Skip to content
LokalMatch

Bathroom Designers

Bathroom Designers near you

Bathroom design is an exercise in fitting drainage, ventilation, waterproofing and electrical safety into the smallest room in the house, usually without moving the soil stack. A designer produces a layout, an elevation set, a tiling and waterproofing specification and a services schedule, and the good ones start from where the waste can actually fall rather than from a picture of a freestanding bath.

Tell us about your bathroom design project and we’ll help you find local bathroom designers who serve your area.

Free for homeowners · No obligation to hire

On this page

One rule governs more design decisions in a bathroom than any other, and it is geometric. Approved Document P, 2013 edition, in force in England from 6 April 2013, defines a special location as the space surrounding a bath tap or shower head within a room containing a bath or shower. That space runs vertically from finished floor level to 2.25 metres, or to the shower head where it is fixed higher than that, and horizontally 0.6 metres from the edge of the bath tub or shower tray — or, where there is no bath tub or shower tray, 1.2 metres from the centre point of the shower head where it is attached to the wall or ceiling. A room containing a swimming pool or sauna heater is also a special location.

Inside that volume, any addition or alteration to existing circuits is notifiable, as well as the installation of new circuits. Outside it, additions and alterations to existing installations are not. So the position of the shower head on the drawing is not a styling choice: it moves a legal boundary around the room.

The special location: 2.25 metres up, 0.6 metres out

The definition reproduced in Approved Document P is precise. Within a room containing a bath or shower, the special location is the space surrounding a bath tap or shower head extending vertically from finished floor level to a height of 2.25 metres, or to the position of the shower head where it is attached to a wall or ceiling higher than 2.25 metres. Horizontally it extends from the edge of the bath tub or shower tray to a distance of 0.6 metres; where there is no bath tub or shower tray, it extends 1.2 metres from the centre point of the shower head.

Inside that zone, minor additions and alterations to existing circuits are notifiable as well as new circuits. That is why a wet room with a wall-mounted head and no tray has a substantially larger notifiable zone than a bath with a shower over it — 1.2 metres of radius instead of 0.6 metres from a tray edge. A designer who moves the shower to the far wall changes the electrical scope of the job at the same time.

Approved Document P also carries a note alongside its diagram that socket outlets should not be located within 3 metres of a bath tub or shower tray. In most British bathrooms that effectively rules out a general-purpose socket altogether, which is worth knowing before a scheme is drawn with a vanity charging point in it.

The layouts that actually work in a British bathroom

  • Bath with a shower over: the most space-efficient arrangement and the one with the smallest notifiable electrical zone, because the 0.6 metre horizontal dimension runs from the bath edge.
  • Separate bath and shower enclosure, which needs a room wide enough that the enclosure door does not foul the bath, and doubles the waterproofing detail.
  • Walk-in shower with a low-profile tray, which keeps the tray-edge geometry while giving the appearance of a wet room.
  • A full wet room with a formed floor gradient and tanking to the substrate, which is the most demanding to build and the least forgiving of a poor fall.
  • Cloakroom or en suite conversions, where the constraint is almost always the distance and the fall from the new waste to the existing stack.
  • Accessible and level-access layouts, which change door swings, turning space and the position of every fitting, and are best designed from the outset rather than retrofitted.

Adding a bathroom where there was not one before

Replacing sanitaryware in an existing bathroom is usually a like-for-like fit-out. Creating a new bathroom in a bedroom, a landing cupboard or a loft is building work: new drainage has to be connected, the floor structure may need altering, ventilation has to be provided, and a new circuit is very likely. That brings the project within the approval route, which in England and Wales runs through either your local authority's building control service or a private registered building control approver.

GOV.UK notes that you may avoid a separate application where the work is done by someone registered with a competent person scheme, who notifies on your behalf. That covers the electrical and plumbing elements in many domestic bathrooms, but it does not cover structural alterations, and it does not remove the need for approval where the project changes the building rather than its fittings.

Scotland uses a building warrant rather than building regulations approval, granted by the council's building standards department before work starts, and it is an offence to begin work that needs a warrant without one. Northern Ireland works to the Building Regulations (Northern Ireland) 2012, administered by the district councils. Check which system applies to your address before assuming the English route.

The order a bathroom is actually built in

  • Survey the drainage first: where the stack is, what fall is available, and whether the new positions can reach it without a pump.
  • Fix the layout and the shower head position, because that sets both the waterproofing extent and the notifiable electrical zone.
  • Strip out, then first fix plumbing and electrics, with the wall build-up decided before tiling because it changes the finished dimensions.
  • Waterproofing and substrate preparation, which is the stage that decides whether the bathroom leaks in five years and the one most often rushed.
  • Tiling, then second fix, then sealing, with the sequence of sealant and grout agreed rather than improvised.
  • Commissioning, electrical certification and a soak test of the shower area before anything is decorated around it.

