Skip to content
LokalMatch

Stair Flooring

Stair Flooring near you

Stairs are the most heavily regulated surface in an American house, and the numbers are tighter than almost anyone expects. Changing what you walk on changes the geometry, because a tread cap, a new nosing or a thicker finished floor at the top or bottom of a flight alters riser heights. That is why a stair job that looks like flooring is really a code job with flooring attached.

Tell us about your stair flooring project and we’ll help you find local flooring contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

The specific limits come from the International Residential Code, which most states and cities adopt with amendments. As published by cities that enforce it, the code sets a maximum riser height of 7 3/4 inches and a minimum tread depth of 10 inches, and then adds the requirement that trips up remodelers: the greatest riser height within any flight of stairs shall not exceed the smallest by more than 3/8 inch, with the same 3/8 inch limit on tread depth. Uniformity, not just the maximum, is the rule.

The reason the code cares is that people fall on stairs, and they fall on the step that is different from the others. A flight where fifteen risers are identical and the top one is half an inch taller is exactly the arrangement that puts someone on the floor. Any conversation about capping treads, switching from carpet to wood, or adding a thick floor at a landing should start with a tape measure on the existing risers.

IRC stair geometry: the numbers a reflooring job has to respect

The code text is short and worth knowing before you shop. Dimensions are measured exclusive of carpets, rugs or runners, so a carpeted stair is measured to the wood underneath. The riser height shall be not more than 7 3/4 inches, measured vertically between the leading edges of adjacent treads, and the greatest riser height within any flight shall not exceed the smallest by more than 3/8 inch. Risers must be vertical or sloped from the underside of the nosing of the tread above at not more than 30 degrees from vertical, and at open risers more than 30 inches above the floor below, the opening must not allow a 4-inch-diameter sphere to pass.

Treads are governed the same way. The tread depth shall be not less than 10 inches, measured horizontally between the vertical planes of the foremost projection of adjacent treads, and the greatest tread depth within any flight shall not exceed the smallest by more than 3/8 inch. Winder treads, the wedge-shaped ones at a turn, have their own rule: not less than 10 inches at the walkline and not less than 6 inches at any point in the clear width.

Nosings matter more than people expect in a reflooring job, because a retread cap changes them. The radius of curvature at the nosing must not be greater than 9/16 inch, or a bevel not greater than 1/2 inch, and a nosing projection of not less than 3/4 inch and not more than 1 1/4 inches is required on stairways. The greatest nosing projection must not exceed the smallest by more than 3/8 inch within a stairway. There is one exception worth knowing: a nosing projection is not required where the tread depth is not less than 11 inches.

The first and last riser are where stair refloorings go wrong

Here is the failure mode, and it is almost universal. If you add a 3/4 inch tread cap to every step in a flight, every riser between the steps stays the same, because both the top and the bottom of each riser moved up by the same amount. The exception is the bottom riser, which now measures 3/4 inch taller, because the floor it starts from did not move. Do the same at the top, where a new floor on the landing is thicker than what was there, and the top riser changes too.

Three-quarters of an inch is twice the 3/8 inch uniformity tolerance the code allows, so a flight that was compliant before the job is not compliant after it. Where the existing risers were already close to the 7 3/4 inch maximum, the new bottom riser can also exceed the maximum outright.

A competent stair contractor will raise this in the first conversation and will have answers: use a thinner cap or a full tread replacement that matches the original thickness, build up the floor at the bottom of the flight to match, rebuild the bottom step, or extend the new flooring across the landing and the first tread to keep the relationship intact. What you do not want is to find out at the final inspection, or at a real estate inspection years later.

Retread caps, full tread replacement and carpet-to-wood conversions

There are several ways to change a staircase and they differ mainly in how much thickness they add and how much of the original structure survives.

  • Retread caps: a thin hardwood or engineered overlay glued and fastened over the existing tread, fastest and the option most likely to change riser heights.
  • Full tread replacement: the old tread comes off and a new solid tread of matched thickness goes on, more work and geometry-neutral.
  • Riser covers: thin panels over the existing risers, usually painted, which change tread depth slightly if they project.
  • Carpet to wood conversion: removing carpet, pad and hundreds of staples, then discovering what the builder-grade treads underneath actually look like.
  • Stair nosing pieces made to match a plank floor, which is how engineered and vinyl plank floors are carried onto a stair.
  • Skirt boards and stringer trim, the finished boards along the wall, which are where the carpentry quality is most visible.
  • Balusters, newel posts and handrails, frequently the real reason people want the stair redone and a separate scope from the treads.

