Skip to content
LokalMatch

Commercial-to-Residential Conversions

Commercial-to-Residential Conversions near you

Convert a commercial space into a home or residential units. Tell us about your conversion project and we’ll help you find local general contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

Commercial-to-residential conversions turn space built for business into homes: a main-street storefront becoming an apartment, a small office building divided into units, the upper floors of a mixed-use block converted to housing, or a former church or workshop turned into lofts. Reusing an existing structure can create homes where the zoning and the building allow it, often in walkable areas close to shops and transit.

These are among the most regulated renovations a property owner can take on. The use of the building changes, so zoning has to permit it; the building code treats the result as a residential occupancy with stricter fire, exit and sound requirements; and a site with a commercial or industrial past may need an environmental assessment. Most conversions need an architect, engineers or both, and a building permit even when little is built.

This page covers the kinds of conversion, zoning and change-of-use approvals, environmental site condition, the code upgrades a dwelling requires and the professionals involved. For adding a unit to an existing house or plex, see our apartment renovations page.

Types of commercial-to-residential conversions: storefronts, offices, upper floors and former institutional buildings

  • A ground-floor storefront converted into a home or apartment, often in an older main-street building that already has apartments upstairs.
  • A whole small commercial building, such as an office, clinic or former bank branch, turned into one house or several units.
  • The upper floors of a mixed-use building converted to apartments while the ground floor stays commercial, keeping the building mixed use.
  • Former churches, schools or workshops, whose open volumes suit lofts but whose past uses call for environmental and heritage checks.
  • A live-work unit, where a residence and a small business share the space, which zoning bylaws may treat differently from a purely residential conversion.

Zoning, rezoning and change-of-use permits for converting commercial space to residential

Before any design work, confirm that residential use is allowed on the property. Ontario's citizen's guide to land use planning explains that a zoning bylaw states exactly how land may be used and which types of buildings are permitted and how they may be used, so a commercial zone may not allow dwellings at all. If it doesn't, the route is usually a rezoning: an application to council, at least one public meeting with notice given at least 20 days in advance, and a possible appeal to the Ontario Land Tribunal if council refuses or doesn't decide within 90 days of a complete application. A proposal that follows the general intent of the bylaw but doesn't conform exactly may qualify for a minor variance instead.

Zoning approval doesn't replace the building permit. Toronto's permit guidance says a change of a building's use requires a building permit even if no construction is proposed, and that work must comply with the zoning bylaw even where no permit is needed. In Quebec, uses and permits are governed by each municipality's urban planning bylaws, so the planning department is the first call there too.

Environmental site condition and hazardous materials in former commercial buildings

Commercial properties can carry contamination a house never would. Ontario requires a record of site condition before a property changes to a more sensitive use, citing houses on an old factory or dry-cleaning site as examples. It rests on a phase one environmental site assessment, which identifies potentially contaminating activities, and where needed a phase two, which measures contaminants and then either reduces them or sets property-specific standards through a risk assessment; the qualified person must be a licensed professional engineer or a qualifying professional geoscientist. A final decision posted on October 23, 2025 expanded an exemption for converting existing commercial or community buildings to mixed use with residential units above the ground floor and an otherwise unchanged envelope, but not for properties historically used for industry, a garage, a bulk liquid dispensing facility or dry-cleaning equipment.

  • Older buildings may contain asbestos in plaster, floor and ceiling tiles, roofing and pipe insulation, and Health Canada recommends professional testing before renovating.
  • Treat old paint as possibly lead-based until tested, since Health Canada warns that sanding or heat-stripping it creates toxic dust and fumes.
  • Fuel tanks, grease interceptors and floor drains left from the former business need to be located and properly decommissioned by qualified trades.

Commercial vs residential building code requirements: fire separations, exits, sound and light

The building code classifies buildings by occupancy, and a dwelling is held to different standards than a shop or office. A space designed for people who are awake, few in number and familiar with the exits has to be reworked for people who sleep there, so the question is no longer whether the building met the code as a store, but whether it meets the requirements for residential occupancy now. Your architect or designer and the municipal plans examiner work through the changes; these are the usual ones.

  • Fire separations between each dwelling unit and any remaining commercial space, corridors and service rooms, with rated doors and sealed penetrations.
  • Safe exits from every unit, which in a multi-unit building can mean protected stairs and corridors, plus bedroom windows that open.
  • Smoke alarms, a fire alarm system and, depending on the building's size, sprinklers or other upgraded fire protection.
  • Sound separation between units, and between homes and a business below, with walls and floors built to reduce airborne and impact noise.
  • Natural light and ventilation for bedrooms and living areas, which deep commercial floor plates and fixed storefront glazing rarely provide.
  • New plumbing stacks, drains and venting for the kitchen and bathrooms of each unit, often cut through existing slabs.
  • Envelope upgrades, since commercial walls and large glazed storefronts are seldom insulated to what a home needs.

