Skip to content
LokalMatch

Concrete Floors

Concrete Floors near you

Interior concrete floors are two very different projects wearing the same name. One is finishing a slab that already exists, usually in a basement, a garage conversion or a slab-on-grade house, and the work is grinding, repairing and sealing what is there. The other is designing concrete as the finished floor of a new space, where the pour, the flatness, the joint layout and the color are decided months before anyone thinks about the surface.

Tell us about your concrete floor project and we’ll help you find local concrete floor contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

In both cases the interesting part of the floor is underneath it. A slab on grade separates the living space from soil, and what sits between the two decides whether the floor is dry and whether soil gas comes in with the moisture. EPA's guidance for radon-resistant construction describes the elements: a 4 inch layer of clean, coarse gravel below the slab, heavy duty plastic sheeting of 6 mil polyethylene or a vapor retarder on top of the gravel to prevent soil gases from entering the house, a 3 inch or 4 inch solid PVC pipe run vertically from the gravel layer through the conditioned space and roof to vent radon, and sealing all openings, cracks and crevices in the concrete foundation floor with polyurethane caulk.

An older slab may have none of that. Finding out what is under yours is the first question, because it determines whether the floor can be sealed, coated or covered at all, and it is much cheaper to answer before the work than after.

Polished, ground and sealed, stained or overlaid

  • Mechanically polished concrete: progressively finer diamond grinding with a chemical densifier, producing a hard surface with no coating to peel.
  • Ground and sealed: a light grind to even the surface followed by a penetrating or film sealer, which is quicker and less exacting than a full polish.
  • Acid-stained concrete: a reaction between the stain and the concrete chemistry that produces variegated color no two slabs repeat exactly.
  • Water-based dyes and stains: a wider and more predictable color range, generally needing a protective sealer over the top.
  • Micro-toppings and cementitious overlays: a thin new surface over a slab that is too damaged or too patched to finish directly.
  • Saw-cut patterns: lines cut into the finished slab to divide a large floor visually and, where they coincide with control joints, to do useful work as well.
  • Exposed aggregate polish: grinding deep enough to reveal the stone, which depends entirely on what aggregate the original mix happened to contain.

What sits under the slab decides what you can do on top

A slab on grade is in permanent contact with damp soil, and without a barrier it behaves like a wick. The NIH flooring bulletin lists installing vapor barriers that block the movement of moisture from the soils below slabs installed on grade among the ways to control slab moisture, and is specific that to be effective, a vapor barrier must be a continuous, impermeable system, installed with sealed joints, and free of damage and penetrations. A sheet torn during the pour, or one that stops short at a footing, is not a vapor barrier.

The same layer does double duty against soil gas. EPA's radon-resistant approach places a 4 inch layer of clean, coarse gravel under the slab as a gas-permeable layer, covers it with 6 mil polyethylene sheeting or a vapor retarder to prevent soil gases from entering the house, runs a 3 inch or 4 inch solid PVC pipe from the gravel up through the building and out at the roof, and seals all openings, cracks and crevices in the concrete foundation floor, including the slab perimeter crack, with polyurethane caulk. A basement floor project is a natural moment to deal with those penetrations, because you can see them.

The bulletin's other levers matter for a new pour: using appropriate concrete mixes with the minimum water necessary for placement, providing sufficient curing time so the water in the mix reacts with the cement and leaves less free internal moisture, completing the building enclosure, operating the HVAC systems, and providing well-designed grading and landscaping that divert surface water and groundwater from slabs.

Cracks, joints and the things a polished floor will show

Concrete cracks, and polishing it does not stop that; it just puts the cracks under a spotlight. A finished concrete floor shows every control joint, every old plumbing patch, every place a wall was moved and every variation in the original aggregate. Some owners like that and deliberately buy the history of the slab; others are genuinely surprised by it. The only way to find out which camp you are in is to have a test patch ground before the whole floor is committed.

Existing joints have to be planned for rather than wished away. A control joint can be filled with a semi-rigid material and polished through, which makes it far less obvious while still letting it work, or it can be treated as a feature and left as a clean line. What does not work is filling a moving crack flush and expecting it to stay that way. Ask what the plan is for each joint and each existing crack, on a drawing, before grinding begins.

Comfort is the other honest caveat. Concrete is hard and reflective, so a large concrete floor is unforgiving underfoot and can make a room live noisily unless rugs, soft furnishings and acoustic treatment are part of the plan.

Concrete floors against wood, tile and resilient flooring

Against wood, concrete wins on moisture tolerance and on wear, and loses on warmth and on sound. A slab that would need a subfloor, a vapor retarder and careful acclimation before hardwood could go down can often simply be ground and sealed, which is why basements and slab-on-grade houses are where finished concrete makes the most sense.

Against tile, the comparison is closer than it looks, because tile is generally going onto the same slab anyway. Concrete removes a layer, a bonding system and a grid of grout joints from the assembly, and with them a common failure point. Tile gives more control over color and pattern and is easier to replace in one spot. If the slab is uneven or heavily patched, tile hides what concrete would display.

Concrete also pairs unusually well with radiant heat, because the mass that makes it cold underfoot in an unheated room is the same mass that stores and radiates warmth evenly when heat is embedded in it. Where an existing slab is being finished, that is worth asking about early, since adding heat afterwards means either a new topping or nothing.

