Patios near you

A patio is the one piece of hard landscaping most British households actually use, and the planning position for a ground level one is generous. The Planning Portal states that elsewhere around your house, meaning away from the front garden, there are no restrictions on the area of land which you can cover with hard surfaces at, or near, ground level. A terrace across the back of the house is therefore not limited by any square metre figure.

Tell us about your patio project and we’ll help you find local patio contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

The freedom disappears as soon as the patio comes up off the ground. The Planning Portal treats decking and other raised platforms together, and permitted development applies only where the decking is no more than 30 centimetres above the ground, where the decking or platforms together with other extensions and outbuildings cover no more than 50 per cent of the garden area, and where none of it is on land forward of a wall forming the principal elevation. Within the curtilage of a listed building, no decking or platform is permitted at all. The same page warns separately that significant works of embanking or terracing to support a hard surface might need a planning application, which is what a raised terrace on a sloping garden usually involves.

Then there is the boundary. A patio dug in beside a neighbour's wall can engage the Party Wall etc. Act 1996 in England and Wales, and that is a notice regime with its own timetable.

Ground level patios, raised patios and the 30 centimetre line

Start by working out which of the two regimes your patio sits in, because they are very different. A surface laid at or near ground level behind the house has no area restriction under the Planning Portal's guidance. Lift that surface, and it becomes a raised platform, and the permitted development conditions for decking and other raised platforms apply instead: no more than 30 centimetres above the ground, no more than 50 per cent of the garden area covered when counted together with other extensions and outbuildings, and nothing on land forward of a wall forming the principal elevation.

The designated area rules tighten this further. In National Parks, the Broads, Areas of Outstanding Natural Beauty and World Heritage Sites, the maximum area to be covered more than 20 metres from the house is limited to 10 square metres. On Article 2(3) designated land no decking or platform is permitted either side of the house. Within the curtilage of a listed building, no decking or platform is permitted. The Planning Portal also notes that where decking forms part of a larger piece of work, such as an extension with additional decking, different or further rules may apply to the whole development and permission or prior approval may be required.

The underlying legislation explains why 30 centimetres is the number. In the General Permitted Development Order for England, raised in relation to a platform means a platform with a height greater than 0.3 metres, and the household permitted development classes exclude development that would consist of or include the construction or provision of a verandah, balcony or raised platform. So the height is not a guideline that a considerate design can stretch; it is the point at which the permitted development right stops existing. Measure from the existing ground level rather than from the top of new fill, and remember that a listed building needs listed building consent for any significant works, whether internal or external.

A patio against the boundary: the Party Wall etc. Act 1996 in England and Wales

Patios run into party wall law more often than people expect, because levelling a terrace usually means digging, and digging near a neighbour's structure is one of the things the Act controls. GOV.UK's guidance confirms the Act applies to England and Wales and covers a new building on or at the boundary of two properties, work to an existing party wall or party structure, and excavation near to and below the foundation level of neighbouring buildings.

The explanatory booklet gives the two excavation triggers precisely. Notice is required if you plan to excavate, or excavate for and construct foundations for a new building or structure, within 3 metres of any part of a neighbouring owner's building or structure where any part of that work will go deeper than the neighbour's foundations. It is also required where the excavation is within 6 metres of any part of a neighbouring owner's building or structure and any part of the work will meet a line drawn downwards at 45 degrees in the direction of the excavation from the bottom of the neighbour's foundations. A patio dug down beside a neighbour's garage, extension or boundary wall can meet either test.

The timetable matters as much as the trigger. The booklet records that section 1, concerning works on the line of junction, requires a notice period of one month; section 2, concerning works to a party wall, requires two months notice; and section 6, concerning excavating near to the adjoining owner's property, requires one month's notice. If an adjoining owner does not respond in writing within 14 days to a notice about an existing structure or an excavation, a dispute is deemed to have arisen and the Act's surveyor procedure follows. It is also worth knowing what the Act does not catch: a party fence wall is a wall that is not part of a building, stands astride the boundary line between lands of different owners and is used to separate those lands, with a masonry garden wall as the example, and it does not include a timber fence. Finally, the booklet is explicit that the Act is separate from planning and building regulations control, so agreement under it removes neither.

