Skip to content
LokalMatch

Concrete Driveways

Concrete Driveways near you

A driveway is the only flatwork at a house that has to carry a vehicle, and that single fact changes everything upstream of the finish. It sets the thickness, the jointing pattern, the compaction of what goes underneath, and how close to the edge a wheel can safely track. A patio slab poured to driveway dimensions is over-built; a driveway poured to patio dimensions cracks along the wheel paths inside a few winters.

Tell us about your concrete driveway project and we’ll help you find local concrete contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

Part of your driveway is usually not yours. The apron between the sidewalk and the curb generally sits in the public right of way, and cities specify and inspect it. Berkeley, California, is a typical example: construction between the lip of the gutter and the front property line is done under city permit and inspection, all driveway approaches shall be 6 inches minimum thickness of concrete, and sidewalks have a minimum thickness of three and a half inches, so the slab steps up in thickness exactly where the wheels cross it.

The other two things to settle before anyone breaks ground are what is buried under the route and what the new surface does to runoff. Calling 811 is a legal requirement in most states, and many cities now count a new driveway against a property's allowance of impervious surface. Both are cheap questions in advance and expensive ones afterwards.

How a concrete driveway is built, from subgrade to broom finish

Almost all of the performance of a driveway is decided before the truck arrives. The existing surface and any soft material come out, the subgrade is proof-rolled and brought to a firm, even grade, and soft spots are dug out and replaced with compacted aggregate rather than filled with extra concrete. Berkeley's specification puts the general rule in one line: subgrades shall be firm to displacement and of an even grade, and soft spots shall be removed and backfilled with aggregate baserock.

Forms then set the line and the fall, reinforcement goes in where the design calls for it, and the concrete is placed, screeded, floated and jointed. The finish matters for traction: Berkeley requires sidewalks and driveways to be finished with a wood float followed by a medium soft broom stroke, and prohibits a steel trowel or slick finish outright. Curing is the last controlled step and the one most often shortchanged; where a membrane compound is used, that city requires it to conform to ASTM C309 and to be sprayed on within one hour after finishing.

Thickness, joints and the apron your city actually controls

Jointing is not decoration; it is where you decide the concrete will crack. Berkeley requires control joints approximately one fifth of the thickness of the concrete in depth, placed transversely about every 10 to 12 feet in sidewalks, at the line between sidewalk and driveway where the thickness changes, and at projecting corners of existing work where contraction cracks are likely to occur. Longitudinal joints are required in driveways in alignment with the front and back edges of the sidewalk. A driveway laid as one unbroken sheet will still crack; it just gets to choose where.

Thickness follows load. The same city sets driveway approaches at 6 inches minimum and ordinary sidewalk at three and a half inches, and where pavers are used it requires a 3 inch concrete base in the sidewalk but a 6 inch concrete base in driveways. Your own city's standard drawing is the number that governs the apron in front of your house, and it is worth having in hand before you compare bids, because a contractor pricing four inches where the city requires six is not cheaper, only wrong.

Air-entrained concrete, and why the mix in Buffalo is not the mix in Phoenix

Air entrainment is the single biggest regional difference in residential concrete in the United States, and it is invisible once the slab is poured. FHWA describes air-entraining admixtures as facilitating the development of a system of microscopic air bubbles within concrete during mixing, and says they increase the freeze-thaw durability of concrete, increase resistance to scaling caused by deicing chemicals, and improve workability. Entrained bubbles are deliberately small, between four ten-thousandths and four hundredths of an inch across, which is what gives the freezing water somewhere close to go.

It is not free. FHWA also notes that air entrainment will reduce concrete strength, and gives the working rule that a 1 percent increase in the concrete air content will decrease the 28-day compressive strength by about 3 to 5 percent. In the frost belt the durability is worth the strength, and a driveway without it is a slab that will scale. In the desert Southwest, where freezing is rare, the trade-off runs the other way. Ask what air content is specified for your delivery and why, and ask whether it will be verified on site.

