Framing
Framing near you
Framing in British practice is not the North American platform-framing trade. It is carpentry first fix: the stud partitions that divide rooms, the sole plates and head plates they sit between, the noggins that will later carry a radiator or a wall-hung basin, the joists and trimmers around a new opening, and the timber frame panels that form the inner leaf of a great many houses built since the 1970s. The work is buried by the plasterer a fortnight later, which is exactly why it is worth getting right.
Tell us about your framing project and we’ll help you find local framers who serve your area.
Free for homeowners · No obligation to hire
On this page
Most of what decides the quality of a partition is invisible afterwards. Studs at a spacing that suits the board, a plate fixed into something that will actually hold, noggins where the fixings will be needed, and services run through the middle of studs rather than notched into the edge of them. Add anything that has to pass through a fire-resisting element, or any wall that carries load, and the job stops being a day's carpentry and starts involving building control.
Two parts of the building regulations reach into this work more than homeowners expect. Fire is one: a concealed space is a route for smoke and flame, and Approved Document B treats it accordingly. Sound is the other: a new partition between a bedroom and the rest of a dwelling has a stated laboratory benchmark, and a stud wall built without any thought for it will disappoint everyone in the house.
What first fix carpentry covers in a British house
- Non-load-bearing stud partitions: sole plate, head plate, vertical studs and horizontal noggins, usually in sawn softwood.
- Load-bearing internal walls, which carry floor or roof loads down to something solid and cannot be moved on a whim.
- Timber frame panels forming the structural inner leaf of a cavity wall, with a breather membrane and a separate masonry or clad outer skin.
- Floor structures: joists, trimmers, herringbone or solid strutting, and the double joists that sit under a new partition.
- Trimming openings for a new door, a loft hatch, a stairwell or a rooflight, which is structural work whatever its size.
- Roof carpentry: rafters, purlins, ceiling joists and the collar and binder arrangement in a traditional cut roof.
- Battening and grounds: the timbers that later carry boarding, cladding, a shower tray former or a run of wall units.
Structural timber, grading marks and the house longhorn beetle areas
Structural softwood arrives graded, and the grade stamp is the thing to look for rather than the look of the board. Approved Document A, in its 2004 edition with the 2013 amendments, points to the TRADA span tables for solid timber members in floors, ceilings and roofs of dwellings, with BS EN 1995-1-1 and its UK National Annex, PD 6693-1:2012 and BS 8103-3:2009 as the alternative design route. That is the reason a carpenter asks what the span is before quoting a joist size instead of reaching for whatever is on the rack.
Construction products placed on the market in Great Britain carry either a UKCA or a CE mark with a declaration of performance, and GOV.UK guidance confirms that CE marking continues to be recognised for construction products with no end date currently set. For graded timber that declaration is what backs up the strength class printed on the face of the piece.
One British quirk is worth knowing before ordering roof timber. Approved Document A requires softwood used in roof construction, or fixed in the roof space including ceiling joists in the void, to be adequately treated against the house longhorn beetle in a short list of places: the parishes of Sandhurst and Crowthorne in Bracknell Forest, the Borough of Elmbridge, the parishes of Hawley and Yateley in Hart, the District of Runnymede, the Boroughs of Spelthorne, Surrey Heath and Woking, and the former district of Farnborough within Rushmoor. Outside that belt the treatment is a choice; inside it, it is the guidance.
Sound through a new stud wall: requirement E2 and the 40 dB benchmark
Requirement E2 of Schedule 1 to the Building Regulations 2010 says that dwelling-houses, flats and rooms for residential purposes shall be designed and constructed so that internal walls between a bedroom or a room containing a water closet and other rooms, and internal floors, provide reasonable resistance to sound. Approved Document E, the 2003 edition as amended in 2004, 2010, 2013 and 2015, sets the benchmark in Table 0.2: new internal walls and floors within dwellings should achieve a laboratory value of at least 40 dB Rw for airborne sound insulation.
The limits on application matter as much as the figure. E2 does not apply to an internal wall which contains a door, nor to a wall separating an en suite toilet from its own bedroom, nor to existing walls and floors in a building undergoing a material change of use. Table 0.2 is written for new walls in new dwellings and in conversions, so a partition dropped into an existing house is often outside the requirement altogether. That is a reason to treat 40 dB Rw as the standard to aim at rather than a rule you can point to, and to ask your carpenter what the wall build-up actually is.
In practice the difference between a partition you can hear a conversation through and one you cannot comes down to mass, isolation and sealing: the weight and number of board layers, a mineral wool quilt in the void, and the gaps around sockets, at the head and at the skirting line. A hollow stud wall with a single layer of board each side and a socket back-to-back with the one next door is the version people complain about afterwards.
