The board that your circuits run from is a consumer unit in Britain, and the older ones are still called the fuse board or the fuse box. Replacing it means taking the whole enclosure off the wall, transferring every circuit into a new one, testing each of them and certifying the result. It is not a part swap, and it is the one domestic electrical job that the Building Regulations name in their own words.
Tell us about your panel replacement project and we’ll help you find local electricians who serve your area.
Free for homeowners · No obligation to hire
On this page
Most replacements are prompted by a document rather than a bang. A condition report comes back with observations on it, a sale or a new tenancy puts the installation under scrutiny, or a new load arrives in the house: an electric shower, a charge point, a heat pump. Occasionally the trigger is age alone, where the board has rewireable fuses, no earth leakage protection and no spare ways left.
This guide is about the decision and the paperwork rather than the hardware. What tells you a replacement is genuinely the right answer, what the electrician has to assess before a new board can be energised, what the classification codes on an inspection report mean, and what you should be holding at the end. If your interest is what actually sits inside a modern board, the companion consumer unit upgrade guide on this site covers that ground.
Board change, remedial work or a rewire: three different jobs that get quoted together
These three get mixed up constantly, and the difference decides both the disruption and the sequence. A board change replaces the enclosure and the protective devices, and assumes the circuits behind it are sound enough to reconnect. Remedial work puts right specific faults found on specific circuits, and may or may not need the board touched at all. A rewire replaces the cabling itself, room by room, and the board change is simply the last part of it.
A new board on old cabling is not automatically wrong. Plenty of installations have decades of service left in the wiring and an enclosure that has run out of future. What is wrong is a board change quoted as though the circuits behind it have already passed their tests. Ask any electrician quoting for a replacement what happens if a circuit fails when it is tested on the day, because the honest answer, an isolated circuit, a written explanation and a separate price, is also the answer that tells you the quote was not built on optimism.
Sequence matters where money is tight. If the cabling is the problem, a new board buys you protection but not a solution, and it will be paid for twice when the rewire follows. If the enclosure is the problem, remedial work on individual circuits leaves the actual defect on the wall.
- Board change: new enclosure, new protective devices, existing circuits tested and transferred.
- Remedial work: named defects on named circuits, usually written up against a condition report.
- Partial rewire: one area replaced, commonly a kitchen, a bathroom or a lighting circuit in an older property.
- Full rewire: new cabling throughout, with the board change forming part of the work.
- Supply upgrade: a separate job involving your network operator or supplier, not the electrician alone.
- Additions: a shower, a charge point or an outbuilding supply, which may need spare ways before anything else can happen.
What C1, C2, C3 and FI on an Electrical Installation Condition Report mean
An Electrical Installation Condition Report, usually shortened to EICR, is the document that most often puts a consumer unit replacement on the table, and its classification codes are worth understanding before anyone quotes against it. Government guidance for the rented sector sets them out plainly. C1 means danger present, with a risk of injury. C2 means potentially dangerous. C3 means improvement recommended, and does not require remedial work. FI means further investigation is required without delay.
The practical consequence is that a C3 is information rather than an instruction. An older board with no residual current protection frequently attracts observations that sit at C3, which means the report is telling you the installation is not built to today's standard, not that it is unsafe today. C1 and C2 are different: they describe a condition to be put right, and they are the codes that make a report unsatisfactory.
In the rented sector in England the codes carry deadlines. The regulations require installations to be inspected and tested at least every five years by a qualified person, and where the report requires remedial or further investigative work, it must be carried out within 28 days, or any shorter period specified in the report. Government guidance now covers both the private and the social rented sectors, with the social housing requirements having come into force on 1 November 2025 and transitional provision for existing tenancies until 1 May 2026. Scotland, Wales and Northern Ireland run their own rented-sector electrical safety duties, so check the rule for the nation the property sits in.
