Excavation near you

Excavation in a domestic setting covers everything from a footing trench for a garden wall to digging out a whole plot for a basement extension. What it all has in common is that the ground is being opened, and two hazards arrive with that: what is already buried in it, and the fact that the sides of any hole want to come in. Neither is dramatic on a small job, which is exactly why small jobs produce a steady stream of service strikes and collapses.

Tell us about your excavation project and we’ll help you find local excavation contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

The other party to a domestic excavation is often the neighbour. In England and Wales, a statute gives them a formal right to be told before a dig that goes deeper than their foundations happens close to their building, and the notice period is long enough that it has to be planned for rather than remembered on the day.

None of this makes excavation a specialist affair beyond the reach of ordinary contractors. It does mean that a quotation that mentions neither buried services nor how the sides of the dig will be supported has left out the two things that could actually go wrong, and that a homeowner who asks about both has done something useful before the first spade goes in.

What a domestic excavation job usually is

  • Footing and foundation trenches for extensions, garden walls, garden buildings and retaining structures.
  • Service trenches for water, power, gas or drainage running out to an outbuilding or a garden kitchen.
  • Drainage excavation, which is shallower but longer, and which crosses more of the garden than anything else on this list.
  • Pool and sunken terrace digs, where the volume of spoil rather than the depth is what shapes the job.
  • Lowering ground or forming a cut into a slope, which turns into a retaining job as soon as the face has to stand.
  • Stump and root removal, where the hazard is what the roots are wrapped around rather than the depth.
  • Site clearance and dig-out before hard landscaping, which is the most common domestic excavation and the least often planned as one.
  • Exploratory holes dug deliberately to find out what is down there before a design is finalised, which is the cheapest excavation you will ever pay for.

Buried services: the three things HSG47 says have to happen first

The reference document is HSG47, Avoiding danger from underground services, published by the Health and Safety Executive in its third edition in 2014. It addresses everyone involved in commissioning, planning, managing and carrying out work on or near underground services, along with the owners and operators of those services, and it sets out the hazards of working near buried services and how to reduce both the direct risk to people and the indirect risk that comes from damaging a service.

Its structure is the useful part for a homeowner, because it reduces to three elements that should be visible in any competent contractor's method. Plan the work, which means obtaining the service owners' plans before anyone arrives rather than looking for them afterwards. Locate and identify buried services, which means using detection equipment on site and marking what is found, not treating the plans as a map of reality. And excavate safely, which means digging in a way that assumes something is there until it is proved otherwise. HSE's construction guidance makes the consequences plain: many serious accidents have occurred when buried services have been damaged during excavation work, contact with electricity cables can cause explosions and burns, and damaged gas pipes can lead to fire.

In a garden this matters more than people assume, because domestic plots accumulate unrecorded services: a cable to a shed run in by a previous owner at whatever depth the trench happened to be, a water pipe to an old greenhouse, a gas supply crossing to a garage. None of those appears on a utility plan. The practical questions to ask a contractor are whether they will obtain plans before starting, what locating equipment they use, and how they intend to work in the areas where something has been detected.

The neighbour you have to write to: section 6 of the Party Wall etc. Act 1996

In England and Wales, a dig close to a neighbour's building and deeper than its foundations triggers a statutory notice. Section 6 of the Party Wall etc. Act 1996 catches excavation, or excavation for and erection of a building or structure, within three metres measured horizontally from any part of an adjoining owner's building or structure where the work will go to a lower level than the bottom of their foundations, and again within six metres where the work would meet a plane drawn downwards at forty-five degrees to the horizontal from the bottom of those foundations.

What the notice has to contain is worth knowing before you draft one, because an incomplete notice is not a notice. The section requires the building owner to indicate their proposals and to state whether they propose to underpin or otherwise strengthen or safeguard the foundations of the adjoining owner's building or structure, and to accompany the notice with plans and sections showing the site and depth of any excavation and the position of any proposed building or structure. It must be served at least one month before beginning to excavate.

The timetable then works against silence. If the adjoining owner does not serve a notice indicating consent within the period of fourteen days beginning with the day the notice was served, they are deemed to have dissented and a dispute is deemed to have arisen — at which point surveyors are appointed and the matter is settled by an award. Neighbours often do nothing rather than object, so a homeowner planning on a friendly conversation should budget for the surveyor route anyway. The Act does not extend to Scotland or Northern Ireland, where the relationship with an adjoining owner is governed differently, so take advice locally rather than serving an English notice.

