Grading

Grading near you

Grading is water management done with dirt. Almost every wet basement, undermined patio, saturated crawl space and drowned planting bed traces back to the shape of the ground rather than to a product failure, and reshaping that ground is usually cheaper and more durable than the waterproofing people buy instead. The goal is simple to state and easy to get wrong: move surface water away from the house and off the property in a controlled path that does not simply make it your neighbor's problem.

Tell us about your grading project and we’ll help you find local grading contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

American building codes are specific about the slope near a house. The Seattle Residential Code, adopting the model residential code language used across the country, requires that surface drainage shall be diverted to a storm sewer conveyance or other approved point of collection that does not create a hazard, that lots shall be graded to drain surface water away from foundation walls, and that the grade shall fall not fewer than 6 inches within the first 10 feet. Where lot lines, walls, slopes or other physical barriers prohibit that fall, drains or swales shall be constructed to ensure drainage away from the structure, and impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building.

That one paragraph explains most of what a good grading contractor is doing, and most of what a bad one is not.

Rough grading, finish grading, swales and drains

Grading is a family of jobs and the word alone tells a contractor nothing. Name which one you need and quotes start to converge.

  • Rough grading: reshaping the subgrade with machinery to establish the slopes and elevations the rest of the site will be built on.
  • Finish grading: the final shaping and raking before sod, seed or planting, which is where a lawn's low spots are made or avoided.
  • Corrective regrading around a foundation, which means rebuilding positive fall away from the walls where soil has settled or been built up.
  • Swales: shallow shaped channels that carry surface water along a deliberate route rather than letting it choose its own.
  • Subsurface drains, including a perimeter footing drain or a French drain, used where surface shaping alone cannot solve the problem.
  • Dry wells and infiltration areas, which give roof and surface water somewhere to soak in instead of running across the yard.
  • Downspout extensions and buried leaders, the cheapest fix on this list and the one skipped most often.
  • Retaining walls and terracing where the required fall cannot be achieved with slope alone.

The slope codes expect around a house

The code language quoted above is worth reading as three separate instructions, because contractors routinely satisfy one and ignore the others. The first is that the lot must be graded to drain surface water away from foundation walls, with the grade falling not fewer than 6 inches within the first 10 feet. That is a measurable target, and it is the one to check with a level and a tape after the crew has gone, not a matter of opinion about whether the ground looks right.

The second is the exception, which matters on tight urban lots more than anywhere else: where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains or swales shall be constructed to ensure drainage away from the structure. In other words, the impossibility of the slope is not permission to leave the water there; it is a requirement to move it another way. A contractor who tells you the lot is too tight and proposes nothing further has answered only half the question.

The third is about hard surfaces: impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building. A patio, walkway or driveway slab abutting the house is part of the drainage system whether anyone designed it that way or not, and a flat or back-pitched one puts water directly against the wall. Where a paving job and a grading job are being done at once, this is the number that should appear in both scopes.

When moving dirt needs a permit

Grading permits are local and the thresholds vary enough that guessing is useless. Seattle requires a grading permit to excavate, move, or add soil if the combined volume of material is more than 500 cubic yards, to disturb land in an area that is 5,000 square feet or larger, or to add or replace 750 square feet or more of hard surfaces, and drops the trigger to 25 cubic yards of disturbance in riparian corridors, wetlands, steep slopes and other environmentally critical areas, where topographic surveys and geotechnical reports can also be required.

Nashville draws its line elsewhere: a permit is not required where the activity does not involve more than 100 cubic yards of material being removed from, deposited on, or disturbed, and it exempts grading performed as a maintenance measure or for landscaping on existing developed lots where disturbance stays under 10,000 square feet and grade changes do not exceed 18 inches. Even exempt work, Nashville states, must comply with all stormwater regulations including erosion and sediment control guidelines, with stabilization measures applied to denuded areas within 15 days of disturbance, and the city can revoke an exemption if an activity violates those provisions.

Large projects add a federal permit. EPA states that a Clean Water Act permit is required for stormwater discharges from any construction activity disturbing 1 acre or more of land, or less than 1 acre where it is part of a common plan of development or sale that will ultimately disturb 1 or more acres, and that operators must design, install, and maintain effective erosion and sediment controls and pollution prevention measures to minimize the discharge of pollutants, and stabilize disturbed areas immediately when construction has ceased and will not resume for more than 14 days.

How a regrading job actually runs

A grading contractor worth hiring starts by watching water rather than by pricing dirt. That means looking at the property during or shortly after real rain if possible, or at minimum reading the evidence: staining on the foundation, mulch washed into paths, moss on the north side, silt fans at the low points, and where downspouts discharge. Elevations get shot with a level or laser so the existing fall is a number instead of an impression, and the outfall is identified: the place water is actually allowed to go, whether that is a street, a storm inlet, a swale, a dry well or a low area on your own land.