Earthing and bonding: the assessment that happens before the new board goes on
A consumer unit replacement is an alteration to an existing installation, and BS 7671 does not let an alteration be made in isolation. The IET points to regulation 132.16, which requires an assessment of the existing installation, including the distributor's equipment and the earthing and bonding arrangements, to determine whether they are adequate for the altered circumstances. That is why a good electrician spends time at the incoming supply before they price the board, and why a quote given from a photograph of the front cover is a guess.
The two things being assessed are not the same thing, although they are constantly confused. As the IET puts it, earthing connects exposed-conductive-parts to the main earthing terminal to provide a path for fault current, while protective bonding connects extraneous-conductive-parts to the main earthing terminal to prevent a potential difference that would create a hazardous touch voltage. They do different jobs, and a board change is the moment both get checked properly.
Bonding is also where the modern house surprises people. The IET notes the common misconception that all water pipes require protective bonding: where the incoming water service pipe is plastic and there is no fortuitous contact with earth, it is not an extraneous-conductive-part and does not require bonding. So the answer to whether your house needs a bonding conductor to the water main depends on what the pipe under your floor is made of, which is exactly the sort of thing that has to be looked at rather than assumed. The type of earthing arrangement the network operator has given you matters too, and the operator declares the figures the electrician designs to.
On LokalMatch the route to a quote is deliberately plain. You describe the board you have, what prompted the question and your postcode, once, and electricians covering your area contact you. Pros pay for the enquiries they receive. LokalMatch does not carry out work, does not set prices, and does not vet, rank or recommend the businesses that reply.
Arc fault detection devices: the option you will increasingly be offered
If a quote includes a line you have never heard of, it is likely to be this one. The IET describes arc fault detection devices, or AFDDs, as protective devices installed in consumer units to provide protection from arc faults, using microprocessor technology to analyse the waveform and cut power to the circuit when it sees a signature that indicates arcing. They address a failure mode that neither a circuit breaker nor an earth leakage device is designed to catch: a loose terminal or a damaged cable arcing quietly behind a wall.
The status is worth stating precisely, because it is often oversold. The IET says that in the current edition of the IET Wiring Regulations, BS 7671:2018, it is a recommendation to install AFDDs and the customer can choose to omit them, weighing the relevant risk and safety factors against the cost. The recommendation is aimed at particular situations rather than every dwelling.
- Premises with sleeping accommodation, which the IET lists as including houses, hotels and hostels.
- Locations with a fire risk from the materials stored or processed there.
- Buildings whose construction materials are combustible.
- Fire propagating structures, such as thatched or timber-framed buildings, where the IET says the whole installation should be protected rather than individual circuits.
- Locations holding irreplaceable goods, such as museums and listed buildings.
- Anywhere you have chosen to accept the cost for the risk reduction, since the decision is explicitly left with the customer.
Notification in England: the exact words, and the three ways to satisfy them
Approved Document P reproduces the notification rule directly from regulation 12(6A) of the Building Regulations, and it is short enough to quote. Notice must be given where the work consists of the installation of a new circuit, the replacement of a consumer unit, or any addition or alteration to existing circuits in a special location. A consumer unit replacement is therefore not a marginal case or a matter of interpretation. It is named.
There are three procedures for getting notifiable work signed off in England. The installer can be registered with a competent person scheme and self-certify, which is by far the most common route and the reason most homeowners never speak to building control at all. Alternatively the work can be notified to a building control body before it starts, or certified by a registered third-party certifier. Government publishes which schemes are authorised, so an installer's claim to be registered is checkable rather than a matter of trust.
Elsewhere in the UK the machinery differs and the vocabulary changes with it. Welsh Government publishes its own guidance on building regulations and electrical work. In Scotland, work is authorised through a building warrant granted by the local authority as verifier, with a completion certificate at the end and technical handbooks in place of approved documents. In Northern Ireland the Department of Finance makes the building regulations and district councils enforce them. Approved Document P itself is for use in England, so do not quote its paragraph numbers at a Scottish verifier.
The documents you should be holding when the power comes back on
A consumer unit replacement produces paperwork, and the paperwork is most of what you have bought. It is also what a buyer's solicitor, a letting agent or an insurer will ask for later, so treat it as part of the job rather than an afterthought, and chase it if it does not arrive.
