Skip to content
LokalMatch

Bathroom Renovations

Bathroom Renovations near you

British bathrooms are small rooms with a great deal going on in them. A typical job is a family bathroom over timber joists in a terrace or semi, an en suite carved out of the corner of a bedroom, or a WC squeezed under the stairs on the ground floor. The finishes are the visible part, but the reason bathrooms need more care than their size suggests is that three separate parts of the Building Regulations meet in the same few square metres.

Tell us about your bathroom renovation project and we’ll help you find local bathroom renovation contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

Part P governs electrical safety, and the spaces around a bath or shower are the special locations where ordinary alterations become notifiable work. Part F covers the extract ventilation that keeps condensation and mould out of a room that is deliberately filled with steam. Part H covers the drainage that takes the waste away, which is what makes moving a WC the most consequential decision on the plan. Add a floor structure that was never designed for a freestanding bath full of water, and a bathroom becomes a technical job rather than a decorating one.

Planning permission, by contrast, seldom comes into it. It applies where the bathroom forms part of an extension, where the property is listed, and where it is a flat or maisonette without householder permitted development rights.

Planning permission for a bathroom or en suite: the three cases that matter

Installing a bathroom inside the existing house is not usually something your council needs to approve. The Planning Portal states that a planning application for installing a kitchen or bathroom is generally not required unless it forms part of a house extension, and adding an en suite within an existing bedroom sits comfortably inside that.

Three situations change the answer. If the bathroom is part of an extension, the extension is what gets tested against the permitted development limits — and note that the permitted development rules for extensions specifically exclude a soil and vent pipe from the work that is covered, so a new external soil stack on an extension needs checking rather than assuming. If the property is listed, consult the local planning authority first, since consent is needed for work affecting its special architectural or historic interest and proceeding without it is a criminal offence. If the property is a flat or maisonette, the householder permitted development rights that apply to houses do not apply at all.

When a bathroom needs building regulations approval

The dividing line is whether the room was a bathroom before. Refitting an existing bathroom with new units and fittings does not generally require building regulations approval, though the drainage and electrical work that forms part of the refit may. Putting a bathroom into a room that did not have one — the classic en suite taken out of a bedroom, or a shower room made from a box room — is likely to require approval, so that the new room has adequate ventilation and drainage and meets requirements for structural stability, electrical safety and fire safety.

GOV.UK is more direct still in its list of work needing building regulations approval, which includes installing a bathroom that will involve plumbing and changing electrics near a bath or shower. In other words, most real bathroom projects touch building control somewhere, even when the room itself is not new.

You can use your local authority's building control service or a private registered building control approver; the choice is yours. Make sure the job is signed off and you receive the completion certificate, because GOV.UK warns that without approval you will not have the certificates of compliance you may need when you sell the property, and an unsigned-off en suite is a familiar problem in conveyancing.

Bathroom electrics: zones, special locations and Part P notification

A bathroom is the one room in an English house where Part P treats even modest electrical alterations as notifiable. Approved Document P makes the installation of a new circuit or the replacement of a consumer unit notifiable anywhere, and adds alterations to existing circuits when they are in a special location — and in England, special locations are the spaces around baths and showers. Adding a spur or moving a light in a bedroom is generally not notifiable; doing the equivalent next to a bath is.

That changes who should do the work and what you should receive afterwards. The simplest route is an electrician registered with a government-authorised competent person scheme such as NICEIC or NAPIT, who can self-certify that the work complies with the Building Regulations. Otherwise the work has to be notified to a building control body or certified by a registered third party. Approved Document P expects installations to follow BS 7671 and expects the householder to be given electrical installation certificates describing the work carried out.

  • An electric shower needs its own high-current circuit from the consumer unit, which is notifiable work and often forces a consumer unit upgrade.
  • Shower pumps, extractor fans, underfloor heating mats, shaver sockets and downlights are all electrical work inside or next to the special location.
  • Replacing the consumer unit is notifiable in its own right, whatever else the bathroom job involves.
  • Approved Document P points to Part M for the height of switches and socket outlets in new dwellings, which is worth knowing if the bathroom is part of a new build or conversion.
  • Ask for the certificate at handover rather than months later, because it is the document that proves the notifiable work was certified.

Extract ventilation, condensation and mould in a British bathroom

Any new bathroom, shower room or toilet should be provided with a means of extract ventilation to reduce condensation and remove smells, with the requirements set out in Approved Document F, which covers the ventilation needed to maintain indoor air quality in dwellings. Where the room is being refurbished rather than created, the expectation is that existing extract ventilation is retained or replaced — so if the old fan comes out during the strip-out, something has to go back.