Cavity barriers and fire-stopping: what has to close a concealed space
Approved Document B volume 1, the 2019 edition as amended, treats any concealed space as a cavity, because fire spreading inside one spreads unseen. Cavity barriers are required both to divide cavities and to close their edges, and the document lists where: at the edges of cavities including around openings such as windows, doors and service entry points, and at the junction between a cavity wall and every compartment floor or compartment wall. It also warns that a line of compartment walls must not be completed by putting a cavity barrier above it; the wall itself is extended up to the underside of the floor or roof.
The performance asked of a cavity barrier is 30 minutes' integrity and 15 minutes' insulation, tested from each side separately. Within a stud wall or around an opening, the document accepts steel at least 0.5mm thick, timber at least 38mm thick, polythene-sleeved mineral wool or mineral wool slab under compression, or calcium silicate, cement-based or gypsum-based board at least 12mm thick, while noting that these do not necessarily reach the tested performance on their own. Barriers should be tightly fitted to a rigid construction and mechanically fixed, and where that cannot be done, as where a barrier meets tiles or corrugated sheeting, the junction is fire-stopped instead.
Fire-stopping is a separate discipline from cavity barriers and the document is explicit that the two should not be confused. It is what closes the gaps left where a pipe, cable or duct passes through a fire-resisting wall or floor, and it is the detail most often forgotten when a plumber or electrician follows the carpenter through a partition that was doing a job.
When a partition becomes building work, and how the four nations differ
Regulation 3 of the Building Regulations 2010 defines building work to include the erection or extension of a building and a material alteration, and a material alteration is work that would leave the building not complying, or more unsatisfactory, in relation to a defined set of requirements: Part A, paragraphs B1, B3, B4 and B5, Part M and, since October 2024, Part T. That list is why a stud wall in a bedroom is often not building work at all, while a partition that encloses a landing, blocks an escape window, forms an inner room or carries load is.
Where the work does bite, England and Wales use building regulations approval, applied for through a local authority building control team or a registered building control approver. Scotland is a different system: the Building (Scotland) Regulations 2004 work through a building warrant granted before the work and a completion certificate after it, with Schedule 3 listing the work that needs no warrant at all. Northern Ireland works to the Building Regulations (Northern Ireland) 2012, in which structure sits under Part D, fire safety under Part E and sound under Part G, so the letters you will be quoted do not match the English ones.
Two practical consequences follow. First, ask early rather than late: a wall that had to be fire-resisting is far cheaper to build correctly than to open up afterwards. Second, keep whatever certificate the system produces, because it is the document a buyer's solicitor asks for years later.
How a first fix job should run before the plasterer arrives
- Agree the setting out on site with a laser and a chalk line, since a partition drawn square on a plan rarely lands square in an older house.
- Check what is under the floor before the sole plate goes down: a partition landing between joists needs a double joist or noggins beneath it.
- Fix noggins for everything that will later be hung, listing radiators, basins, handrails, TV brackets and wall units before the wall is closed.
- Run services through drilled holes near the neutral axis of studs rather than notching the edges, and keep sockets off the back-to-back position.
- Fit any insulation quilt as the wall goes up, because stuffing it in through a gap afterwards leaves the voids that carry sound.
- Photograph every wall before boarding, with a tape in shot, so that anyone drilling into it in five years knows where the cables run.
- Book the building control inspection at the right stage if the work is notifiable, since some elements have to be seen before they are covered.
What drives a carpentry first fix quote, and how LokalMatch fits in
First fix is priced on complexity rather than on floor area, and the variables are fairly consistent: how many partitions and how tall, whether any of them carry load, whether the floor and ceiling they meet are level and square, how much service work has to be coordinated through them, whether fire resistance or sound insulation is specified, how far materials have to be carried, and whether the house is occupied while the dust is being made. A single straight partition in a new-build is a different quotation from the same wall in a Victorian house with a sloping floor and a chimney breast in the way.
Finding the carpenter is what LokalMatch does. Write the work down once, with your postcode, the number of walls and what each of them has to achieve, and carpenters serving that area reply to you directly. Homeowners are never charged for this; the trades pay for the requests they receive. LokalMatch does not carry out work, does not set prices, and does not vet, rank or recommend anyone, so checking insurance, references and what each quotation actually includes remains your decision.
Framing: frequently asked questions
Do I need building regulations approval to put up a stud wall?
Often not, but it depends on what the wall does. Regulation 3 of the Building Regulations 2010 makes a material alteration into building work where it would leave the building not complying, or more unsatisfactory, in relation to Part A, paragraphs B1, B3, B4 and B5, Part M and Part T. A partition that carries load, encloses a landing, creates an inner room or blocks an escape window engages that list. One that simply divides a large bedroom usually does not. Scotland asks the same question through the building warrant system instead.
How much sound insulation should a new internal wall give?