The 811 call, the right-of-way permit and new impervious surface

Before excavation, call 811. Indiana's utility consumer counselor states that Indiana law requires all property owners to make that call before doing any digging on their land, at least two business days in advance, and that the service is free. Oregon's Public Utility Commission tells excavators to call at least two business days before starting any digging project, explains that the state notification center coordinates with utility providers to mark the location of electric, natural gas, communications and water utilities, and takes enforcement actions against excavators who do not use the one-call system. Notice periods are set state by state, so confirm yours.

The apron usually needs a permit of its own. Where the work sits between the gutter and the front property line, cities treat it as work in the public right of way, done under permit and inspection to the city's own specification, and Berkeley goes as far as making the permittee responsible for replacing work that fails within six months where the failure results from non-compliance with those specifications.

Finally, adding hard surface can trigger stormwater rules. Raleigh, North Carolina, counts driveways, patios, decks, roofs and parking areas as impervious surface, treats asphalt and concrete as 100 percent impervious, applies maximum impervious limitations to residential lots and requires an as-built impervious survey when a proposal comes within 10 percent or 400 square feet, whichever is greater, of the maximum allowed. EPA's own guidance points the other direction, noting that pervious concrete, pervious asphalt, interlocking pavers and plastic grid pavers allow rain and snowmelt to seep through the surface. Ask your city which of those it counts and how.

What actually goes wrong with concrete driveways

  • Cracks running along the wheel paths, usually a thickness or compaction problem rather than a concrete problem.
  • A cracked or broken edge where vehicles clip the unsupported side, often because the soil beside the slab has eroded away.
  • Scaling across the whole surface after a few winters, pointing at a mix without adequate entrained air for the climate.
  • A settled apron at the curb, where trench backfill under the right-of-way portion was never compacted properly.
  • Puddles that sit near the garage apron long after rain, sending meltwater back toward the door instead of out to the street.
  • Joints that have lost their sealant, letting water and grit reach the subbase through the openings you deliberately created.
  • Rust staining and delamination over reinforcement placed too close to the surface.

Sealing, joints and winter habits on a driveway

The two maintenance jobs that pay for themselves are keeping the joints sealed and keeping the drive from staying saturated. Grit and water in an open joint work the subbase loose from below, and a slab that goes into a freezing night soaked is the one that scales. Extending downspouts past the edge, clearing the low spot that holds meltwater and resealing joints on a schedule do more for a driveway than any topical product.

Sealers are useful and oversold. They reduce absorption and make stains easier to lift, but they do not add strength, do not fix drainage and do not substitute for entrained air in a cold climate. Whatever you use, follow the label for surface temperature and cure time, and reapply on the manufacturer's schedule rather than when the driveway stops looking new.

What changes a driveway quote, and how LokalMatch fits in

Driveway bids separate on what is underneath and on what the city requires, not on the finish photographs. The variables are the area and shape, the specified thickness and whether reinforcement is included, removal and disposal of an existing surface, subgrade correction and imported base, the air content and mix specified for your climate, the jointing plan, the apron and whatever standard your city applies to it, permit and inspection handling, site access for a truck and a pump, and any drainage or stormwater work the project triggers. Ask each contractor to show thickness, base depth and joint layout on the same sketch.

The searching part happens on LokalMatch. Lay the job out one time, covering the rough size, what is on the ground now, how steep the approach is, whether the apron at the street is in scope and the finish you have in mind. Concrete companies working in your area see it, and the ones who want the job get in touch with you. Contractors are charged for the leads; using the site costs a homeowner nothing. LokalMatch does not pour driveways, quote them or rank the firms that do, which leaves the license check, the certificate of insurance and the permit question in your hands.

Concrete Driveways: frequently asked questions

How thick should a concrete driveway be?

Thicker than a sidewalk, and your city sets the number for the part in the right of way. Berkeley, as one example, requires all driveway approaches to be 6 inches minimum thickness of concrete while ordinary sidewalk has a minimum thickness of three and a half inches, and requires a 6 inch concrete base under pavers in driveways against 3 inches in sidewalks. Ask your public works department for the standard detail that applies to your address.

Do I need a permit to replace my own driveway?

