Construction Drawings near you

Construction drawings are the set the building is actually built from: constructional details, insulation build-ups, structural coordination, drainage runs, fire and sound separation and the specification the contractor prices against. They are not the planning drawings with more lines added. They answer a different question — not what will it look like, but how is it made — and they are the set the building control body assesses.

Tell us about your construction drawing project and we’ll help you find local drafters who serve your area.

Free for homeowners · No obligation to hire

On this page

In England and Wales there are two ways to use them. GOV.UK describes a full plans application as the most thorough option, with a decision expected within five weeks, or two months with your consent, and a completion certificate typically issued within eight weeks of the work finishing where it meets the regulations. A building notice is for smaller projects only, and you can start work two days after the notice is submitted to your building control body — but a building notice does not give you formal approval of the drawings in the way full plans does.

A structural warning about this area: it changed recently, and old guidance is misleading. Section 16 of the Building Act 1984, the classic passing or rejection of plans provision, was omitted on 1 October 2023 by virtue of the Building Safety Act 2022, except in relation to Wales where it applies until 1 July 2026. Anyone quoting section 16 at you about an English project is working from a superseded regime.

Three drawing sets, three different jobs

  • Planning drawings describe the development to the local planning authority: location plan, site plans, floor plans and elevations, drawn to an identified scale with a north point.
  • Building regulations drawings describe construction to the building control body: sections through the build-up, insulation, structure, ventilation, drainage and fire separation.
  • Construction issue drawings are what the builder works from, with dimensions, setting out and the detail resolved at the junctions rather than shown indicatively.
  • Structural drawings and calculations come from the engineer and are coordinated into the building regulations set rather than being a parallel document.
  • Specification, whether written separately or on the drawings, is what makes two builders' prices comparable.
  • As-built and revision drawings matter at the end: the decision notice and the completion certificate relate to specific numbered drawings, so keep the set that was actually approved.

Full plans or a building notice

A full plans application deposits the drawings for assessment before work starts. GOV.UK describes it as the most thorough option, says you can expect a decision within five weeks or two months with your consent, and says you will typically receive a completion certificate within eight weeks of the work being completed provided it meets the regulations. The advantage is that the detail is agreed before anybody builds it, which is what you want on anything structural or unusual.

A building notice is for smaller projects only. You can start work two days after the notice has been submitted to your building control body, and there is no formal approval of drawings. It suits simple, well-understood work with a builder who knows the regulations, and it is a poor choice on anything where an argument about the detail would be expensive to resolve on site.

There is a third route for work already done. GOV.UK says you can apply for regularisation — retrospective approval for work already carried out without consent — from a local authority building control body only, and only for work completed after 11 November 1985. You may need to open up or alter the work before approval is given, and you may have to correct the work or pay a fine if the regulations were not followed.

Who assesses the drawings, and the registered building inspector rules

In England and Wales there are two kinds of building control body and you choose between them: your local authority's building control service, or a private registered building control approver. Higher-risk buildings go to the Building Safety Regulator instead, which GOV.UK defines by criteria including 7 or more storeys or 18 metres or more in height with at least two residential units, along with hospitals and care homes.

The individuals doing the assessing are now regulated as well. GOV.UK guidance states that after April 2024, anyone intending to carry out regulated building control activities in England or Wales — assessing plans, carrying out inspections, or giving advice to building control bodies that carry out regulated functions — must be registered as a building inspector, and that after that date it is a criminal offence to work as a building inspector without being registered. The Building Safety Regulator maintains separate public registers for England and for Wales.

Registration is by class and category. Class 1 inspectors must work under supervision and no competency assessment is required; class 2 covers unsupervised work on standard buildings in categories A to F; class 3 covers unsupervised work including non-standard buildings in categories A to H; and class 4 covers technical managers who are class 2 or 3 with additional responsibilities. For a householder, the useful consequence is that you can check whether the person assessing your drawings is registered for the kind of building you are altering.

Work already built without approval

  • Regularisation is retrospective approval, and GOV.UK says it is available from a local authority building control body only — a registered building control approver cannot regularise.
  • It applies only to work completed after 11 November 1985; earlier work is outside the process.
  • You may need to open up the work so it can be inspected, which can mean removing finishes to expose structure, insulation or drainage.
  • You may have to correct the work before approval is given, and GOV.UK notes you may have to pay a fine if building regulations were not followed.
  • Drawings of what was actually built, rather than what was intended, are what the application needs — a survey of the completed work is usually the first step.
  • This is the route most often taken when a sale stalls, so it is worth starting well before a buyer's solicitor raises it.

Scotland and Northern Ireland do not work this way

Scotland uses a building warrant rather than an application to a building control body. The council's building standards department assesses the application and grants the warrant before work starts, and mygov.scot lists the work that needs one: building a new home, extending a home, building or removing load-bearing walls, changing roofs, external walls or other structural elements, converting a loft or garage into a room, and demolishing a building. It is an offence to start building work without a warrant when you need one, and you could be fined.

A Scottish warrant comes with paperwork you will not see in England: the warrant itself, a copy of the approved plans, and a Construction Compliance and Notification Plan setting out the stages at which the council must be notified. The warrant is valid for three years from the date it was granted, and the work should be completed within that time. The 32 local authorities are appointed as verifiers by Scottish Ministers for their own areas, so there is no private route equivalent to a registered building control approver.

Northern Ireland works to the Building Regulations (Northern Ireland) 2012, made by the Department of Finance and administered by 11 district councils, each with a statutory duty to enforce the regulations in its area. The regulations require formal notice to the district council when work is completed, and Building Control issues a certificate of completion once satisfied that the regulations have been met.