Patio surfaces used in British gardens

  • Natural stone flags, commonly Indian sandstone or limestone: the default British patio for two decades, warm in appearance but porous, so it takes moss and algae in shaded gardens.
  • Porcelain paving: dense, low porosity and dimensionally consistent, which makes it far more resistant to staining and green growth, though it needs the correct primer and bedding and is unforgiving of a poorly prepared base.
  • Riven and sawn concrete flags: the economical option, available in finishes that imitate stone, and entirely dependent on the laying course for how flat the finished terrace looks.
  • Block paving and setts: small units that cope well with slight ground movement because the movement is shared across many joints, and easy to lift and relay in a single area.
  • York stone and reclaimed flags: traditional on older and listed properties, often the finish a conservation officer expects, and variable in thickness so it takes longer to lay well.
  • Timber and composite decking: the raised option, which brings the 30 centimetre permitted development limit with it and needs a ventilated, well drained structure underneath in this climate.
  • Gravel and resin bound surfaces: used for informal sitting areas and the transition between terrace and garden, free draining but harder to keep furniture stable on.

How a patio should be built: base, falls and the line of the damp proof course

A patio is a small piece of civil engineering with furniture on top. The sequence is excavation to a depth suited to the ground, a compacted sub base laid and consolidated in layers, a bedding or laying course appropriate to the paving being used, then the units themselves laid to a deliberate fall, with the joints filled in a way that suits the material. Full bedding matters more than most homeowners realise: flags laid on five dabs of mortar rather than a full bed will rock, ring hollow and eventually crack, and the fault cannot be corrected without lifting them.

The falls are the part to settle in writing. A terrace should shed water away from the house, not towards it, and the finished surface should sit clear of the damp proof course so that rain splashing off the paving cannot bridge into the wall. Where a patio has to meet a threshold at a similar level, the answer is normally a drainage channel along the house rather than a flat terrace, and that channel has to discharge somewhere real. Ask where. A patio that drains into a border which then waterlogs, or onto a neighbour's land, has simply moved the problem.

Where the ground falls away, the difference between a patio and a structure becomes important. Building up the levels to get a flat terrace is the embanking or terracing that the Planning Portal warns might need a planning application, and it also means whatever holds that fill back is now retaining ground and needs designing as such. If your patio scheme involves more than a step or two of level change, treat the retaining element as a separate engineered item with its own drainage rather than as an edging detail.

Why British patios go wrong: ponding, slip and movement

Water sitting on the surface is the commonest complaint, and it is nearly always a falls problem rather than a paving one. A terrace laid level, or laid to fall into a corner with nowhere to go, holds shallow puddles for days after rain in a British autumn. Beyond the nuisance, standing water keeps the bedding and sub base saturated through the winter, which is how a patio that looked perfect in its first summer starts to move in its second.

Slip is the safety issue, and it is seasonal. Shaded, damp stone and concrete grow algae and moss readily in this climate, and a green film on a smooth flag is genuinely dangerous underfoot, particularly on steps and on the route between the back door and the garden. Porous stone holds moisture and greens faster than dense porcelain, and a north facing terrace under trees will do it every year no matter what is laid.

Movement has three usual causes. Spot bedding leaves flags unsupported so they rock and crack; a sub base that was too thin or never properly compacted settles under use; and ground that was made up rather than dug into carries on consolidating for years. Add tree roots close to a terrace and the pattern becomes easy to read: damage that follows a line usually follows something buried, and damage that clusters near a mature tree usually follows the tree.