- An Electrical Installation Certificate for the work, signed by the person responsible for the design, construction and inspection and testing.
- A schedule of circuits, so every device in the new board is identified against the circuit it protects.
- A schedule of test results, which is the evidence each transferred circuit was actually tested rather than reconnected.
- Confirmation that the work has been notified, which for a scheme-registered installer means a certificate issued through their scheme.
- A written note of anything left isolated, unfinished or recommended, so no defect leaves the property undocumented.
- The date by which the installation should next be inspected, which the certificate itself will state.
Burning smells, warmth and repeated tripping before the replacement happens
A board that is warm to the touch, discoloured around a device, buzzing steadily or giving off a smell of hot plastic is not a job to schedule for next month. Switch off at the main switch if it is safe to reach, stop using the circuit involved, and get an electrician to look at it. Do not remove the cover, and do not replace a device yourself to see whether that fixes it.
Repeated tripping is a different signal and deserves better than a repeatedly reset switch. A device that trips is doing its job, and the useful information is the pattern: which device, which appliances were running, whether it happens in wet weather, whether it started after other work in the house. Write that down before the visit, because it shortens the diagnosis considerably. A device that will not reset at all, or one that does not trip when its test button is pressed, is a fault to report rather than a quirk to live with.
Consumer Unit Replacement: frequently asked questions
My inspection report says C3. Do I have to replace the consumer unit?
No. Government guidance for rented homes defines C3 as improvement recommended, and states that it does not require remedial work. C1 means danger present with a risk of injury, C2 means potentially dangerous, and FI means further investigation is required without delay. An older board frequently attracts C3 observations simply because it is not built to the current standard. That is worth knowing and worth planning around, but it is not the same finding as a C1 or a C2.
Is replacing a consumer unit notifiable, or is that only for new circuits?
It is named in its own right. Approved Document P sets out regulation 12(6A), under which notice must be given where the work consists of the installation of a new circuit, the replacement of a consumer unit, or any addition or alteration to existing circuits in a special location. In England the usual route is an installer registered with a competent person scheme who self-certifies the work. Scotland uses a building warrant instead, and Northern Ireland works through district council building control.
Why does the electrician want to check my water and gas pipes?
Because BS 7671 does not allow an alteration to be designed in isolation. The IET points to regulation 132.16, which requires an assessment of the existing installation, including the distributor's equipment and the earthing and bonding arrangements, to decide whether they are adequate for the altered circumstances. Protective bonding connects extraneous-conductive-parts to the main earthing terminal so that a hazardous touch voltage cannot appear. Note the IET's caveat that not every water pipe needs it: a plastic incoming service pipe with no fortuitous contact with earth is not an extraneous-conductive-part.
Should I pay extra for arc fault detection devices?
It is a judgement the standard leaves with you. The IET states that under BS 7671:2018 installing AFDDs is a recommendation and the customer can choose to omit them, weighing risk and safety factors against cost. The situations the IET lists include premises with sleeping accommodation, buildings of combustible construction, fire propagating structures such as thatched or timber-framed buildings, and locations holding irreplaceable goods. Ask the electrician to explain which of those, if any, describes your house.
I rent out a property. How often do the electrics have to be checked?
In England the requirement is an inspection and test at least every five years by a qualified person, with the report given to tenants. Where the report requires remedial or further investigative work, it must be done within 28 days or any shorter period the report specifies. The guidance now covers the social rented sector as well as the private one, with the social housing requirements in force from 1 November 2025 and transitional provision for existing tenancies until 1 May 2026. Scotland, Wales and Northern Ireland have their own rented-sector duties.
Can the electrician work on the meter or the incoming fuse?
That equipment is not part of your installation. BS 7671's assessment duty refers to the distributor's equipment specifically because it belongs to the network operator or the supplier rather than to you or your electrician. If the job needs the supply isolating at the cut-out, or the meter moving, that is arranged with the relevant company and it has its own lead time. Ask about it when the quote is prepared, not on the morning of the work.