Handrails, headroom and stair width

A reflooring job regularly disturbs the handrail, and putting it back where it was is not automatically correct. The code requires handrails on at least one side of each continuous run of treads or flight with four or more risers, and sets handrail height, measured vertically from the sloped plane adjoining the tread nosing, at not less than 34 inches and not more than 38 inches. Because a tread cap raises that sloped plane, a handrail that measured 35 inches before the job measures less afterwards.

Continuity and grip are also specified. Handrails must be continuous for the full length of the flight, from a point directly above the top riser to a point directly above the lowest riser, with the ends returned or terminating in newel posts or safety terminals, and a handrail adjacent to a wall must have a space of not less than 1 1/2 inches between the wall and the rail. For grip, a circular handrail must have an outside diameter of at least 1 1/4 inches and not more than 2 inches, and a non-circular Type I rail must have a perimeter of at least 4 inches and not more than 6 1/4 inches with a maximum cross-sectional dimension of 2 1/4 inches.

Two other dimensions constrain the space itself. Stairways must be not less than 36 inches in clear width above the handrail height, with the clear width at and below handrail height not less than 31 1/2 inches where a handrail is on one side and 27 inches where handrails are on both sides, and handrails must not project more than 4 1/2 inches on either side. Headroom must be not less than 6 feet 8 inches, measured vertically from the sloped plane adjoining the tread nosings. A thick new floor at the top of a flight reduces headroom at the bottom of the flight above it, which is a real consideration in a house with a low basement ceiling.

Painted risers and stair trim in a pre-1978 house

Stairs in older American houses are usually painted, and paint is what brings the federal lead rule into a flooring job. EPA states that anyone paid to perform work that disturbs painted surfaces in homes, childcare facilities and preschools built before 1978 must be certified, with employees either certified renovators or trained on the job by a certified renovator. Sanding painted risers, prying off a painted skirt board or cutting into painted stair trim is exactly the kind of work the rule was written for.

The small-job exemption does not help much on a staircase. EPA excludes minor repair and maintenance disturbing six square feet or less of paint per room inside, but says demolition of painted surfaces is always covered regardless of square footage, that work in the same room within 30 days counts as one job, and that the exemption is lost entirely if a prohibited practice is used, including high-speed sanding or grinding machines without a shroud or containment system and a HEPA vacuum attachment.

So if the house predates 1978, the two questions to ask any stair contractor are whether the firm holds EPA lead-safe certification and how the dust will be contained on an open stairwell, which is one of the hardest spaces in a house to isolate. EPA publishes a searchable database of lead-safe certified firms and runs the National Lead Information Center at 1-800-424-LEAD for questions.

How a stair reflooring job actually runs

  • Measurement first: every riser in the flight is measured individually, along with tread depths, nosing projections and handrail height, before anything is ordered.
  • Geometry decision: whether the new surface is thickness-neutral, and what happens at the bottom riser and the top landing if it is not.
  • Demolition: carpet, pad, tack strip and staples come out, or the old treads come off, with dust containment planned for an open stairwell.
  • Assessment of what is underneath, since builder-grade treads under carpet are often not finish-grade material and squeaks are easiest to fix at this stage.
  • Fitting: treads and risers scribed to walls and skirt boards, which is where the visible quality of the job is decided.
  • Fastening and adhesive, with the assembly checked for movement before any finish goes on, since a squeak is far harder to chase later.
  • Handrail, balusters and trim reinstalled to the correct height above the new walking surface rather than back in the old holes.
  • Finishing, then keeping everyone off the stair for the full cure, which is an awkward but non-negotiable part of the schedule.

What drives a stair flooring quote, and how LokalMatch fits in

Stairs are priced per step for good reason: every one is a small, fitted carpentry job and none of them can be cut from a template. What moves an American quote is the number of risers, whether the flight is straight or has winders or a landing, whether it is open on one side or closed between two walls, whether treads are capped or fully replaced, the species and finish, what has to be removed first and how much staple and adhesive cleanup that leaves, whether the geometry work at the top and bottom risers is included, whether handrails and balusters are in scope, and whether the house predates 1978 and needs a lead-safe certified firm with containment on an open stairwell. Ask for the per-step price and what the bottom riser plan is.

LokalMatch is where you begin. You describe the staircase once: how many steps, straight or turning, open or between walls, what is on it now, what you want instead, and the age of the house. Carpenters and flooring contractors serving your area receive the request and the interested ones contact you directly. Pros pay for the requests they receive and the service is free to homeowners. LokalMatch does not build or refinish stairs, does not set prices, and does not vet, rank or recommend any contractor, so confirming licensing where your city requires it, checking insurance and reading the written scope, including how the riser heights will be kept within tolerance, stays with you.