Looking after a patio through a British year

  • Clear leaf litter in autumn before it mats down, because a wet leaf layer feeds the algae that makes the surface slippery by January.
  • Treat moss and algae on shaded areas and on any steps, and treat the route people actually walk rather than only the open terrace.
  • Use a pressure washer sparingly and at a sensible distance: it strips jointing compound, erodes soft stone and can drive water under flags.
  • Check and refill joints when they begin to open, since open joints let water into the bedding, which is where movement starts.
  • Keep the surface clear of the damp proof course, and do not let new gravel, soil or a raised border build the level up against the wall.
  • Keep any drainage channel along the house free of grit and leaves, and check that its outlet still runs during heavy rain.
  • Look along the terrace from a low angle once a year: dips and rocking flags are far easier to see that way than from standing height.
  • Deal with a single rocking flag promptly, because the neighbouring units lose support once one has moved.

Site safety, the written specification and getting quotes through LokalMatch

Patio work involves wet cement and heavy units, and both carry real risks that a competent contractor manages visibly. HSE warns that wet cement is highly alkaline, that a serious burn or ulcer can rapidly develop if it is trapped against the skin, and that in extreme cases these burns may need a skin graft or cause a limb to be amputated. It adds that cement can cause chemical burns to the eyes and causes both irritant contact dermatitis and, through the hexavalent chromium it contains, allergic contact dermatitis, noting that some skilled tradesmen have been forced to change their trade because of it. The controls it expects include waterproof gloves suitable for high pH substances, long or tight fitting at the end so cement cannot be trapped against the skin, suitable footwear such as wellington boots where large concrete pours take place, and good washing facilities with hot and cold or warm running water, soap and towels, and basins large enough to wash forearms.

The units themselves are a manual handling matter. HSE states that employers must protect workers from the risk of injury from hazardous manual handling, that manual handling means transporting or supporting a load by hand or bodily force including lifting, putting down, pushing, pulling, carrying or moving loads, and that the law requires them to avoid hazardous manual handling so far as reasonably practicable, assess the risk from what cannot be avoided, and reduce that risk to as low as reasonably practicable. Large format flags are heavy enough that a two person lift or a lifting aid is the normal answer rather than a nicety.

For the specification itself, get the sub base depth and material, the bedding method, the paving product and thickness, the joint treatment, the direction and amount of fall, the position relative to the damp proof course, the drainage outlet and the arrangements for spoil all written down before work starts. If the patio is raised or involves building up levels, ask explicitly whether permitted development covers it. If it is near a boundary structure, ask whether party wall notice is required and who is serving it. LokalMatch is where you set that brief out once: you describe the patio, its size, the level change, what surrounds it and what you want laid, and matched patio contractors covering your postcode contact you directly. They pay for the requests they receive, so posting one costs a homeowner nothing. LokalMatch does not build patios and does not set prices, and it does not vet, rank or recommend anyone, so comparing the base specification and the drainage between quotations is still your job.

Patios: frequently asked questions

Do I need planning permission for a patio?

Usually not for a ground level one behind the house. The Planning Portal states that elsewhere around your house there are no restrictions on the area of land which you can cover with hard surfaces at, or near, ground level. Two things change that answer: significant works of embanking or terracing to support a hard surface might need a planning application, and a patio in the front garden falls under the separate front garden rules about permeable surfacing. If you live in a listed building you will need listed building consent for any significant works, whether internal or external.

How high can a raised patio or deck be without permission?

The permitted development condition is that the decking or platform is no more than 30 centimetres above the ground. Alongside that, the decking or platforms together with other extensions and outbuildings must cover no more than 50 per cent of the garden area, and none of it may be on land forward of a wall forming the principal elevation. In the General Permitted Development Order for England, raised in relation to a platform means a platform with a height greater than 0.3 metres, and the householder classes exclude anything that would consist of or include a verandah, balcony or raised platform, so above that height the right simply does not apply.

Do I have to tell my neighbour before I build a patio next to the boundary?

In England and Wales you may have to. The Party Wall etc. Act 1996 covers excavation near to and below the foundation level of neighbouring buildings. Notice is required if you excavate, or excavate for and construct foundations, within 3 metres of any part of a neighbouring owner's building or structure where any part of the work will go deeper than their foundations, or within 6 metres where the work will meet a line drawn downwards at 45 degrees in the direction of the excavation from the bottom of their foundations. Section 6 requires one month's notice. The Act does not apply in Scotland or Northern Ireland.

Are there extra restrictions in a National Park or a conservation area?