Often for part of it. The portion between the gutter and the front property line is usually public right of way, and cities require it to be built under permit and inspection to their own specification. Berkeley additionally makes the permittee responsible for replacing work that fails within six months where the failure results from non-compliance with its specifications. Private portions may need a separate zoning or stormwater review.

Do I really have to call 811 for a driveway?

Yes, and in most states it is the law. Indiana states that its law requires all property owners to call before any digging on their land, at least two business days in advance, and that the service is free. Oregon's Public Utility Commission asks for at least two business days notice before starting any digging project and enforces its rules against excavators who skip the one-call system. Your state's notice period may differ, so check it.

Why do driveways crack in straight lines?

Because someone chose where they would crack. Control joints are cut or tooled so shrinkage relieves itself along a planned line instead of wandering. Berkeley requires them at approximately one fifth the thickness of the concrete in depth, transversely about every 10 to 12 feet in sidewalks, where the slab thickness changes between sidewalk and driveway, and at projecting corners where contraction cracks are likely. A crack on a joint is the system working.

Will a new driveway affect my stormwater bill or approval?

It can. Raleigh counts driveways, patios, roofs and parking areas as impervious surface, treats concrete and asphalt as 100 percent impervious, applies maximum impervious limitations to residential lots, and requires an as-built impervious survey when a proposal comes within 10 percent or 400 square feet of that maximum. Other cities set their own thresholds. Ask before designing the width.

Does concrete need air entrainment where I live?

It depends on whether your concrete freezes while wet. FHWA says air-entraining admixtures increase freeze-thaw durability and resistance to scaling caused by deicing chemicals, but also that air entrainment reduces strength, with roughly a 3 to 5 percent drop in 28-day compressive strength for each 1 percent of added air. In freezing regions the durability is the priority; in consistently warm regions the calculation changes. Ask what is specified and why.

Sources

  1. City of Berkeley Public Works: Specifications for Curbs, Gutters, Sidewalks and Driveway Approaches (Form 316)
  2. FHWA Mobile Concrete Technology Center: Air-Entraining Admixtures for Concrete (FHWA-HIF-20-085)
  3. Indiana Office of Utility Consumer Counselor: 811 Before You Dig
  4. Oregon Public Utility Commission: Call Before You Dig
  5. City of Raleigh: Residential Stormwater Frequently Asked Questions
  6. EPA Soak Up the Rain: Permeable Pavement

Written by the LokalMatch editorial team. Last reviewed September 21, 2026. How we write and check our guides

Find concrete contractors by city

California

Show 186 cities

Florida

Show 82 cities

Maine

Show 1 cities

Texas

Show 79 cities

What affects the cost of concrete driveway

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size and thickness of the area
  • Removal of the old surface
  • Excavation and base preparation
  • Finish, colour or pattern
  • Access for equipment and trucks
  • Steps, curves, drains or retaining edges

How to compare concrete contractors before you hire

  • Choose a contractor who explains how they'll prepare the base, since most concrete and interlock problems start underneath.
  • Ask how they'll slope the surface so water drains away from the house.
  • Get a written quote that covers excavation, base material, reinforcement, finish and removal of the old surface.
  • Look at jobs they finished a few seasons ago to see how they've held up through freeze and thaw.
  • Ask whether they'll call to have underground utilities located before digging.

Questions to ask concrete contractors before you hire

  • How deep will you excavate, and what base will you put down?
  • Will you use reinforcement, and what kind?
  • How will you make sure water drains away from the house?
  • Does this work need a permit from my municipality?
  • How soon can the surface be walked on or driven on after it's done?
  • What warranty do you offer for cracking, settling or heaving?

When to call a pro for concrete driveway

  • Cracks that are widening or slabs that have sunk or lifted
  • Water pooling against the foundation after rain
  • Trip hazards on steps, walkways or driveways

Concrete driveway permits and local rules

Some concrete driveway work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get concrete driveway quotes?

Tell us about your concrete driveway project.

Do you offer concrete driveway services?

Join LokalMatch to get matched with homeowners in the areas you serve.