The work then runs in a predictable order: protect what stays, strip and set aside topsoil, cut and fill the subgrade to the designed elevations, compact fill in layers rather than dumping and shaping it, install any swales, drains or downspout leaders while the ground is open, replace topsoil, finish grade, and stabilize the disturbed surface promptly with seed, sod or mulch so the first storm does not wash the work into the street.

The check at the end is yours to make. Measure the fall from the foundation at several points around the house, look at where the downspouts now discharge and how far from the wall, and confirm the finished soil level sits well below siding, trim, weep screeds and any wood. A yard can be beautifully graded and still be wrong if the soil has been brought up against the building.

Why water still reaches your basement after regrading

  • Downspouts still discharging at the foundation, which puts a roof's worth of water exactly where the grading was meant to keep it from.
  • Fill placed loosely and not compacted in layers, so it settles over the first year and quietly reverses the slope back toward the house.
  • Topsoil brought up against siding, trim or a weep screed, which solves the slope and creates a rot and pest problem instead.
  • A patio or walkway left flat or pitched back toward the wall, defeating the grading it sits next to.
  • A swale built with a low spot in it, so water collects partway along instead of moving to the outfall.
  • Water routed to a discharge point that cannot accept it, producing a permanent wet area a short distance from the original one.
  • Window wells and stairwells left below grade with no drain, which collect everything the new slope delivers to them.
  • A drainage problem that is actually subsurface, where groundwater or a spring means surface shaping alone was never going to be the answer.

811, buried utilities and heavy equipment in a yard

Regrading disturbs the top of exactly the zone where shallow utilities live: irrigation mains, low-voltage lighting, gas service, cable and sometimes a shallow water line. The call before you dig is not optional because the work is landscaping. California's law requires an excavator to delineate the area to be excavated before notifying the regional notification center, then to notify at least two working days and not more than 14 calendar days before beginning that excavation, and prohibits starting until the operators have met their marking obligations. Where the work is within 10 feet of a high-priority subsurface installation, the excavator must complete an onsite meeting with the operator first, and records of notifications must be kept for at least three years. State notice periods differ; the duty does not.

Machinery in a residential yard carries its own risks that have nothing to do with utilities. Skid steers and mini excavators on slopes, spoil piles stacked where they can slump, and soft ground after rain are the ordinary hazards, and a competent contractor plans access, storage and haul routes before the first bucket. Ask where equipment will travel, what protects the driveway and the existing lawn, where soil will be stockpiled and for how long, and what the plan is if it rains mid-job with the site stripped bare.

Your neighbor's yard is not a drainage solution

The fastest way to turn a grading project into a dispute is to solve your water problem by moving it across a property line. Codes address this directly. The Seattle Residential Code requires that adjoining public and private property be protected from damage during construction, that provisions be made to control water runoff and erosion during construction or demolition activities, and that where the existing grade of a site is altered by filling, excavating, dredging or moving of earth materials, the owner shall protect all adjoining property during construction from encroachment or collapse by sloping the sides of the temporary grading at a slope that is safe and not more than one horizontal to one vertical, with permanent grading sloped not steeper than two horizontal to one vertical, unless the building official approves a steeper design by an experienced geotechnical engineer.

Beyond the code there is a civil question that varies by state, and a practical one that does not: a discharge onto a neighbor's land tends to be discovered, and it tends to be remembered. If the only viable outfall runs toward another property, raise it with the neighbor before the work rather than after, and get the route and the receiving point named in the scope. Easements, drainage covenants and shared swales recorded on a plat can also dictate where water is permitted to go, and none of those show up when you look at the yard.

What moves a grading quote, and how LokalMatch fits in

Earthwork prices follow volume, access and disposal far more than yard size. The drivers are how much soil has to be cut, filled or brought in, whether excess material can stay on site or must be hauled away, how equipment reaches the work and what it has to be protected from on the way, soil conditions such as rock, saturation or expansive clay, the length and depth of any drains or swales, whether downspout leaders are buried, whether a permit, an erosion control plan or a geotechnical report is required, and what stabilization is included at the end. Ask for the elevations, the drain lengths and the restoration to be listed separately.

LokalMatch is where the search starts, not where the dirt moves. You describe the problem once: where water stands, what the house is doing about it now, how close the property lines are, how machinery would get in and whether you already know of a permit requirement. Grading and drainage contractors serving your area receive the request, and the ones interested contact you. Pros pay for the requests they receive; homeowners pay nothing to use it. LokalMatch does not perform grading, does not set prices and does not vet, rank or recommend any contractor, so confirming insurance, permits, the locate ticket and the written scope is your side of the job.