Yes, and they are specific. In National Parks, the Broads, Areas of Outstanding Natural Beauty and World Heritage Sites the maximum area to be covered more than 20 metres from the house is limited to 10 square metres. On Article 2(3) designated land no decking or platform is permitted either side of the house. Within the curtilage of a listed building, no decking or platform is permitted at all. A planning condition or an Article 4 Direction can also remove permitted development rights, which is a local question for your planning authority.

Why does my patio hold puddles after rain?

Almost always because the falls are wrong or the water has nowhere to go. A terrace laid level, or laid to fall into a corner without a drainage outlet, will hold shallow water for days in a British autumn. The consequence is not only inconvenience: a saturated bedding layer and sub base through the winter is what lets flags start to move. Check where the surface is meant to drain to and whether that outlet still runs, then look along the terrace from a low angle to find the dips.

Should the patio be level with my back door?

The finished surface should sit clear of the damp proof course so that rain splashing off the paving cannot bridge into the wall, and it should fall away from the house rather than towards it. Where a level threshold is wanted, the usual solution is a drainage channel running along the house that intercepts the water, rather than a flat terrace butted up to the wall. Ask the contractor where that channel discharges, because a channel that empties into a border which then waterlogs has not solved anything.

Why do some contractors refuse to spot bed flags?

Because flags laid on dabs of mortar are unsupported across most of their area. They rock underfoot, sound hollow when tapped and crack across the unsupported middle, often within the first year or two, and the only real remedy is lifting and relaying them. A full bed supports the whole unit and spreads load into the sub base. If a quotation does not say how the paving will be bedded, ask, and treat the answer as one of the main differences between competing prices.

How does LokalMatch work for patios?

You describe the patio once, including roughly how big it is, whether the ground is level or falls away, what surface you want and what is there now, and patio contractors working in your postcode area get in touch with you themselves. The contractors pay for the requests; homeowners are not charged for posting one. LokalMatch does not build patios, does not set prices and does not vet, rank or recommend any contractor, so comparing the base build up, the bedding method and the drainage between quotations is still down to you.

Sources

  1. Planning Portal: Patio and driveway
  2. Planning Portal: Decking
  3. The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 1 (householder development and the raised platform definition)
  4. GOV.UK: Party Wall etc. Act 1996 guidance
  5. GOV.UK: The Party Wall etc. Act 1996 explanatory booklet
  6. Planning (Listed Buildings and Conservation Areas) Act 1990, section 7: restriction on works affecting listed buildings
  7. HSE: Cement - construction health risks
  8. HSE: Manual handling at work

Written by the LokalMatch editorial team. Last reviewed 14 September 2026. How we write and check our guides

Find patio contractors by city

England

Show 173 cities

What affects the cost of patio

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size and thickness of the area
  • Removal of the old surface
  • Excavation and base preparation
  • Finish, colour or pattern
  • Access for equipment and trucks
  • Steps, curves, drains or retaining edges

How to compare patio contractors before you hire

  • Choose a contractor who explains how they'll prepare the base, since most concrete and interlock problems start underneath.
  • Ask how they'll slope the surface so water drains away from the house.
  • Get a written quote that covers excavation, base material, reinforcement, finish and removal of the old surface.
  • Look at jobs they finished a few seasons ago to see how they've held up through freeze and thaw.
  • Ask whether they'll call to have underground utilities located before digging.

Questions to ask patio contractors before you hire

  • How deep will you excavate, and what base will you put down?
  • Will you use reinforcement, and what kind?
  • How will you make sure water drains away from the house?
  • Does this work need a permit from my municipality?
  • How soon can the surface be walked on or driven on after it's done?
  • What warranty do you offer for cracking, settling or heaving?

When to call a pro for patio

  • Cracks that are widening or slabs that have sunk or lifted
  • Water pooling against the foundation after rain
  • Trip hazards on steps, walkways or driveways

Patio permits and local rules

Some patio work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get patio quotes?

Tell us about your patio project.

Do you offer patio services?

Join LokalMatch to get matched with homeowners in the areas you serve.