Do I need a rewire at the same time?
Not necessarily, and the tests are what answer it rather than the age of the house. A board change assumes the circuits behind it will pass their tests and can be reconnected. Where they do not, the circuit should be left isolated and written up rather than reconnected anyway. If several circuits fail, the conversation changes from a board change to a rewire, and it is better to have that conversation from test results than from a first impression of the cabling.
Sources
- GOV.UK: Approved Document P, electrical safety in dwellings, 2013 edition (PDF)
- GOV.UK: Approved Document P publication page
- GOV.UK: Electrical safety standards in the private and social rented sectors, guidance
- GOV.UK: Competent person schemes, current schemes and how schemes are authorised
- IET: Arc fault detection devices, consumer guidance
- IET: BS 7671 FAQs, earthing and bonding
- GOV.WALES: Building regulations and electrics
- Scottish Government: Building standards, warrants and completion certificates
- Department of Finance: Building Regulations in Northern Ireland
Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides
Find electricians by city
England
Show 173 citiesHide cities
- Consumer Unit Replacement in Birmingham
- Consumer Unit Replacement in Bournemouth
- Consumer Unit Replacement in Bradford
- Consumer Unit Replacement in Brighton and Hove
- Consumer Unit Replacement in Bristol
- Consumer Unit Replacement in Cambridge
- Consumer Unit Replacement in Coventry
- Consumer Unit Replacement in Derby
- Consumer Unit Replacement in Exeter
- Consumer Unit Replacement in Ipswich
- Consumer Unit Replacement in Kingston upon Hull
- Consumer Unit Replacement in Leeds
- Consumer Unit Replacement in Leicester
- Consumer Unit Replacement in Liverpool
- Consumer Unit Replacement in London
- Consumer Unit Replacement in Luton
- Consumer Unit Replacement in Manchester
- Consumer Unit Replacement in Middlesbrough
- Consumer Unit Replacement in Milton Keynes
- Consumer Unit Replacement in Newcastle upon Tyne
- Consumer Unit Replacement in Northampton
- Consumer Unit Replacement in Norwich
- Consumer Unit Replacement in Nottingham
- Consumer Unit Replacement in Oxford
- Consumer Unit Replacement in Peterborough
- Consumer Unit Replacement in Plymouth
- Consumer Unit Replacement in Portsmouth
- Consumer Unit Replacement in Reading
- Consumer Unit Replacement in Sheffield
- Consumer Unit Replacement in Southampton
- Consumer Unit Replacement in Southend-on-Sea
- Consumer Unit Replacement in Stoke-on-Trent
- Consumer Unit Replacement in Sunderland
- Consumer Unit Replacement in Swindon
- Consumer Unit Replacement in Wolverhampton
- Consumer Unit Replacement in York
- Consumer Unit Replacement in Ashford
- Consumer Unit Replacement in Aylesbury
- Consumer Unit Replacement in Banbury
- Consumer Unit Replacement in Barnsley
- Consumer Unit Replacement in Barrow-in-Furness
- Consumer Unit Replacement in Basildon
- Consumer Unit Replacement in Basingstoke
- Consumer Unit Replacement in Bath
- Consumer Unit Replacement in Bebington
- Consumer Unit Replacement in Bedford
- Consumer Unit Replacement in Beeston
- Consumer Unit Replacement in Birkenhead
- Consumer Unit Replacement in Blackburn
- Consumer Unit Replacement in Blackpool
- Consumer Unit Replacement in Bloxwich
- Consumer Unit Replacement in Bognor Regis
- Consumer Unit Replacement in Bolton
- Consumer Unit Replacement in Bootle
- Consumer Unit Replacement in Bracknell
- Consumer Unit Replacement in Brentwood
- Consumer Unit Replacement in Burnley
- Consumer Unit Replacement in Burton upon Trent
- Consumer Unit Replacement in Bury
- Consumer Unit Replacement in Cannock
- Consumer Unit Replacement in Canterbury
- Consumer Unit Replacement in Carlisle
- Consumer Unit Replacement in Chatham