What goes wrong between drawing and building

  • The builder prices from planning drawings, so every construction decision becomes a variation once work starts.
  • A building notice is used on a project with structural complexity, and the disagreement about the detail happens on site with the trades standing around.
  • Drawings are revised by email without new numbers, so nobody can say which version was approved or which version was built.
  • The structural drawings and the architectural drawings show different things at the same junction, and the discrepancy is found when the steel arrives.
  • Inspection stages are missed, so work is covered up before it is seen and has to be opened again.
  • The completion certificate is never chased, and the gap surfaces years later when a buyer's solicitor asks for it.

What drives a construction drawings quote, and how LokalMatch fits in

The fee for a technical package tracks the number of details that have to be resolved rather than the floor area. A simple rear extension using standard construction needs a handful of sections and details; a conversion touching fire separation, sound insulation, structural alteration and new drainage needs many more, plus coordination with the engineer. Other variables are whether the set is produced for a full plans application or only for the builder, whether the fee includes answering building control queries and issuing revisions during construction, and whether a specification is written or left to the drawings. Ask which of those are inside the fee, because query responses and revisions are the usual extras.

LokalMatch is the introduction and stops there. Describe the drawings you need once with your postcode, and technicians, designers and practices covering your area will contact you. Homeowners pay nothing to use it; the professionals pay for the enquiries they receive. LokalMatch does not produce drawings, does not set fees and does not vet, rank or recommend anyone who responds, so compare the deliverables list before you compare the prices.

Construction Drawings: frequently asked questions

What is the difference between full plans and a building notice?

GOV.UK describes full plans as the most thorough option, with a decision expected within five weeks or two months with your consent, and a completion certificate typically within eight weeks of completion. A building notice is only for smaller projects, gives no formal approval of drawings, and lets you start work two days after the notice is submitted to your building control body.

Who can assess my building control application?

In England and Wales, either your local authority's building control service or a private registered building control approver. Higher-risk buildings go to the Building Safety Regulator instead. Since April 2024 the individuals carrying out regulated building control activities in England and Wales must themselves be registered building inspectors, and working unregistered is a criminal offence.

What is a registered building inspector?

Someone registered with the Building Safety Regulator to carry out regulated building control activities — assessing plans, carrying out inspections, or advising building control bodies that carry out regulated functions. Registration is by class: class 1 must work under supervision, class 2 covers standard buildings unsupervised, class 3 includes non-standard buildings, and class 4 covers technical managers.

Can I get approval for work that was already done?

Sometimes, through regularisation. GOV.UK says it is available from a local authority building control body only, and only for work completed after 11 November 1985. You may need to open up the work for inspection, you may need to correct it before approval, and you may have to pay a fine if the regulations were not followed.

Is section 16 of the Building Act 1984 still the rule?

Not in England. Section 16, the passing or rejection of plans provision, was omitted on 1 October 2023 by virtue of the Building Safety Act 2022, except in relation to Wales, where it applies until 1 July 2026. If a source is still describing the English process through section 16, it is out of date.

What do I need in Scotland instead?

A building warrant, granted by your council's building standards department before work starts. mygov.scot lists the work that needs one, including extensions, load-bearing wall changes, roof and external wall alterations, loft and garage conversions and demolition. It is an offence to start work needing a warrant without one, and the warrant is valid for three years from the date granted.

Sources

  1. GOV.UK: building regulations approval — how to apply (full plans, building notice, five weeks or two months, completion certificate within eight weeks, regularisation after 11 November 1985)
  2. GOV.UK: registered building inspectors (registration mandatory after April 2024 in England and Wales; criminal offence to work unregistered; classes 1 to 4)
  3. Building Act 1984, section 16 (omitted 1 October 2023 except in relation to Wales, where it applies until 1 July 2026), legislation.gov.uk
  4. mygov.scot: getting a building warrant (work needing a warrant, three-year validity, Construction Compliance and Notification Plan, offence to start without one)
  5. Building Control Northern Ireland: what we do (Building Regulations (Northern Ireland) 2012, Department of Finance, 11 district councils, completion certificate)
  6. GOV.UK: building regulations approval (local authority or registered building control approver; higher-risk buildings)

Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides

Find drafters by city

England

Show 173 cities

What affects the cost of construction drawing

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Type of professional and service needed
  • Size and complexity of the project
  • Level of detail in drawings or reports
  • Number of site visits and meetings
  • Number of design revisions
  • Help with permits or contractor selection

How to compare drafters before you hire

  • Match the professional to the job: an architect or engineer where the work requires one, a designer for layout and finishes, or an inspector for a condition report.
  • Ask whether they are licensed or certified for this type of work in your area, where that applies.
  • Review a portfolio or sample report that's similar to your project.
  • Get a written agreement that spells out the services, deliverables, number of revisions and how fees are charged.
  • Ask whether their drawings will be suitable for a permit application, and whether they'll help with it.

Questions to ask drafters before you hire

  • Are you licensed or certified for this type of work in my area?
  • What exactly will you deliver: drawings, specifications, a report or site visits?
  • How are your fees charged: a fixed fee, hourly or based on the project cost?
  • How many rounds of revisions are included?
  • Will your drawings be ready for a permit application, and will you submit it?
  • Can I see a sample of a similar project or report?
  • Do you carry professional liability insurance?

When to call a pro for construction drawing

  • Before removing or moving a wall that may be load-bearing
  • Before buying a home, to understand its condition
  • When a permit application needs drawings

Construction drawing permits and local rules

Some construction drawing work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Ready to get construction drawing quotes?

Tell us about your construction drawing project.

Do you offer construction drawing services?

Join LokalMatch to get matched with homeowners in the areas you serve.