The practical stakes are highest in internal bathrooms and en suites with no openable window, where the fan is the only route moisture has out of the room. A fan that discharges to the outside, ideally with an overrun timer so it keeps running after the shower stops, is what stops steam migrating into the rest of the house and condensing on cold surfaces. In older solid-walled homes, recurring black mould in a bathroom corner is usually a ventilation problem wearing a cleaning problem's clothes, and no amount of repainting fixes it.

Drainage and Part H: why moving the WC is the expensive decision

Approved Document H covers drainage and waste disposal, including foul water drainage above and below ground, pipe sizes, the protection of pipes, and manholes and inspection chambers. In a bathroom that translates into a short list of hard constraints: the WC needs a large-bore connection to the soil stack, it needs to run at a fall the pipe can actually achieve, and the length of run and number of bends are limited by what will clear reliably.

This is why a bathroom layout is not a blank sheet. Swapping a bath for a shower in the same position is straightforward; moving the WC to the opposite wall may mean lifting the floor, re-routing the soil pipe within the joist depth you have, and in some cases running a new connection to the stack outside. Where gravity drainage genuinely cannot be achieved — a WC below the drain level, or a shower room in an awkward corner — a pumped or macerating arrangement is the alternative, and it should be a considered decision rather than a default, because it brings its own maintenance and failure modes.

New external pipework is also where drainage meets planning: the permitted development rules for extensions expressly exclude a soil and vent pipe from the work they cover, so a new external stack on an extension is not something to assume is allowed.

Floors and waterproofing: what has to be right before the tiles go on

The Planning Portal makes a point that catches people out: if the use of a room changes in a way that significantly changes the load on the floor structure, work to strengthen the floor may be necessary. Its own example is a bathroom — installing a new bathroom suite in a room with a floor of timber joists and boards carries a significant risk of the floor being overloaded by the bath once it is full of water and in use. A structural engineer or surveyor can assess whether strengthening is needed before anything is ordered.

That matters more now than it used to, because the fittings have got heavier. A cast iron or stone freestanding bath, a large-format tiled floor, a walk-in shower with a stone resin tray and a solid screen all add weight to joists sized decades ago for a small steel bath against a wall. Deflection is also what cracks grout and breaks tile bonds, so a floor that moves is a finish that fails.

Waterproofing is the other thing that has to be right before the visible work starts. Tiles and grout are not a waterproof layer; the tanking behind them is, particularly in a walk-in shower where water hits the wall directly. A contractor who can explain what goes behind the tile, and how the tray, the wall and the floor junction are sealed to each other, is describing the part of the job you will never see and will most regret if it is skipped.

Guarantees, certificates and your rights when a bathroom goes wrong

Bathroom failures tend to surface slowly — a stain on a ceiling below, grout that keeps coming away, a fan that never cleared the steam — so knowing what you are covered by before that happens is worth a few minutes. Under the Consumer Rights Act 2015 the work must be performed with reasonable care and skill, and anything the trader told you that you relied on in deciding to go ahead becomes a term of the contract. If the service does not conform, you can require repeat performance at the trader's cost or a price reduction, and these rights cannot be excluded.

On top of that sits whatever the business itself offers. TrustMark registered businesses are expected to provide a minimum two-year guarantee, supported by insurance covering workmanship, rectification of defects and non-compliance with the Building Regulations should the business cease trading, with the Dispute Resolution Ombudsman available when a complaint cannot be resolved with the business or its scheme provider.

LokalMatch sits at the start of this process, not inside it. You describe the bathroom once — the room, whether the layout and drainage are changing, your postcode and your timing — and matched bathroom fitters and builders get in touch with you; the professionals pay for the requests they receive. LokalMatch does not carry out the work, does not set prices, and does not vet, rank or recommend any business, so checking scheme registration, insurance and the written scope is yours to do.

Bathroom Renovations: frequently asked questions

Do I need building regulations approval for a new en suite?

Probably yes. Providing a bathroom in a room that did not have one before is likely to require building regulations approval, so that the room has adequate ventilation and drainage and meets requirements for structural stability, electrical safety and fire safety. GOV.UK also lists installing a bathroom that involves plumbing, and changing electrics near a bath or shower, among the work needing approval. Refitting an existing bathroom is treated differently, though its drainage and electrical elements may still need approval.

Do I need planning permission to redo a bathroom?

Usually not. A planning application for installing a bathroom is generally not required unless it forms part of a house extension. The exceptions are listed buildings, where you should consult the local planning authority because consent covers work affecting the building's special interest and going ahead without it is a criminal offence, and flats and maisonettes, which have no householder permitted development rights. New external pipework also needs checking, since permitted development for extensions excludes a soil and vent pipe.