Approved Document E sets a laboratory value of at least 40 dB Rw for airborne sound insulation in new internal walls and floors within dwellings, in Table 0.2. Requirement E2 itself is aimed at walls between a bedroom or a WC and other rooms, and it does not apply to an internal wall containing a door, to a wall between an en suite and its bedroom, or to existing walls in a material change of use. Treat 40 dB as the target to specify rather than a rule that automatically applies to a partition in an existing house.
What is a cavity barrier and does my partition need one?
A cavity barrier closes or divides a concealed space so that fire and smoke cannot travel through it unseen. Approved Document B volume 1 requires them at the edges of cavities, around openings, and at junctions between cavity walls and compartment walls or floors, and asks for 30 minutes' integrity and 15 minutes' insulation. In a stud wall they may be formed from steel at least 0.5mm thick, timber at least 38mm thick, compressed mineral wool, or board at least 12mm thick. Whether your partition needs one depends on whether it meets a fire-resisting element.
Is treated timber needed for roof carpentry?
In most of the country it is a specification choice. In a defined area it is guidance: Approved Document A requires softwood used in roof construction or fixed in the roof space, including ceiling joists in the void, to be adequately treated against the house longhorn beetle in Elmbridge, Runnymede, Spelthorne, Surrey Heath and Woking, in Sandhurst and Crowthorne within Bracknell Forest, in Hawley and Yateley within Hart, and in the former Farnborough district of Rushmoor.
Can a carpenter tell me whether a wall is load-bearing?
An experienced carpenter can usually tell you what a wall looks like, by checking the direction of the joists above, what sits over it on the floor above and how it is built at the base. That is an opinion, not a design. Removing or opening up anything that carries load is structural work where the load has to be taken safely to the ground, which means a structural engineer's calculations and building control involvement, and it is worth arranging that before the first stud comes out.
Is timber frame construction the same as a stud partition?
No. A stud partition divides space inside a building. A timber frame is the structural inner leaf of the external wall, built as panels with a breather membrane, a cavity and a separate outer skin of masonry or cladding, and it carries the floors and roof. Work on a timber frame wall is structural, involves the weather line and the fire and moisture detailing of the external envelope, and should not be treated as ordinary carpentry.
Sources
- The Building Regulations 2010, regulation 3 (meaning of building work and material alteration)
- Approved Document E: resistance to the passage of sound (requirement E2; Table 0.2, 40 dB Rw)
- Approved Document B volume 1: dwellings (cavity barriers, E 30 / I 15, paragraphs 5.16 to 5.23)
- Approved Document A: structure (timber sizing, TRADA span tables; house longhorn beetle areas, Table 1)
- GOV.UK: construction products regulation in Great Britain (UKCA and CE marking)
- The Building (Scotland) Regulations 2004, Schedule 3 (work not requiring a warrant)
- The Building Regulations (Northern Ireland) 2012 (Parts D, E and G)
Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides
Find framers by city
England
Show 173 citiesHide cities
- Framing in Birmingham
- Framing in Bournemouth
- Framing in Bradford
- Framing in Brighton and Hove
- Framing in Bristol
- Framing in Cambridge
- Framing in Coventry
- Framing in Derby
- Framing in Exeter
- Framing in Ipswich
- Framing in Kingston upon Hull
- Framing in Leeds
- Framing in Leicester
- Framing in Liverpool
- Framing in London
- Framing in Luton
- Framing in Manchester
- Framing in Middlesbrough
- Framing in Milton Keynes
- Framing in Newcastle upon Tyne
- Framing in Northampton
- Framing in Norwich
- Framing in Nottingham
- Framing in Oxford
- Framing in Peterborough
- Framing in Plymouth
- Framing in Portsmouth
- Framing in Reading
- Framing in Sheffield
- Framing in Southampton
- Framing in Southend-on-Sea
- Framing in Stoke-on-Trent
- Framing in Sunderland
- Framing in Swindon
- Framing in Wolverhampton
- Framing in York
- Framing in Ashford
- Framing in Aylesbury
- Framing in Banbury
- Framing in Barnsley
- Framing in Barrow-in-Furness
- Framing in Basildon
- Framing in Basingstoke
- Framing in Bath
- Framing in Bebington
- Framing in Bedford
- Framing in Beeston
- Framing in Birkenhead
- Framing in Blackburn
- Framing in Blackpool
- Framing in Bloxwich
- Framing in Bognor Regis
- Framing in Bolton
- Framing in Bootle
- Framing in Bracknell
- Framing in Brentwood
- Framing in Burnley
- Framing in Burton upon Trent
- Framing in Bury