The recurring bathroom design failures

  • The layout is drawn without checking the fall to the stack, and the waste has to be boxed in at an angle that ruins the elevation.
  • A socket or a shaver point is placed too close to the bath, ignoring the note in Approved Document P that socket outlets should not be located within 3 metres of a bath tub or shower tray.
  • Tanking stops at the tile line rather than continuing behind the tray and up the adjoining walls, and water tracks out at the junction.
  • Extract ventilation is left to a small fan with a long duct run, so the room never dries and the grout blackens.
  • The wet room gradient is formed to the wrong point, so water pools at the door threshold instead of running to the gully.
  • Underfloor heating is laid without accounting for the floor build-up, and the finished floor no longer clears the door.

What drives a bathroom design quote, and how LokalMatch fits in

The variables that move a bathroom price are almost all invisible in the finished photograph: whether the drainage positions stay put, whether the floor or walls need rebuilding, how much tanking the layout demands, tile size and format, whether underfloor heating and a new circuit are involved, and whether the room is on a floor where access for the trades is awkward. Sanitaryware and brassware can range enormously without changing the labour at all, which is why two quotations for the same room can differ more in specification than in workmanship. Ask for the labour and the goods to be shown separately.

LokalMatch is an introduction service and nothing more. Describe the bathroom once, give your postcode, and designers and installers who cover your area will contact you directly. It costs homeowners nothing; the professionals pay for the enquiries they receive. LokalMatch does not design or install bathrooms, does not set prices and does not vet, rank or recommend anyone who responds.

Bathroom Designers: frequently asked questions

How close to a bath can a socket be?

Approved Document P, 2013 edition, carries a note that socket outlets should not be located within 3 metres of a bath tub or shower tray. Separately, it defines a special location around the bath tap or shower head — up to 2.25 metres high and 0.6 metres out from the bath or tray edge — within which additions and alterations to existing circuits are notifiable as well as new circuits.

Why does a wet room have a bigger electrical restriction than a shower tray?

Because the geometry changes. Approved Document P measures the special location horizontally from the edge of the bath tub or shower tray to 0.6 metres, but where there is no tub or tray it measures 1.2 metres from the centre point of the shower head. Removing the tray therefore roughly doubles the horizontal dimension of the notifiable zone.

Do I need building control for a new en suite?

Usually yes, because creating a bathroom where there was not one involves new drainage, ventilation and almost always a new circuit. In England and Wales you apply either to your local authority's building control service or to a private registered building control approver, and some of the work can be notified on your behalf by a tradesperson registered with a competent person scheme.

Is the rule the same in Scotland?

No. Scotland uses a building warrant granted by the council's building standards department before the work starts, and it is an offence to begin work that needs a warrant without one. A warrant is valid for three years from the date it was granted. Northern Ireland has its own regulations, administered by the district councils.

What is the most common cause of a bathroom leaking later?

Waterproofing that stops short. Tanking has to continue behind and under the tray or bath and up the adjoining walls to the full wetted height, not just to the top of the tiles. It is a stage that is quick to skimp and expensive to revisit, so ask what system is being used and where it terminates before the tiling starts.

Should the designer or the plumber decide where the shower goes?

Both, at the same time. The shower position is simultaneously a drainage question, a waterproofing question and, under Approved Document P, an electrical notification question. A layout agreed on paper without the drainage survey is the single most common reason bathroom schemes are redrawn on site.

Sources

  1. Approved Document P, electrical safety — dwellings, 2013 edition, full text (PDF): definition of a special location and the notifiable work diagram, GOV.UK
  2. GOV.UK: Approved Document P, electrical safety — dwellings
  3. GOV.UK: building regulations approval (building control bodies and competent person schemes)
  4. mygov.scot: getting a building warrant (when a warrant is needed, three-year validity, offence to start without one)

Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides

Find bathroom designers by city

England

Show 173 cities

What affects the cost of bathroom design

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Type of professional and service needed
  • Size and complexity of the project
  • Level of detail in drawings or reports
  • Number of site visits and meetings
  • Number of design revisions
  • Help with permits or contractor selection

How to compare bathroom designers before you hire

  • Match the professional to the job: an architect or engineer where the work requires one, a designer for layout and finishes, or an inspector for a condition report.
  • Ask whether they are licensed or certified for this type of work in your area, where that applies.
  • Review a portfolio or sample report that's similar to your project.
  • Get a written agreement that spells out the services, deliverables, number of revisions and how fees are charged.
  • Ask whether their drawings will be suitable for a permit application, and whether they'll help with it.

Questions to ask bathroom designers before you hire

  • Are you licensed or certified for this type of work in my area?
  • What exactly will you deliver: drawings, specifications, a report or site visits?
  • How are your fees charged: a fixed fee, hourly or based on the project cost?
  • How many rounds of revisions are included?
  • Will your drawings be ready for a permit application, and will you submit it?
  • Can I see a sample of a similar project or report?
  • Do you carry professional liability insurance?

When to call a pro for bathroom design

  • Before removing or moving a wall that may be load-bearing
  • Before buying a home, to understand its condition
  • When a permit application needs drawings

Bathroom design permits and local rules

Some bathroom design work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Ready to get bathroom design quotes?

Tell us about your bathroom design project.

Do you offer bathroom design services?

Join LokalMatch to get matched with homeowners in the areas you serve.