Who can do the electrical work in a bathroom?

In England, the spaces around baths and showers are special locations, which means altering an existing circuit there is notifiable work even though the same alteration elsewhere would not be. Installing a new circuit or replacing the consumer unit is notifiable anywhere. The simplest route is an electrician registered with a competent person scheme such as NICEIC or NAPIT who can self-certify; otherwise the work must be notified to building control or certified by a registered third party.

Can I move the toilet to the other side of the bathroom?

Sometimes, but it is the decision with the largest knock-on effects. Approved Document H governs foul drainage, pipe sizes and the protection of pipes, and a WC needs a large-bore connection running at a workable fall to the soil stack. Within the depth of a typical timber floor there is a limit to how far the pipe can travel and how many bends it can take. Where gravity drainage cannot be achieved, a pumped or macerating arrangement is the alternative, with its own maintenance implications.

Does a bathroom have to have an extractor fan?

A new bathroom, shower room or toilet should have a means of extract ventilation to reduce condensation and remove smells, with the detail in Approved Document F. On a refurbishment, any existing extract ventilation should be retained or replaced. For an internal bathroom or en suite with no openable window, the fan is the only way moisture leaves the room, so a fan discharging to the outside with an overrun timer is the practical minimum rather than an upgrade.

Will my floor take a freestanding bath?

It needs checking rather than assuming. The Planning Portal warns that where a change of use significantly changes the load on a floor structure, strengthening may be necessary, and gives the specific example of a new bathroom suite on timber joists risking overload from the bath once it is full and in use. A structural engineer or surveyor can assess the joists before you order anything. Excess deflection is also what cracks grout and breaks tile bonds.

Does any of this differ in Scotland or Northern Ireland?

Yes. The Approved Documents referred to here are the English ones. In Scotland you may need a building warrant from your council before work begins, and starting work that requires one without it is an offence; a completion certificate is submitted to the council afterwards. Northern Ireland works to the Building Regulations (Northern Ireland) 2012, administered by district councils' building control through submitted plans or a building notice. Check locally rather than applying English guidance.

Sources

  1. Planning Portal: Is building regulations approval needed for work to a kitchen or bathroom?
  2. Planning Portal: Kitchens and bathrooms — suitability of existing floor structures
  3. GOV.UK: Building regulations approval — when you need it
  4. GOV.UK: Electrical safety — Approved Document P
  5. GOV.UK: Ventilation — Approved Document F
  6. GOV.UK: Drainage and waste disposal — Approved Document H
  7. Planning Portal: Extensions and permitted development
  8. TrustMark: Consumer protection and the minimum guarantee
  9. Consumer Rights Act 2015, Part 1 Chapter 4 (services)
  10. mygov.scot: Getting a building warrant

Written by the LokalMatch editorial team. Last reviewed 14 September 2026. How we write and check our guides

Find bathroom renovation contractors by city

England

Show 173 cities

What affects the cost of bathroom renovation

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size of the bathroom and whether the layout changes
  • Moving the toilet, shower or drains
  • Tile, fixtures and vanity chosen
  • Walk-in shower, tub or both
  • Water damage or rot found during demolition
  • Ventilation and electrical upgrades

How to compare bathroom renovation contractors before you hire

  • Choose a contractor who can explain how they'll waterproof the shower or tub area, not only what tile they'll use.
  • Ask to see bathrooms they've finished, ideally some that have been in use for a while.
  • Make sure plumbing and electrical work will be done by licensed trades.
  • Get a written quote that lists fixtures, tile, ventilation and who supplies each item.
  • Ask how long the bathroom will be out of use, especially if it's the only one.

Questions to ask bathroom renovation contractors before you hire

  • How will you waterproof the shower, tub and floor?
  • Will you replace or upgrade the exhaust fan so moisture is vented outside?
  • Who supplies the fixtures and tile, and what happens if something is back-ordered?
  • Will plumbing need to move, and does the work need a permit?
  • What will you do if you find rot or mould behind the walls?
  • What warranty do you offer on your workmanship?

When to call a pro for bathroom renovation

  • Soft or spongy floors around the toilet or tub
  • Loose tiles or cracked grout in the shower
  • Mould that keeps coming back or musty smells, which should be assessed by a qualified professional

Bathroom renovation permits and local rules

Some bathroom renovation work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get bathroom renovation quotes?

Tell us about your bathroom renovation project.

Do you offer bathroom renovation services?

Join LokalMatch to get matched with homeowners in the areas you serve.