Paving

Paving near you

Paving in the United States usually means hot-mix asphalt over a compacted aggregate base: a driveway, a parking pad beside the garage, a lane back to a detached shop, or an apron widened to fit a second vehicle. The black surface is what you look at and the least of what you are buying. Whether the pavement is still flat and quiet in fifteen years is decided underneath it, by how deep the excavation went, what stone went in, how thoroughly each layer was compacted, and where the water goes once it leaves the edge.

Tell us about your paving project and we’ll help you find local paving contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

Two things about paving are specific to this country and worth knowing before you call anyone. Excavation comes first, and excavation means contacting 811, the free national before-you-dig service, so that utilities mark what is buried in the path of the machine. And nearly every rule you will hear quoted about paving comes from your own city or county rather than from a national code: whether a permit is needed, how wide the driveway may be, how close to the line it may sit, and how much of the lot may be covered in hard surface. Two towns an hour apart answer those questions differently, so a contractor's confident claim that this kind of work never needs a permit describes the towns they usually work in rather than the law where you live.

How an asphalt driveway or parking pad actually gets built

Start with the part that has nothing to do with asphalt. 811 is the free national before-you-dig service, and its instruction is plain: anyone who plans to dig should contact 811 or go to their state 811 center's website before digging, to request that the approximate location of buried utilities be marked with paint or flags so that you do not unintentionally dig into an underground utility line. The request goes in a few business days ahead of the work. Depth is no excuse for skipping it, because some utilities sit just inches below the surface and every digging project, regardless of depth, requires contacting 811. The marks cover utility-owned lines only, so tell the crew about anything a previous owner buried themselves, and once the marks are down, dig carefully around them.

Then the pavement is built from the bottom up. Turf, topsoil and any old surface come off until the crew reaches soil that can be compacted; the subgrade is shaped to the finished slope and rolled; a graded stone base goes down and is compacted in layers rather than in one deep lift; and the asphalt is placed hot and rolled before it cools, in one or more lifts depending on what will drive on it. A crew that finishes a large driveway suspiciously fast has usually found the time in the base, and that is the one saving that never shows up until the second or third winter.

The grade is set before any asphalt arrives. Pavement has to shed water somewhere other than the garage door and the foundation, which means a deliberate slope, a defined and supported edge so the asphalt does not crumble where the wheels run off it, and a decision about the low corner. Ask to be shown where the water is meant to go while the base is still open. Afterwards it is a much more expensive conversation.

Paving permits are a city question, and cities genuinely answer it differently

There is no national paving permit. Portland, Oregon shows one shape the rules take: a zoning permit is required for creating a new or enlarged parking area or driveway, or paving a graveled parking area; a building permit is required to move more than ten cubic yards of earth as site development; and a building permit is also required to pour concrete sidewalks, slabs and driveways more than thirty inches above adjacent grade or over any story or basement. Portland attaches a reminder worth carrying into any jurisdiction, which is that all projects must follow zoning rules even when a building permit is not required.

Fairfax County, Virginia draws its line somewhere else entirely. It lists driveways among the projects that do not need a building permit, and then adds the caveat that matters more than the exemption: depending on the size and location of your project, additional approvals may be necessary, and setbacks and other zoning requirements may apply. It also warns that for driveway improvements, water connections, sewer connections or landscaping within the state right-of-way, a permit from the state transportation department may be required. The strip between your property line and the road is very often not yours to pave as you please.

So make one call to your building or planning department before the design is settled, and ask four things: does this need a building or a zoning permit, what are the setbacks from the property lines, is there a cap on how much of the lot may be hard surface, and who controls the section between the sidewalk and the street. Those four answers can change the shape of the driveway, and none of them costs anything to obtain.

Dense hot-mix asphalt against porous asphalt over a stone reservoir

Most residential paving is dense-graded hot-mix asphalt, designed to shed water off the surface and away. The alternative is a porous asphalt pavement with a stone reservoir, which the Federal Highway Administration describes as a low impact development technology that provides a pavement surface for parking, walkways, trails and roads while also being designed to manage and treat stormwater runoff, and which FHWA notes is recognized as a best practice by the Environmental Protection Agency and many state agencies.

The cross section is the interesting part, and it inverts the usual instinct. FHWA describes porous asphalt as typically built over an uncompacted subgrade to maximize infiltration through the soil, with a geotextile fabric above the subgrade to prevent fines migrating up into the stone, then a reservoir of uniformly graded clean crushed stone with forty percent voids that temporarily stores water as it soaks away, a thin stabilizing or choker course of smaller single-size stone to pave against, and open-graded asphalt layers on top carrying typically between sixteen and twenty-two percent air voids. FHWA reports that the University of New Hampshire Stormwater Center found a seventy-five percent or greater reduction of deicing salts on this kind of surface.