Why an excavation is inspected at the start of every shift

HSE's position on collapse is uncompromising: no ground can be relied upon to stand unsupported in all circumstances. That is why the decision about temporary support — trench sheets, props, boxes or battering the sides back to a safe angle — is made before digging starts, and why the equipment is expected to be on site before the machine begins rather than fetched when the sides start to move. A collapse does not need a deep trench to be fatal; a cubic metre of soil is heavy enough.

Regulation 22 of the Construction (Design and Management) Regulations 2015 puts that into law. It requires that all practicable steps be taken to prevent danger to any person, including ensuring that no excavation or part of an excavation collapses, with support or battering provided where necessary. It also requires inspection by a competent person at the start of every shift, after any event likely to have affected stability, and after any unintended fall of material, with written reports recording the hazards identified and the action taken.

The other hazards on a domestic site are the mundane ones. HSE expects substantial barriers at excavation edges — guard rails with toe boards, or trench box systems standing proud of ground level — to stop people falling in, and warns about material falling in from spoil heaps and plant working too close to an open edge. In a small garden, where the excavation, the spoil and the route to the skip are all within a few metres of each other, these are not theoretical constraints but the reason the job takes longer than the volume suggests.

How a dig should be run, from plans to backfill

  • Obtain the utility plans and walk the site with them, noting everything visible: covers, meters, stopcocks, cables into outbuildings.
  • Scan the area with locating equipment and mark what is found on the ground, not only on paper.
  • Serve any party wall notice in good time, allowing for the one-month period and the fourteen-day response window.
  • Agree the support method and have the materials on site before the excavation begins.
  • Dig cautiously in the marked areas, using hand digging or vacuum methods where a service is expected.
  • Barrier the edges as the hole opens, and keep spoil heaps back from the edge rather than beside it.
  • Have a competent person inspect at the start of each shift and record it, along with any event that could affect stability.
  • Backfill and compact in layers, reinstate the surface, and record where anything new was buried before the ground closes over it.

Spoil: the part of the job nobody pictures

  • Excavated material bulks up once loose, so the heap is always bigger than the hole and the garden is smaller than you thought.
  • Agree at quotation stage whether spoil is being carted away or reused on site, because the two prices are not comparable.
  • Ask who is taking it, under what registration, and where it is going, and keep whatever paperwork comes back.
  • Find out whether a skip or a grab lorry will stand on the road rather than the drive, and who is arranging any permission that needs.
  • Keep topsoil separate from subsoil while it is stockpiled, since the two are worth very different amounts to the finished garden.
  • Do not stockpile against a boundary wall or a retaining structure, which is not designed to take the surcharge.
  • Protect the route used for barrowing or plant, and agree in advance who reinstates it.

What drives an excavation quote, and how LokalMatch fits in

Depth, access and disposal set the figure. The variables are the volume to be removed and how far it has to be carried before it reaches a vehicle, whether a machine can get to the dig or the work is by hand, the ground conditions and whether obstructions such as old foundations or hardcore are likely, the depth and therefore the support arrangements required, whether buried services are known to cross the area, whether a party wall notice and possibly a surveyor's award are in the programme, and how much reinstatement follows. Two contractors can quote very different figures for the same hole because one has assumed clean ground and easy access and the other has not.

LokalMatch is the introduction step. Describe the dig once with your postcode — roughly how deep and how big, what it is for, how a machine would reach it and how close it is to a neighbour's building — and excavation contractors and groundworkers covering your area contact you. The homeowner pays nothing; the professionals pay for the requests they receive. LokalMatch carries out no work, sets no prices and does not vet, rank or recommend anyone who responds, so checking insurance, asking how buried services will be located and confirming who is serving any party wall notice is your part of it.

Excavation: frequently asked questions

Do I have to tell my neighbour before I dig near their house?

In England and Wales, yes, where section 6 of the Party Wall etc. Act 1996 applies. It catches excavation within three metres of any part of an adjoining owner's building or structure where the work goes to a lower level than the bottom of their foundations, and within six metres where the work would meet a plane drawn downwards at forty-five degrees from the bottom of those foundations. Notice must be served at least one month beforehand. The Act does not extend to Scotland or Northern Ireland.

What has to be in a party wall excavation notice?