Living with a concrete floor

Maintenance depends on what the surface actually is. A densified and polished slab is maintained mostly by keeping grit off it and washing with a neutral cleaner, with occasional burnishing to restore the sheen. A sealed or coated floor is maintained by protecting the film: no aggressive solvents, no abrasive pads, and prompt attention to spills, since a film can be etched by acids in a way bare polished concrete shrugs off.

Both benefit from mats at exterior doors and felt pads under furniture. Ask at handover which category your floor falls into, what cleaner is approved, and how it gets refreshed in five years, and keep the answer somewhere findable. Stained and dyed floors in particular can be dulled quickly by the wrong cleaner, and the person who installed it will not necessarily be the person who maintains it.

What changes a concrete floor quote, and how LokalMatch fits in

The price follows the condition of the slab and the level of finish, not the square footage alone. The variables are the area and how much of it is open versus cut up by walls and fixtures, the condition of the existing concrete and how much repair and patching it needs, the level of polish or the finish system chosen, whether color is applied and how, joint treatment, removal of old flooring and adhesive, moisture assessment and any mitigation, dust control and how much of the house has to be sealed off, and whether the room can be out of use while it is done. A test patch before committing is usually money well spent.

Finding someone is what LokalMatch is for. Write the job down a single time, covering which room it is, how much floor there is, what covers it today, any history of damp in the slab and the finish you have in mind, and concrete finishing and flooring companies working near you will see it. Whoever wants the work makes contact. Tradespeople are billed for the leads they receive; homeowners never are. LokalMatch itself grinds no floors, quotes no prices and endorses no company, which leaves references, insurance certificates, the moisture results and the written specification for you to check.

Concrete Floors: frequently asked questions

Can any concrete slab be polished?

Not equally well. A slab that is heavily patched, badly cracked, soft at the surface or full of old adhesive will show all of it once ground, and a slab with a moisture problem may not accept a sealer. The aggregate exposed also depends entirely on what the original mix contained, which nobody can promise in advance. Have a test patch ground in an inconspicuous corner before the whole floor is committed.

Are concrete floors cold?

They feel cold in an unheated room, because concrete conducts heat away from a bare foot faster than wood or carpet does. The same mass works in your favor with embedded radiant heat, which concrete distributes very evenly. If the slab already exists and you want heat in it, raise that early: adding heat afterwards usually means a new topping over the slab or accepting the floor as it is.

What is under a basement slab, and does it matter?

It matters a great deal. EPA's radon-resistant construction guidance describes a 4 inch layer of clean, coarse gravel beneath the slab, 6 mil polyethylene sheeting or a vapor retarder on top of it to prevent soil gases from entering the house, and a vent pipe run up through the building. Many older slabs have none of that, which affects both moisture and radon, so it is worth finding out before choosing a finish.

Will sealing the cracks in my basement floor fix a radon problem?

It is part of the answer, not all of it. EPA's guidance is to seal all openings, cracks and crevices in the concrete foundation floor, including the slab perimeter crack, with polyurethane caulk to prevent radon and other soil gases from entering the home, and pairs that with a gas-permeable gravel layer, sheeting and a vent pipe. Test for radon and follow the testing guidance rather than assuming caulk alone has solved it.

Do concrete floors crack after they are finished?

They can, because finishing does not change how a slab behaves. Existing control joints keep moving, and a polished surface makes every line more visible. The workable approaches are filling joints with a semi-rigid material and polishing through them, or treating them as a deliberate feature. Filling a crack that is still moving and expecting it to stay closed is the approach that does not work.

Sources

  1. EPA: Radon-Resistant Construction Basics and Techniques
  2. NIH Office of Research Facilities Technical Bulletin 108: Vapor Pressure and Flooring Installation
  3. FHWA: Guidelines for Detection, Analysis, and Treatment of Materials-Related Distress in Concrete Pavements (FHWA-RD-01-163)

Written by the LokalMatch editorial team. Last reviewed September 21, 2026. How we write and check our guides

Find concrete floor contractors by city

Alaska

Show 1 cities

California

Show 186 cities

Florida

Show 82 cities

Maine

Show 1 cities

Texas

Show 79 cities

What affects the cost of concrete floor

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Floor area and the number of rooms
  • Type and grade of flooring
  • Removal of the existing floor
  • Subfloor repairs or levelling
  • Stairs, angles and custom cuts
  • Trim, transitions and baseboards

How to compare concrete floor contractors before you hire

  • Choose an installer who works regularly with the type of flooring you want, since hardwood, tile, vinyl and carpet each need different skills.
  • Ask them to check the subfloor and moisture levels before giving a final price.
  • Get a written quote that covers removal of the old floor, subfloor prep, underlay, trim and transitions.
  • Ask whether you or the installer will supply the flooring, and who is responsible for ordering extra for waste.
  • Look at recent work in person or in photos, paying attention to seams, edges and transitions.

Questions to ask concrete floor contractors before you hire

  • Will you remove and dispose of the old flooring?
  • How will you check and prepare the subfloor?
  • Is my space suitable for this type of flooring, especially in a basement, kitchen or bathroom?
  • Are baseboards, transitions and stair nosings included?
  • Will you move the furniture and appliances, or should I?
  • Does your workmanship warranty cover problems like lifting, gaps or cracked tiles?

Concrete floor permits and local rules

Some concrete floor work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get concrete floor quotes?

Tell us about your concrete floor project.

Do you offer concrete floor services?

Join LokalMatch to get matched with homeowners in the areas you serve.