Grading: frequently asked questions

How much should the ground slope away from my foundation?

The residential code standard adopted around the country, as printed in the Seattle Residential Code, is that lots shall be graded to drain surface water away from foundation walls and the grade shall fall not fewer than 6 inches within the first 10 feet. Impervious surfaces within 10 feet of the foundation shall be sloped not less than 2 percent away from the building. Measure it after the work is done rather than taking the crew's word for it.

My lot is too tight to get that much fall. What then?

The code anticipates this. Where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains or swales shall be constructed to ensure drainage away from the structure. That means the answer is a shaped channel, a drain line or a combination that moves the water another way, not an acceptance that it sits against the house. A contractor who says nothing can be done has stopped at the first half of the requirement.

Do I need a permit to regrade my own yard?

It depends on your city and on how much soil moves. Seattle requires a grading permit above 500 cubic yards moved, 5,000 square feet disturbed, or 750 square feet of hard surface added or replaced, with a 25-cubic-yard trigger in environmentally critical areas. Nashville exempts work under 100 cubic yards, and exempts landscaping on developed lots under 10,000 square feet with grade changes of 18 inches or less, but still requires erosion and sediment control. Ask your own jurisdiction.

Is regrading a substitute for waterproofing the basement?

It is usually the first step rather than a substitute, and it is often the cheaper half of the answer. Surface water arriving at the wall is what most exterior systems are fighting, so removing that load frequently reduces or resolves the problem on its own. Where the source is groundwater, a high water table or a spring, surface shaping alone will not fix it, and a subsurface drain or an interior system is the right conversation.

Can my contractor drain water onto the neighboring lot?

Do not assume so. The Seattle Residential Code requires that adjoining public and private property be protected from damage and that provisions be made to control water runoff and erosion when a site's grade is altered, with temporary grading sloped no steeper than one horizontal to one vertical and permanent grading no steeper than two horizontal to one vertical unless a geotechnical design is approved. Recorded easements and drainage covenants can also govern. Settle the outfall before the work, in writing.

Why did my regraded yard settle back within a year?

Fill that was placed loosely and shaped rather than compacted in layers will consolidate under its own weight and under rain, and the slope quietly flattens or reverses. Ask for compaction in layers to be written into the scope. The other common cause is that the topsoil layer was thin over uncompacted fill, so what looked like a finished grade was really a skin over material still settling underneath.

Sources

  1. 2018 Seattle Residential Code, Chapter 4 Foundations (R401.3 Drainage, R401.5 Protection of Adjoining Property)
  2. Seattle Department of Construction and Inspections: Grading Permit
  3. Metro Nashville Water Services: Who Needs a Grading Permit
  4. EPA NPDES: Stormwater Discharges from Construction Activities
  5. California Government Code Section 4216.2: Excavator Notice Before Digging

Written by the LokalMatch editorial team. Last reviewed September 21, 2026. How we write and check our guides

Find grading contractors by city

Alaska

Show 1 cities

California

Show 186 cities

Delaware

Show 1 cities

Florida

Show 82 cities

Maine

Show 1 cities

Texas

Show 79 cities

What affects the cost of grading

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size of the yard and the scope of the design
  • Grading, excavation and drainage work
  • Hardscape materials, such as stone, pavers or wood
  • Plants, sod and soil
  • Access for machinery
  • Removal of old materials, trees or stumps
  • How often visits are scheduled for ongoing services

How to compare grading contractors before you hire

  • Choose a company that does the kind of work you need, since design, lawn care, tree work and hardscaping are different specialties.
  • For big projects, ask for a site plan or drawing before work starts.
  • Ask how they'll handle grading and drainage so water moves away from the house.
  • For tree removal or large pruning, look for a qualified arborist with liability insurance.
  • For ongoing services like lawn care or snow removal, get the visit schedule and what's included in writing.

Questions to ask grading contractors before you hire

  • Can I see a plan or drawing before you start?
  • How will you handle drainage and grading?
  • Will you have underground utilities located before you dig?
  • Does any of this work need a permit, such as for a retaining wall, fence or tree removal?
  • What plants or materials do you recommend for our climate and my yard's sun and shade?
  • Do you guarantee plants or sod, and for what conditions?
  • Can you show me proof of liability insurance?

When to call a pro for grading

  • Water that pools near the house or in the yard after rain
  • A tree that is leaning, cracked or has large dead branches over the house or a driveway
  • A retaining wall that is bulging, leaning or cracking

Grading permits and local rules

Some grading work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get grading quotes?

Tell us about your grading project.

Do you offer grading services?

Join LokalMatch to get matched with homeowners in the areas you serve.