Architects, engineers and the steps of a commercial-to-residential conversion

Conversions often require professionals by law. In Ontario, the Architects Act exempts only certain small buildings from needing an architect, such as a building of up to three storeys used for residential occupancy that contains one dwelling unit, and designers working independently must be qualified and registered with the province. In Quebec, the Ordre des architectes du Québec explains that small buildings of up to four dwelling units are exempt only under limits that include a total gross floor area under 300 square metres. A multi-unit conversion beyond those thresholds needs an architect's sealed drawings.

Engineers are part of most conversions. A structural engineer checks floors, new openings and added loads such as rooftop equipment or new stairs, and mechanical and electrical engineers design separate heating, ventilation, plumbing and electrical services for each dwelling, which a building laid out for one commercial tenant rarely has.

  • Confirm zoning, heritage status and environmental requirements before buying the property or committing to a design.
  • Commission a feasibility study that tests unit count, exits, windows and parking against the zoning bylaw and the building code.
  • Have the existing structure, envelope, services and hazardous materials surveyed before drawings are finalized.
  • Apply for the change-of-use building permit with the architect's and engineers' drawings, then build through the inspections to final occupancy.

Commercial-to-Residential Conversions: frequently asked questions

Can I convert a commercial building into a house?

Only if zoning allows residential use on the property, or you obtain a rezoning or variance, and the building can be brought up to the building code for residential occupancy. Start with the municipal planning department, then a feasibility study by an architect or qualified designer.

Do I need a permit to live in a former store if I don't renovate?

In many municipalities, yes. Toronto, for example, requires a building permit for a change of use even when no construction is proposed, because a home has to meet residential requirements for fire safety, exits and ventilation.

Do I need an architect to convert commercial space into apartments?

Often. In Ontario and Quebec, only certain small buildings are exempt from needing an architect, and a multi-unit conversion frequently exceeds those limits. Structural, mechanical and electrical engineers are usually needed as well.

What is a record of site condition?

In Ontario, it's a filing required before a property changes to a more sensitive use, such as residential, based on environmental site assessments by a qualified person. Some conversions of existing commercial buildings to mixed use are exempt, but not sites with a history of industrial use, a garage, bulk liquid dispensing or dry cleaning.

Is converting commercial space cheaper than building new?

Sometimes, but not reliably. The structure and shell are reused, but upgrades for fire separation, exits, sound, plumbing and the envelope, plus any environmental work, can be extensive. A feasibility study and early pricing from a contractor show which applies to your building.

Sources

  1. Government of Ontario: Citizen's guide to land use planning, Zoning bylaws
  2. City of Toronto: When do I need a building permit?
  3. Government of Ontario: Brownfields redevelopment (records of site condition)
  4. Environmental Registry of Ontario: Record of site condition exemption for conversions to mixed use (decision 019-9310)
  5. Architects Act, R.S.O. 1990, c. A.26 — Government of Ontario
  6. Government of Ontario: Become a registered building practitioner
  7. Ordre des architectes du Québec: New Architects Act (2020)
  8. Health Canada: Asbestos and your health
  9. Health Canada: Lead-based paint

Written by the LokalMatch editorial team. Last reviewed September 10, 2026.

Find general contractors by city

British Columbia

Show 31 cities

Ontario

Show 71 cities

Quebec

Show 74 cities

What affects the cost of conversion

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size and scope of the project
  • Structural changes, such as moving or removing walls
  • Plumbing, electrical and HVAC work involved
  • Finishes and materials chosen
  • Design, drawings and permits
  • Condition of the existing house once it's opened up
  • Access to the site and the timeline

How to compare general contractors before you hire

  • Look for a contractor who has finished projects similar in size and type to yours, and ask to see them.
  • Get a written contract with the scope, the payment schedule, the timeline and how changes will be priced.
  • Ask who will manage the job day to day and how often you'll get updates.
  • Check that they carry liability insurance and workers' compensation coverage, and that their trades are licensed where required.
  • Compare quotes on the same scope, and ask what each one leaves out.
  • For structural changes, make sure an engineer or designer is involved where needed.

Questions to ask general contractors before you hire

  • Who will pull the permits, and who will be there for inspections?
  • Which parts of the job will you do yourselves, and which will go to subcontractors?
  • How do you handle change orders and unexpected problems once walls are open?
  • What is the payment schedule, and what is each payment tied to?
  • Can you show me proof of liability insurance and workers' compensation coverage?
  • What warranty do you offer on your workmanship, and is it in writing?
  • Can I speak with a few of your recent clients?

Conversion permits and local rules

Some conversion work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Ready to get conversion quotes?

Tell us about your conversion project.

Do you offer conversion services?

Join LokalMatch to get matched with homeowners in the areas you serve.