Stair Flooring: frequently asked questions

Can I just glue new treads over my existing stairs?

You can, but the thickness has to be accounted for. Capping every tread leaves the risers between the steps unchanged while making the bottom riser taller by the thickness of the cap, and a thicker floor at the top landing does the same to the top riser. The code allows the greatest riser in a flight to exceed the smallest by no more than 3/8 inch, so a 3/4 inch cap breaks the tolerance on its own unless the bottom of the flight is addressed.

What are the actual stair dimensions the code requires?

As published by cities that adopt the International Residential Code, the riser height must be not more than 7 3/4 inches and the tread depth not less than 10 inches, measured exclusive of carpets, rugs or runners. Within a flight, the greatest riser must not exceed the smallest by more than 3/8 inch and the same limit applies to tread depth. Your state or city adopts a specific edition with amendments, so confirm the version your building department enforces.

Do I need to move the handrail after adding tread caps?

Very likely. Handrail height is measured vertically from the sloped plane adjoining the tread nosing and must be not less than 34 inches and not more than 38 inches, so raising the walking surface lowers the effective height. The rail also has to be continuous from a point above the top riser to a point above the lowest riser, with returned ends or newel posts, and at least 1 1/2 inches of clearance from an adjacent wall.

Is going from carpet to wood on stairs a big job?

Bigger than it looks. Removing carpet, pad, tack strip and hundreds of staples is the easy part; what is underneath is often builder-grade material never meant to be seen, so caps or full replacement treads are usually needed. It is also the best moment to fix squeaks and loose treads, since the structure is exposed. Stairs are priced per step because each one is an individually fitted piece of carpentry.

Does the lead rule apply to painted stairs?

In a pre-1978 house, yes, if the work disturbs the paint. EPA requires anyone paid to disturb paint in pre-1978 housing to be certified, with certified or on-the-job-trained renovators doing the work. The small-job exemption rarely helps here, because demolition of painted surfaces is always covered regardless of area and the exemption disappears if a high-speed sander is used without a shroud and HEPA attachment. Containing dust in an open stairwell is the practical challenge.

Will a thicker floor upstairs affect headroom?

It can, and it is easy to overlook. Headroom in all parts of a stairway must be not less than 6 feet 8 inches, measured vertically from the sloped plane adjoining the tread nosings. Adding floor thickness on an upper level lowers the ceiling over the flight below it. In a house with a low basement ceiling or a stair that already passes close under a beam or a soffit, measure before choosing a build-up.

Sources

  1. City of Boise: IRC Section R311.7.5 Stair Treads and Risers
  2. Town of Timnath, Colorado: 2018 Residential Stair Guide (IRC Section R311.7, width, headroom, handrails)
  3. EPA: Lead Renovation, Repair and Painting Program
  4. EPA: How will EPA interpret the term minor repair and maintenance activities?
  5. EPA: I am planning to renovate my home. How can I find a lead-safe certified firm?

Written by the LokalMatch editorial team. Last reviewed September 21, 2026. How we write and check our guides

Find flooring contractors by city

Alaska

Show 1 cities

California

Show 186 cities

Delaware

Show 1 cities

Florida

Show 82 cities

Maine

Show 1 cities

Texas

Show 79 cities

What affects the cost of stair flooring

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Floor area and the number of rooms
  • Type and grade of flooring
  • Removal of the existing floor
  • Subfloor repairs or levelling
  • Stairs, angles and custom cuts
  • Trim, transitions and baseboards

How to compare flooring contractors before you hire

  • Choose an installer who works regularly with the type of flooring you want, since hardwood, tile, vinyl and carpet each need different skills.
  • Ask them to check the subfloor and moisture levels before giving a final price.
  • Get a written quote that covers removal of the old floor, subfloor prep, underlay, trim and transitions.
  • Ask whether you or the installer will supply the flooring, and who is responsible for ordering extra for waste.
  • Look at recent work in person or in photos, paying attention to seams, edges and transitions.

Questions to ask flooring contractors before you hire

  • Will you remove and dispose of the old flooring?
  • How will you check and prepare the subfloor?
  • Is my space suitable for this type of flooring, especially in a basement, kitchen or bathroom?
  • Are baseboards, transitions and stair nosings included?
  • Will you move the furniture and appliances, or should I?
  • Does your workmanship warranty cover problems like lifting, gaps or cracked tiles?

Stair flooring permits and local rules

Some stair flooring work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get stair flooring quotes?

Tell us about your stair flooring project.

Do you offer stair flooring services?

Join LokalMatch to get matched with homeowners in the areas you serve.