It is not a default choice, and FHWA is candid about why. The listed limitations include higher initial pavement structure costs, sloped pavements requiring extra design work such as terracing, underground berms and drainage pipes at low points, potential clogging with dirt and organic debris that demands specialized maintenance such as vacuuming, limited use in heavy loading areas where sharp turns are probable, and a caution that porous pavements should not be constructed where there is a high risk of toxic spills. Poorly drained soil or a high water table rules the system out before the conversation starts.

EPA adds two benefits that never appear on a paving bid. Besides reducing the runoff from the rain that falls on them, permeable pavements can help filter out pollutants that contribute to water pollution, and they can reduce the need for road salt. Where your city has stormwater requirements, it is worth asking whether a permeable surface counts toward them before you assume the cheaper pavement is the cheaper project.

Frost depth, spring thaw and the months asphalt can be laid properly

In the northern states the ground freezes far deeper than most homeowners picture, and the base under a driveway sits inside that frozen layer. Minnesota's building rules give a sense of the scale: in the absence of a determination by an engineer competent in soil mechanics, the minimum allowable footing depth due to freezing is five feet in the state's Zone I and three and a half feet in Zone II. A driveway is not a footing and is never built that deep, which is precisely why frost governs it. The base has to be built of material that drains, so there is no trapped water in the pavement structure to turn into ice and lift what sits above it.

The hardest moment of the year is not the coldest week but the thaw. The still-frozen ground below holds meltwater in, the layer above softens, and for a few weeks the subgrade carries far less load than it does in August. That is why a delivery truck, a dumpster or a concrete mixer in early spring can leave ruts in a driveway that shrugged off the same weight the previous summer, and why experienced crews would rather rebuild a base once the ground has drained than while it is still saturated.

Hot-mix asphalt has to be compacted while it is still hot, so cold ground and cold air shorten the window in which a crew can place and roll it properly. Across the northern half of the country that bunches paving into the warmer months and books good contractors out well ahead. In the South and Southwest the season runs far longer and the antagonists change: ultraviolet exposure hardening the surface, and a subgrade that shrinks and swells with the moisture in the soil rather than with frost.

Why new asphalt fails early

  • The base was too thin or was compacted in one deep lift instead of several, so the pavement flexes under every vehicle until it cracks.
  • The subgrade was never brought back to soil that would compact, leaving soft ground or buried organic material under one part of the slab.
  • The grade sheds water toward the garage or the foundation instead of away, so the pavement and its base stay wet.
  • There is no supported edge, and the asphalt crumbles along the line where wheels drop off it or where soil has eroded away.
  • Downspouts, sump discharges or a neighbouring slope send concentrated water across or under the pavement.
  • Asphalt was placed on cold or wet ground, or rolled after it had cooled too far, so it never reached the density it was designed for.
  • A porous surface was installed on poorly drained soil, or was sanded or allowed to silt up, and it no longer infiltrates anything.
  • Loads the driveway was never built for, such as a loaded truck, a dumpster or a vehicle parked on the same spot all season, have pushed the surface out of shape.

Keeping water out of the pavement and out of the base

  • Fill cracks while they are still narrow, because the crack is the route water takes into the base rather than the damage itself.
  • Keep the edges supported with soil or a proper edging, and repair the spot where a wheel habitually drops off before it becomes a broken edge.
  • Clear leaves, silt and debris from the low side so surface water can leave the pavement rather than stand on it.
  • Point downspouts and sump discharges somewhere other than the driveway, and keep the surrounding grade shedding away from it.
  • On a porous surface, follow the opposite instinct: Connecticut's environmental agency advises that pervious pavements be vacuumed with a specially designed vacuum two to four times a year to remove debris and excess sediment from the void spaces.
  • Never sand a porous pavement. The same Connecticut guidance is explicit that pervious pavements should not be treated with sand, to prevent clogging the infiltration spaces.
  • Keep soil, mulch and compost piles off any permeable surface, which the guidance says should be avoided in areas with high sediment loads.
  • Treat an unsolicited offer to seal or resurface with material left over from another job as a reason to get a second opinion rather than a bargain.

What moves a paving quote, and where LokalMatch fits in

Two paving bids usually differ because the contractors are proposing different amounts of excavation and base, not different asphalt. The variables that move the number are the measured area and the thickness the use demands, how much old surface and soil has to come out and be hauled away, the depth and type of the stone base, how much regrading and drainage work the site needs, access for trucks and rollers, edges, curves and transitions at the garage and the street, and whether a permeable system with its stone reservoir and geotextile is being built instead of a conventional one. Ask for the excavation depth and the base specification in writing and the comparison becomes possible.

