delivered by an approved provider, under the Occupational Health and Safety Awareness Training regulation. That training is valid for three years, after which a refresher is required to keep it current. Several provinces have comparable mandatory requirements, so confirm the rule where the event takes place. Ask the production company how many of the crew attending your event hold current certification, not merely whether the company is aware of the requirement.

Rigging carries its own practice standards. The Ontario guidelines state a minimum strength-to-load ratio of eight to one for the elements of the rigging of a flown unit, require that materials be of appropriate size and strength for the load they bear with manufacturer recommendations followed, and call for inspection and examination by a competent person at least once a year of all parts and functions, more often for equipment in frequent use, recorded in a permanent maintenance log signed by the inspector. Elevating work platforms used to reach height require manufacturer-based operator training, documented pre-use inspections and fall protection attaching the worker to the platform.

Weather, wind and load limits at outdoor events

Outdoor production has one risk that dwarfs the others, and it is wind acting on a structure carrying banners, screens and roof canvas. Ontario's guidelines call for an Operations Management Plan defining the actions to be taken for different parts of the structure during and in anticipation of changing weather conditions, including real-time on-site wind speed monitoring and procedures for responding to severe weather warnings. That means a named person watching an anemometer with written thresholds and pre-agreed actions, not a general intention to keep an eye on the forecast.

The decisions have to be made before they are urgent. A plan should state at what measured wind speed banners come down, at what point the roof is lowered or the walls removed, at what point the show is paused, and who has authority to make each call without consulting anyone. It should also say how the audience is told, because an evacuation nobody has planned is considerably more dangerous than the weather.

Indoors, the equivalent issue is rigging points and load limits. Venues have finite structural capacity and it is not always documented in a way a production company can rely on. Ask early whether the venue can supply rigging drawings and point loads, because the answer determines whether the design you have been shown is actually buildable in that room. The guidelines also expect a competent person, such as a technical director or rigger, to supervise a temporary structure and monitor it during use.

Equipment inspection records and crew competence

  • Ask for the annual inspection records for rigging hardware, motors and slings, since a permanent signed maintenance log is the expected practice.
  • Ask how equipment damaged on a previous event is quarantined and removed from service rather than returned to the truck.
  • Confirm that elevating work platform operators hold manufacturer-based training and that daily pre-use inspections are documented.
  • Confirm which crew hold current working at heights certification and when it expires, given the three-year validity in Ontario.
  • Ask who the named competent person supervising the structure is, and whether they are on site for the whole build and show.
  • For effects, confirm the specific qualifications and approvals for pyrotechnics or flame effects rather than accepting a general assurance.
  • Ask for the site-specific safety documentation for your event, not a generic policy with another client's name still in the header.

Production company, venue in-house team or hiring crew directly

A venue's in-house production team knows the room, its rigging points and its quirks, and using them removes a layer of coordination. The limits show up when the show needs equipment or expertise the venue does not hold, or when you want the same look across events in several cities.

An external production company brings continuity and the ability to design a show that is not constrained by one building's inventory. The trade-off is that they must learn each venue, which makes the site visit and the venue's technical specifications essential rather than optional, and some venues require their own crew for certain work regardless.

Hiring crew and equipment directly to save a management layer tends to work only for simple events. As soon as anything is flown, built or climbed, someone has to hold overall responsibility for the site, the schedule and the safety documentation, and that role is what a production company is actually selling.

On LokalMatch, a business describes the event, the venue and its constraints, the audience size, what needs to be built and the programme it must support, and event production companies serving that city respond directly. LokalMatch does not assess technical competence or verify training records, so ask directly about engineering sign-off for structures, working at heights certification, rigging inspection logs and insurance before you appoint anyone.

Event Production Companies: frequently asked questions

Does a temporary stage need engineering approval?

Ontario's live performance safety guidelines state that a temporary performance or event structure should be designed in accordance with good engineering practice and approved by a professional engineer with relevant expertise, with a professional engineer's sign-off report confirming correct construction before use, and load documentation including a stamped engineering report detailing the load limits. Municipalities often add their own permit requirements for tents and temporary structures, so check locally as well.

Is working at heights training mandatory for event crew?

In Ontario, workers on construction projects who use fall protection such as travel restraint, fall restricting or fall arrest systems must complete a working at heights program approved by the Chief Prevention Officer and delivered by an approved provider, and that training is valid for three years before a refresher is required. Several provinces have comparable mandatory requirements. Ask which specific crew members attending your event hold current certification.

What should an outdoor event have in place for bad weather?

A written plan, monitored in real time. Ontario's guidelines call for an Operations Management Plan defining what happens to each part of the structure during and in anticipation of changing weather, including on-site wind speed monitoring and procedures for responding to severe weather warnings. In practice that means measured thresholds, pre-agreed actions such as dropping banners or lowering a roof, a named decision-maker and a plan for communicating with the audience.

Are the Ontario live performance safety guidelines legally binding?

No. The Ministry of Labour, Immigration, Training and Skills Development publishes them as advisory guidance, and they expressly do not replace the Occupational Health and Safety Act and its regulations, with inspectors bound to apply the law rather than the guidelines. They are still the clearest published description of expected practice for this industry, which makes them a reasonable benchmark when comparing suppliers.

How is a production company priced compared with a planner?

Differently, because it is selling different things. Production quotes are driven by equipment, crew hours and the build schedule, so venue constraints such as dock access, curfews, required in-house crew and available rigging points influence the figure as much as the design does. A planner's fee reflects management time across the whole event. Comparing the two directly is a category error, and on larger events you are usually buying both.

Sources

  1. Ontario: safety guidelines for the live performance industry
  2. Ontario live performance guidelines: temporary performance and event structures
  3. Ontario live performance guidelines: rigging systems and fall arrest
  4. Ontario live performance guidelines: elevating work platforms
  5. Ontario: working at heights training
  6. Guide to the Occupational Health and Safety Act: duties of employers and other persons (Ontario)

Written by the LokalMatch editorial team. Last reviewed September 14, 2026. How we write and check our guides

Find event production companies by city

Ontario

Show 71 cities

Quebec

Show 74 cities

What affects the fees event production companies charge

Fees depend on the work involved and how the professional bills. We only publish fee ranges when they’re backed by real LokalMatch data or reliable sources. Until then, here’s what usually changes the fee:

  • Scope and complexity of the work
  • How the firm bills: hourly, per project or on a monthly retainer
  • Experience of the team
  • Timeline and how urgent the work is
  • Ongoing support after the work is delivered

How to compare event production companies before you hire

  • Ask for examples of similar work for clients like you.
  • Read reviews and ask for references you can contact.
  • Make sure the scope, deliverables and timeline are written down before work starts.
  • Ask who will do the work: an in-house team, freelancers or subcontractors.
  • Compare two or three proposals before you decide.

Questions to ask event production companies before you hire

  • Have you done work like this before, and can I see examples?
  • Who will work on this, and who is my main contact?
  • How do you charge: hourly, per project or monthly?
  • What is included, and what costs extra?
  • How long is the contract, and how can either side end it?
  • How will you report on progress?
  • Who owns the work, files and accounts you set up for me?

Licences and registration

This kind of work is often limited to licensed or registered professionals, and the rules depend on where you are. Ask which body they’re registered with, and check their status on that body’s public register before you hire.

Related professional services

Ready to contact event production companies?

Tell us what you need in a few sentences.