- Framing in Cannock
- Framing in Canterbury
- Framing in Carlisle
- Framing in Chatham
- Framing in Chelmsford
- Framing in Cheltenham
- Framing in Chester
- Framing in Chesterfield
- Framing in Clacton-on-Sea
- Framing in Colchester
- Framing in Corby
- Framing in Crawley
- Framing in Crewe
- Framing in Crosby
- Framing in Darlington
- Framing in Dartford
- Framing in Dewsbury
- Framing in Doncaster
- Framing in Dudley
- Framing in Durham
- Framing in Eastbourne
- Framing in Ellesmere Port
- Framing in Farnborough
- Framing in Folkestone
- Framing in Gateshead
- Framing in Gillingham
- Framing in Gloucester
- Framing in Gosport
- Framing in Gravesend
- Framing in Grimsby
- Framing in Guildford
- Framing in Halesowen
- Framing in Halifax
- Framing in Harlow
- Framing in Harrogate
- Framing in Hartlepool
- Framing in Hastings
- Framing in Hemel Hempstead
- Framing in Hereford
- Framing in High Wycombe
- Framing in Hinckley
- Framing in Horsham
- Framing in Huddersfield
- Framing in Huyton with Roby
- Framing in Kettering
- Framing in Kidderminster
- Framing in Kingswinford
- Framing in Kingswood and Fishponds
- Framing in Lancaster
- Framing in Lincoln
- Framing in Loughborough
- Framing in Lowestoft
- Framing in Macclesfield
- Framing in Maidenhead
- Framing in Maidstone
- Framing in Mansfield
- Framing in Margate
- Framing in Newcastle-under-Lyme
- Framing in Nuneaton
- Framing in Oldham
- Framing in Paignton
- Framing in Poole
- Framing in Preston
- Framing in Redditch
- Framing in Rochdale
- Framing in Rochester
- Framing in Rotherham
- Framing in Royal Leamington Spa
- Framing in Royal Sutton Coldfield
- Framing in Royal Tunbridge Wells
- Framing in Rugby
- Framing in Runcorn
- Framing in Sale
- Framing in Salford
- Framing in Scarborough
- Framing in Scunthorpe
- Framing in Shrewsbury
- Framing in Sittingbourne
- Framing in Slough
- Framing in Smethwick
- Framing in Solihull
- Framing in South Shields
- Framing in Southport
- Framing in St Albans
- Framing in St Helens
- Framing in Stafford
- Framing in Stevenage
- Framing in Stockport
- Framing in Stockton-on-Tees
- Framing in Stourbridge
- Framing in Tamworth
- Framing in Taunton
- Framing in Telford
- Framing in Torquay
- Framing in Tynemouth
- Framing in Wakefield
- Framing in Wallasey
- Framing in Walsall
- Framing in Warrington
- Framing in Washington
- Framing in Watford
- Framing in Wellingborough
- Framing in Welwyn Garden City
- Framing in West Bromwich
- Framing in Weston-super-Mare
- Framing in Weymouth
- Framing in Widnes
- Framing in Wigan
- Framing in Woking
- Framing in Wokingham
- Framing in Worcester
- Framing in Worthing
- Framing in Wythenshawe
- Framing in Yeovil
Northern Ireland
Show 7 citiesHide cities
Scotland
Show 10 citiesHide cities
Wales
Show 5 citiesHide cities
What affects the cost of framing
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size and complexity of the piece or structure
- Wood species or material
- Custom design compared with standard sizes
- Hardware, railings and finishing
- Removal of what's there now
- Permits and drawings, where needed
How to compare framers before you hire
- Choose a carpenter whose past work matches your project, whether that's framing, trim, built-ins, stairs or a deck.
- Ask for drawings or a clear description of what will be built, including materials and finishes.
- For decks, stairs and railings, ask whether a permit is needed, since these are safety items.
- Get a written quote that says who supplies materials and whether finishing, such as painting or staining, is included.
- Ask how they'll handle surprises like rot or uneven walls and floors.
Questions to ask framers before you hire
- Can you show me photos of similar work you've done?
- What materials will you use, and why?
- Does this project need a permit, and will you get it?
- Is finishing, such as sanding, painting or staining, included?
- How will you attach the work to the existing structure?
- What warranty do you offer on your workmanship?
Framing permits and local rules
Some framing work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingGuides about framing
- ✦
Carpenters guide
Carpenters and joiners handle most of the timber in a British home. The trade is usually described in two stages.
Read guide - ✦
Trim & Moulding guide
Trim is the joinery that finishes a room rather than holds it up: architrave round the doors, a window board under the cill, dado and picture rails, panel moulding on a wall, plinth blocks, and the beads and stops that…
Read guide - ✦
Coving guide
Crown moulding is the American name for what a British decorator calls coving or, in its more elaborate forms, cornice.
Read guide
Ready to get framing quotes?
Tell us about your framing project.
Do you offer framing services?
Join LokalMatch to get matched with homeowners in the areas you serve.