On this page
Why there’s no price range yet
We only show price ranges when they’re backed by real LokalMatch quote data or reliable, cited sources. Until then, here’s what usually changes the price — and the quickest way to a real number is to compare quotes.
What affects the price
- How much of the quote is preparation: washing, scraping, sanding, filling, caulking and spot priming
- The number of coats, and whether a primer coat is being counted as one of them
- Going pale over dark, or painting over patches, which can take a third coat to even the sheen
- Lead paint in a house built before 1990, which rules out sanders, heat guns and blowlamps as prep
- Asbestos in siding, plaster or ceiling tiles, which scraping and sanding are exactly what disturbs
- Height and access: ladders, staging or a lift, and what is planted under the wall
- Siding material and condition — chalking paint, bare wood, failed caulking, stucco, brick
- Rotten trim, soft sills and loose boards found during scraping, which is carpentry, not painting
- How many doors, windows and runs of trim there are, since trim is where the hours go
- Brushing and rolling against spraying, and the masking that spraying makes necessary
- Whether the paint is named by brand, line and sheen on the quote, or left as premium
- Who moves and covers furniture, and who removes switch plates and curtain hardware
- Ceilings and closets, which crews often price separately and homeowners assume are included
- The season, and the temperature and cure range printed on the can for outside work
- Whether the house is occupied, which decides how much gets masked and unmasked every day
Two quotes, one house, and the week that separates them
A painter who is washing the walls, scraping the failed patches back to a sound edge, filling, caulking the joints and spot-priming the bare spots is selling you a week. A painter who is putting two coats over whatever is there is selling you two days. Both quotes will say "two coats".
The difference does not show on the day the scaffold comes down. It shows in the third summer, when the paint lifts along exactly the seams it lifted along last time. Ask for the preparation listed as tasks — washed, scraped, sanded, filled, caulked, primed — and ask how much of the quoted time goes to it before a colour is opened.
Coats are a number, so get the number
Two coats over a similar colour is the normal job inside and out. Going pale over dark, or painting over a wall that has been patched, means a primer coat first and sometimes a third finish coat to even out the sheen. That is not an upsell, it is arithmetic about how much a film can hide.
Choose the colours before the quote if you can. A painter pricing an off-white and a painter pricing a deep blue-green on stucco are pricing two different jobs, and the second one finds out on site.
Before 1990, the prep method is a health decision
Health Canada is plain about the timeline. A home built before 1960 probably contains lead-based paint. Built between 1960 and 1990, the exterior may contain it. Houses built after 1990 should not, because consumer paints made in Canada and the United States were virtually lead-free by then. On method it is equally plain: do not use sanders, heat guns or blowlamps to remove paint in older homes, because that creates dust and fumes containing lead.
So on an older house the real question is not what goes on, it is what comes off and how. A crew that arrives at a 1950s bungalow with a disc sander and nothing on the ground is proposing the one thing Health Canada names — in the garden, where the dust stays.
Asbestos belongs in the same conversation. Health Canada's list of where it may still be found in a home includes house siding, cement and plaster, and floor and ceiling tiles, and it names the activities that release fibres: drilling, sawing, sanding, scraping, removing, breaking apart. It also says there is no significant risk while the material is left undisturbed and tightly bound in products in good condition. Painting is the trade that turns the second sentence into the first one. Scraping chalky asbestos-cement siding is the disturbance.
What is in the can now is not what was in it
Federal regulation sets volatile organic compound limits for 53 categories of architectural coating, running from 100 to 800 grams per litre, and it binds manufacturers, importers and sellers. The consequence for your house is that the solvent-heavy oil enamel that used to flow itself flat on a handrail is not what comes off the shelf. Painters use waterborne products in its place. They skin over faster, they are less forgiving of a slow brush hand, and they want a light sand between coats to lie down properly.
It is worth knowing because it changes what "the same as last time" means. A house last painted in the early nineties was painted with materials that are no longer sold.
Outside, the calendar is the constraint
Every can carries a temperature range for application and cure, and on a Canadian exterior that leaves a stretch of the year rather than a season. Inside that window the weather still has rules: dew on siding at seven in the morning is water under the first coat, full sun on a south wall skins the film before it can flow, and rain inside the cure time can leave streaks that have to be washed off before the second coat.
That is why exterior crews book out and why a March phone call gets a June date. It is also why the last house of the season is the one painted in a hurry.
Inside is a different job on the same invoice
Interior work is priced by what has to be cut in, not by floor area. Count the doors, the window casings, the baseboard runs and the stairwell — that is where the hours are. A bedroom with one door and no ceiling change is the fastest thing in the house.
Settle these before anyone arrives: who moves and covers the furniture, who takes off the switch plates and the curtain hardware, whether ceilings are in the price, whether closets are in the price, and where filling stops and wall repair starts.
Get it on paper, and make it name the paint
Ontario's rules are the clearest in the country and the posture travels: a home renovation contract worth more than 50 dollars has to be in writing, the final price cannot come in more than 10 per cent over a contract estimate unless you have agreed in writing to new work or a new price, a down payment is recommended to stay at no more than 10 per cent, and a contract signed in your home carries a 10 calendar-day cooling-off period you can use for any reason.
Add one painting line to that. "Premium paint" is not a specification. The quote should name the brand, the product line and the sheen for walls, for trim and for ceilings, because otherwise two quotes cannot be compared at all.
Job Bank puts painters and decorators in Canada between 20.00 and 40.99 CAD an hour with a median of 28.00, updated 19 November 2025. That is the wage the painter earns. The rate you are quoted also carries the ladders or the lift, insurance for working at height, the drop sheets, and the morning they come back to fix the two spots you found once the furniture went home.
Frequently asked questions
Why are two painting quotes for the same house so far apart?
Preparation and coats, nearly always. Washing, scraping, filling and caulking are the hours in a paint job and none of them are visible at the end. Ask for the prep written out as tasks, ask how many coats, and ask which product by name.
My house is from the 1950s. Does that change the job?
It changes the preparation. Health Canada says a home built before 1960 probably contains lead-based paint, and that sanders, heat guns and blowlamps should not be used to remove paint in older homes. Ask a painter how they plan to take the old coating off before you ask what they will put on.
Can the outside be painted in the fall?
Up to a point. The can gives a temperature range for application and cure, and late in the season the cold nights and the morning dew eat into the working day from both ends. A coat rushed on in October is the one that lifts first.
How many coats should I be paying for?
Two over a similar colour. Primer plus two when the colour is changing substantially, when the surface has been patched, or when bare wood is showing. Get the number in the contract along with what happens, and who pays, if a third is needed.
Is it worth painting the inside myself?
Walls, often. Ceilings, trim and stairwells are where an amateur loses the weekend, because cutting in is a skill and there is no shortcut to it. If the house predates 1990, the sanding and scraping part is not a beginner's job at all.
Sources
Where the facts on this page come from.
Reduce your exposure to lead — Health Canada (accessed September 25, 2026)
Asbestos and your health — Health Canada (accessed September 21, 2026)
Volatile organic compound concentration limits for architectural coatings regulations — Environment and Climate Change Canada (accessed September 25, 2026)
Your rights when starting home renovations or repairs — Government of Ontario (accessed September 21, 2026)
Painter and decorator in Canada — wages — Job Bank, Government of Canada (accessed September 25, 2026)
Who wrote and reviewed this
Written by
LokalMatch EditorialReviewed by
LokalMatch Editorial
Our guides are written and checked by people, and updated when things change. Read our editorial policy