- Consumer Unit Replacement in Chelmsford
- Consumer Unit Replacement in Cheltenham
- Consumer Unit Replacement in Chester
- Consumer Unit Replacement in Chesterfield
- Consumer Unit Replacement in Clacton-on-Sea
- Consumer Unit Replacement in Colchester
- Consumer Unit Replacement in Corby
- Consumer Unit Replacement in Crawley
- Consumer Unit Replacement in Crewe
- Consumer Unit Replacement in Crosby
- Consumer Unit Replacement in Darlington
- Consumer Unit Replacement in Dartford
- Consumer Unit Replacement in Dewsbury
- Consumer Unit Replacement in Doncaster
- Consumer Unit Replacement in Dudley
- Consumer Unit Replacement in Durham
- Consumer Unit Replacement in Eastbourne
- Consumer Unit Replacement in Ellesmere Port
- Consumer Unit Replacement in Farnborough
- Consumer Unit Replacement in Folkestone
- Consumer Unit Replacement in Gateshead
- Consumer Unit Replacement in Gillingham
- Consumer Unit Replacement in Gloucester
- Consumer Unit Replacement in Gosport
- Consumer Unit Replacement in Gravesend
- Consumer Unit Replacement in Grimsby
- Consumer Unit Replacement in Guildford
- Consumer Unit Replacement in Halesowen
- Consumer Unit Replacement in Halifax
- Consumer Unit Replacement in Harlow
- Consumer Unit Replacement in Harrogate
- Consumer Unit Replacement in Hartlepool
- Consumer Unit Replacement in Hastings
- Consumer Unit Replacement in Hemel Hempstead
- Consumer Unit Replacement in Hereford
- Consumer Unit Replacement in High Wycombe
- Consumer Unit Replacement in Hinckley
- Consumer Unit Replacement in Horsham
- Consumer Unit Replacement in Huddersfield
- Consumer Unit Replacement in Huyton with Roby
- Consumer Unit Replacement in Kettering
- Consumer Unit Replacement in Kidderminster
- Consumer Unit Replacement in Kingswinford
- Consumer Unit Replacement in Kingswood and Fishponds
- Consumer Unit Replacement in Lancaster
- Consumer Unit Replacement in Lincoln
- Consumer Unit Replacement in Loughborough
- Consumer Unit Replacement in Lowestoft
- Consumer Unit Replacement in Macclesfield
- Consumer Unit Replacement in Maidenhead
- Consumer Unit Replacement in Maidstone
- Consumer Unit Replacement in Mansfield
- Consumer Unit Replacement in Margate
- Consumer Unit Replacement in Newcastle-under-Lyme
- Consumer Unit Replacement in Nuneaton
- Consumer Unit Replacement in Oldham
- Consumer Unit Replacement in Paignton
- Consumer Unit Replacement in Poole
- Consumer Unit Replacement in Preston
- Consumer Unit Replacement in Redditch
- Consumer Unit Replacement in Rochdale
- Consumer Unit Replacement in Rochester
- Consumer Unit Replacement in Rotherham
- Consumer Unit Replacement in Royal Leamington Spa
- Consumer Unit Replacement in Royal Sutton Coldfield
- Consumer Unit Replacement in Royal Tunbridge Wells
- Consumer Unit Replacement in Rugby
- Consumer Unit Replacement in Runcorn
- Consumer Unit Replacement in Sale
- Consumer Unit Replacement in Salford
- Consumer Unit Replacement in Scarborough
- Consumer Unit Replacement in Scunthorpe
- Consumer Unit Replacement in Shrewsbury
- Consumer Unit Replacement in Sittingbourne
- Consumer Unit Replacement in Slough
- Consumer Unit Replacement in Smethwick
- Consumer Unit Replacement in Solihull
- Consumer Unit Replacement in South Shields
- Consumer Unit Replacement in Southport
- Consumer Unit Replacement in St Albans
- Consumer Unit Replacement in St Helens
- Consumer Unit Replacement in Stafford
- Consumer Unit Replacement in Stevenage
- Consumer Unit Replacement in Stockport
- Consumer Unit Replacement in Stockton-on-Tees
- Consumer Unit Replacement in Stourbridge
- Consumer Unit Replacement in Tamworth
- Consumer Unit Replacement in Taunton
- Consumer Unit Replacement in Telford
- Consumer Unit Replacement in Torquay
- Consumer Unit Replacement in Tynemouth
- Consumer Unit Replacement in Wakefield