LokalMatch is where the search starts. You describe the paving job once, including the rough size, what is there now and what will drive on it, and paving contractors covering your area receive that request and get in touch directly. The pros pay for the requests they receive; homeowners use the service at no charge. LokalMatch does not do the paving, does not set or quote prices, and does not vet, rank or recommend any contractor, so confirming licensing, insurance and recent local work you can walk on is still your own job.

Paving: frequently asked questions

Do I have to call 811 before a driveway is paved?

Yes, because paving begins with excavation. 811 is the free national before-you-dig service and it asks anyone planning to dig to contact it, or their state 811 center's website, a few business days beforehand so utilities can mark the approximate location of buried lines with paint or flags. It is blunt that every digging project, regardless of depth, requires contacting 811, since some utilities sit only inches down. Lines a previous owner installed privately are not marked, so point those out to the crew.

Does paving a driveway need a permit?

That depends entirely on your city or county. Portland requires a zoning permit to create a new or enlarged driveway or parking area, or to pave a graveled parking area, and a building permit to move more than ten cubic yards of earth. Fairfax County lists driveways as not needing a building permit, while warning that setbacks and other zoning requirements may still apply and that work in the state right-of-way may need a transportation department permit. Ask your own jurisdiction before the design is fixed.

Is porous asphalt worth considering for a home driveway?

It can be, on the right site. FHWA describes porous asphalt with a stone reservoir as managing and treating stormwater while still providing a pavement surface, and reports a seventy-five percent or greater reduction of deicing salts from the UNH Stormwater Center. It also lists the limitations honestly: higher initial structure costs, extra design work on slopes, clogging that requires specialized vacuuming, and limited use in heavy loading areas with sharp turns. Poorly drained soils and a high water table rule it out.

Why does frost matter so much to a driveway in a cold state?

Because the whole pavement structure sits inside the layer that freezes. Minnesota's rules, as an indication of how deep that layer reaches, set a minimum footing depth due to freezing of five feet in Zone I and three and a half feet in Zone II absent an engineer's determination. A driveway is nowhere near that deep, so the defence is a base built from material that drains rather than one that holds water where it can freeze and lift.

What is the best time of year to have paving done?

In the northern half of the country, the warmer months, because hot-mix asphalt must be compacted while it is still hot and cold ground shortens that window. Avoid heavy loads on a new or existing driveway during the spring thaw, when the subgrade is briefly much weaker than it is in midsummer. In the South and Southwest the season is far longer, and the limiting factors are ultraviolet exposure and a subgrade that moves with soil moisture instead of frost.

Sources

  1. 811: the free national call-before-you-dig service
  2. FHWA Technical Brief: Porous Asphalt Pavements with Stone Reservoirs (FHWA-HIF-15-009)
  3. US EPA Soak Up the Rain: Permeable Pavement
  4. Connecticut DEEP: A Resident's Guide to Pervious Pavement in Connecticut
  5. City of Portland, Oregon: When you need a residential permit
  6. Fairfax County, Virginia: When a permit is required
  7. Minnesota Rules 1303.1600: Footing depth for frost protection
  8. US EPA: Green Infrastructure

Written by the LokalMatch editorial team. Last reviewed September 14, 2026. How we write and check our guides

Find paving contractors by city

Alaska

Show 1 cities

California

Show 186 cities

Delaware

Show 1 cities

Florida

Show 82 cities

Maine

Show 1 cities

What affects the cost of paving

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size and thickness of the area
  • Removal of the old surface
  • Excavation and base preparation
  • Finish, colour or pattern
  • Access for equipment and trucks
  • Steps, curves, drains or retaining edges

How to compare paving contractors before you hire

  • Choose a contractor who explains how they'll prepare the base, since most concrete and interlock problems start underneath.
  • Ask how they'll slope the surface so water drains away from the house.
  • Get a written quote that covers excavation, base material, reinforcement, finish and removal of the old surface.
  • Look at jobs they finished a few seasons ago to see how they've held up through freeze and thaw.
  • Ask whether they'll call to have underground utilities located before digging.

Questions to ask paving contractors before you hire

  • How deep will you excavate, and what base will you put down?
  • Will you use reinforcement, and what kind?
  • How will you make sure water drains away from the house?
  • Does this work need a permit from my municipality?
  • How soon can the surface be walked on or driven on after it's done?
  • What warranty do you offer for cracking, settling or heaving?

When to call a pro for paving

  • Cracks that are widening or slabs that have sunk or lifted
  • Water pooling against the foundation after rain
  • Trip hazards on steps, walkways or driveways

Paving permits and local rules

Some paving work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get paving quotes?

Tell us about your paving project.

Do you offer paving services?

Join LokalMatch to get matched with homeowners in the areas you serve.