Section 6 requires the notice to indicate the proposals and to state whether the building owner proposes to underpin or otherwise strengthen or safeguard the foundations of the adjoining owner's building or structure. It must be accompanied by plans and sections showing the site and depth of any excavation and the position of any proposed building or structure. A vague letter is not a valid notice, which is why people often have the drawings prepared before they write to the neighbour rather than after.

My neighbour has not replied to the notice. Can I start?

Not on the basis of silence, and silence is not consent. Section 6 provides that if an owner served with a notice does not serve a notice indicating consent within the period of fourteen days beginning with the day the notice was served, they are deemed to have dissented and a dispute is deemed to have arisen. That takes the matter into the surveyor and award process. Because neighbours frequently do nothing rather than object, it is sensible to plan the programme and the budget on the assumption that this is where it goes.

How should a contractor find buried cables and pipes before digging?

By doing the three things HSG47 sets out. Plan the work, which means obtaining service owners' plans before the job starts. Locate and identify buried services on site with detection equipment, marking what is found rather than relying on the plans alone. Then excavate safely, working cautiously and by hand where something is expected. HSE's third edition of HSG47 was published in 2014, and its construction guidance is explicit that many serious accidents have happened when buried services were damaged, with electricity cables causing explosions and burns and damaged gas pipes causing fire.

Does a shallow trench really need support?

It needs a decision, which is not the same as always needing sheets and props. HSE's position is that no ground can be relied upon to stand unsupported in all circumstances, and regulation 22 of the Construction (Design and Management) Regulations 2015 requires all practicable steps to be taken so that no excavation or part of one collapses, with support or battering where necessary. The regulation also requires inspection by a competent person at the start of each shift and after any event affecting stability, with written reports. A contractor who has thought about it can tell you which approach they are using and why.

Who is responsible for the soil that comes out?

Whoever the contract says, which is why it should say. Excavated material bulks up once it is loose, so the heap is always larger than the hole, and a domestic garden fills quickly. Settle before work starts whether spoil is being reused on site or carted away, who is taking it and where it is going, and keep whatever documentation comes back. Also establish whether a skip or grab lorry will stand on the public road rather than the drive, and who is arranging any permission needed for that.

Sources

  1. Party Wall etc. Act 1996, section 6 (adjacent excavation and construction: three metres, six metres, one month's notice, fourteen-day deemed dissent)
  2. GOV.UK: the Party Wall etc. Act 1996 explanatory booklet
  3. HSE: HSG47 Avoiding danger from underground services, third edition 2014 (plan the work, locate and identify, excavate safely)
  4. HSE: excavations in construction (no ground can be relied upon to stand unsupported; edge protection; inspection by a competent person)
  5. The Construction (Design and Management) Regulations 2015, regulation 22 (excavations: preventing collapse; inspection and written reports)

Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides

Find excavation contractors by city

England

Show 173 cities

What affects the cost of excavation

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size of the yard and the scope of the design
  • Grading, excavation and drainage work
  • Hardscape materials, such as stone, pavers or wood
  • Plants, sod and soil
  • Access for machinery
  • Removal of old materials, trees or stumps
  • How often visits are scheduled for ongoing services

How to compare excavation contractors before you hire

  • Choose a company that does the kind of work you need, since design, lawn care, tree work and hardscaping are different specialties.
  • For big projects, ask for a site plan or drawing before work starts.
  • Ask how they'll handle grading and drainage so water moves away from the house.
  • For tree removal or large pruning, look for a qualified arborist with liability insurance.
  • For ongoing services like lawn care or snow removal, get the visit schedule and what's included in writing.

Questions to ask excavation contractors before you hire

  • Can I see a plan or drawing before you start?
  • How will you handle drainage and grading?
  • Will you have underground utilities located before you dig?
  • Does any of this work need a permit, such as for a retaining wall, fence or tree removal?
  • What plants or materials do you recommend for our climate and my yard's sun and shade?
  • Do you guarantee plants or sod, and for what conditions?
  • Can you show me proof of liability insurance?

When to call a pro for excavation

  • Water that pools near the house or in the yard after rain
  • A tree that is leaning, cracked or has large dead branches over the house or a driveway
  • A retaining wall that is bulging, leaning or cracking

Excavation permits and local rules

Some excavation work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Free project calculators

Ready to get excavation quotes?

Tell us about your excavation project.

Do you offer excavation services?

Join LokalMatch to get matched with homeowners in the areas you serve.