- Consumer Unit Replacement in Wallasey
- Consumer Unit Replacement in Walsall
- Consumer Unit Replacement in Warrington
- Consumer Unit Replacement in Washington
- Consumer Unit Replacement in Watford
- Consumer Unit Replacement in Wellingborough
- Consumer Unit Replacement in Welwyn Garden City
- Consumer Unit Replacement in West Bromwich
- Consumer Unit Replacement in Weston-super-Mare
- Consumer Unit Replacement in Weymouth
- Consumer Unit Replacement in Widnes
- Consumer Unit Replacement in Wigan
- Consumer Unit Replacement in Woking
- Consumer Unit Replacement in Wokingham
- Consumer Unit Replacement in Worcester
- Consumer Unit Replacement in Worthing
- Consumer Unit Replacement in Wythenshawe
- Consumer Unit Replacement in Yeovil
Northern Ireland
Show 7 citiesHide cities
Scotland
Show 10 citiesHide cities
- Consumer Unit Replacement in Aberdeen
- Consumer Unit Replacement in Dundee
- Consumer Unit Replacement in Edinburgh
- Consumer Unit Replacement in Glasgow
- Consumer Unit Replacement in Cumbernauld
- Consumer Unit Replacement in Dunfermline
- Consumer Unit Replacement in East Kilbride
- Consumer Unit Replacement in Hamilton
- Consumer Unit Replacement in Livingston
- Consumer Unit Replacement in Paisley
What affects the cost of panel replacement
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Type and amount of work, from a single fixture to a full rewire
- Condition and age of the existing wiring
- Panel and service capacity
- Distance from the panel to the new circuit
- Access through finished walls and ceilings
- Permits and inspections
How to compare electricians before you hire
- Hire a licensed electrician or electrical contractor for any wiring, panel or new circuit work.
- Ask whether the work needs a permit and inspection, and make sure the electrician arranges it.
- Get a written quote that lists fixtures, materials, patching of walls and ceilings, and permit costs.
- For panel upgrades and EV chargers, ask them to check whether your electrical service can handle the added load.
- Choose someone who explains what they found in plain language before starting.
Questions to ask electricians before you hire
- Are you licensed for electrical work in my area?
- Will you get the permit and arrange the inspection?
- Can my current panel and service handle this work?
- Will you need to open walls or ceilings, and who patches them afterwards?
- Is the price fixed, or could it change once you see the existing wiring?
- What warranty do you offer on your work?
When to call a pro for panel replacement
- Burning smells, scorch marks or warm outlets and switches: turn off the circuit at the panel if it's safe to do so and call an electrician.
- Breakers that trip again and again
- Flickering or dimming lights that aren't fixed by changing the bulb
- Any sparking, buzzing or exposed wiring
Panel replacement permits and local rules
Some panel replacement work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingGuides about panel replacement
- ✦
Electricians guide
Electrical work in UK homes is governed by a technical standard and by building regulations rather than by licences.
Read guide - ✦
Emergency Electricians guide
An electrical emergency in a British home usually announces itself in one of three ways: something smells hot, something has gone dark, or something has tripped and will not stay on.
Read guide - ✦
Electrical Repairs guide
Electrical repair is the everyday half of the trade: a dead socket, a light that has stopped working, a switch that crackles, a shower that has gone cold, an extractor fan that hums without turning, a circuit that trips…
Read guide
Ready to get panel replacement quotes?
Tell us about your panel replacement project.
Do you offer panel replacement services?
Join LokalMatch to get matched with homeowners in the areas you serve.