Demolition
Demolition near you
Domestic demolition is rarely a whole house. Far more often it is a garage that has reached the end of its life, a rear extension being removed to make way for a better one, an outbuilding, a chimney stack, or a strip-out back to brickwork before a major refurbishment. All of it is more regulated than homeowners expect, and the regulation begins before anyone arrives: in England and Wales you generally have to tell the local authority first and then wait.
Tell us about your demolition project and we’ll help you find local demolition contractors who serve your area.
Free for homeowners · No obligation to hire
On this page
The reason is that demolition creates hazards for people who are not your contractor. Neighbouring buildings lose support, services have to be disconnected in the right order, materials come down that were harmless while they were fixed in place, and the local authority may want conditions imposed about how the site is left. The notice regime exists to give the council a chance to say so.
The second reason is asbestos. Any building built or refurbished before 2000 may contain it, and demolition is the single most disturbing thing that will ever happen to a structure. The survey question belongs at the start of the process, not when the machine is already on site.
The six weeks you have to wait: section 80 of the Building Act 1984
Section 80 of the Building Act 1984 requires a person intending to demolish a building, or part of one, to give notice of that intention to the local authority, and also to the occupier of any adjacent building, to the relevant gas supplier and to the relevant electricity supplier. The section is expressed as a prohibition rather than a formality: no person shall begin a demolition to which the section applies unless notice has been given and either the authority has responded or the defined period has expired.
Section 81 sets out what the authority can do with that notice. It may serve a counter-notice on the person carrying out the demolition, and the relevant period for doing so is six weeks from the section 80 notice unless the person giving the notice allows longer in writing. That is where the six-week figure comes from, and it is the reason demolition cannot be arranged for next week. The authority must copy its notice to the owners and occupiers of adjacent buildings, to statutory undertakers where their work is required, and to the fire and rescue authority where relevant. A requirement in the counter-notice cannot conflict with health and safety law: section 81 provides that where a requirement is inconsistent with one imposed under the Health and Safety at Work etc. Act 1974, the latter prevails.
Section 80 also carries exceptions, and they matter for domestic jobs. The notice requirement does not apply to demolition pursued under a demolition order or obstructive building order under Part IX of the Housing Act 1985, to the demolition of an internal part of a building where the building is occupied and is intended to remain occupied, to a building with a cubic content not exceeding 1,750 cubic feet — which expressly includes a greenhouse, conservatory, shed or prefabricated garage — or to certain agricultural buildings. This is the Building Act, which applies in England and Wales; Scotland and Northern Ireland are dealt with below.
Asbestos comes out before the building does
The Control of Asbestos Regulations 2012 set the sequence, and it is the opposite of what people assume. Regulation 5 provides that an employer must not undertake demolition, maintenance or any other work which exposes or is liable to expose employees to asbestos unless a suitable and sufficient assessment has been carried out as to whether asbestos is present or liable to be present, and that where there is doubt, the employer must assume asbestos is present and that it is not chrysotile alone, and comply accordingly.
Regulation 7 then deals with the order of work. A written plan of work must be prepared before asbestos work starts and kept at the site while it is going on, specifying the nature and duration of the work, the location, the methods for handling asbestos-containing materials, the equipment for protection and decontamination, and the measures for compliance with the related regulations. Critically, in demolition or major refurbishment the plan must provide for asbestos to be removed before any other major works begin, unless doing so would cause a greater risk than leaving it in place.
For a homeowner, the practical translation is short. Establish whether a survey has been done and what type it is before you accept a demolition quotation, because a price that assumes a clean building and a price that includes licensed removal are not comparable. Do not let anyone start a soft strip in a pre-2000 building on the assumption that anything suspect will be spotted as they go. And do not attempt removal yourself: the position on asbestos in owner-occupied homes and where to get advice is set out in the major renovations guide on this site.
Demolition has to be planned in writing before it starts
Regulation 20 of the Construction (Design and Management) Regulations 2015 is one sentence long and does a great deal of work. It requires that the demolition or dismantling of a structure be planned and carried out in such a manner as to prevent danger or, where that is not practicable, to reduce danger to as low a level as is reasonably practicable. It then adds the requirement that gives the duty teeth: the arrangements for carrying out the demolition or dismantling must be recorded in writing before the work begins.
So there is a document, and you are entitled to ask to see it. A competent demolition contractor will have a method statement setting out the sequence of removal, how stability is maintained at each stage, how services are isolated, how the public and neighbouring property are protected, and how material leaves the site. If a contractor cannot produce one for a garage or an extension, that tells you something about how the rest of the job will be run.
CDM 2015 also allocates duties differently when the client is a domestic one having work done on their own home. Those duties generally pass to the contractor on a single-contractor project or to the principal contractor where more than one contractor is involved, which is explained in the renovations guides on this site. The point worth making here is that the transfer is not an exemption: the duties still exist, and the written demolition arrangements are among them.
How a domestic demolition actually runs
- A survey of the structure, including asbestos, and a check of what the building is supporting or being supported by.
- Notification under section 80 where it applies, and the wait for the local authority's response or the expiry of the period.
- Disconnection of services in the right order, arranged with each utility rather than cut by the contractor.
- A soft strip of fittings, linings and salvageable material before any structural demolition begins.
- Protection of what stays: neighbouring walls, boundary fences, drains, paving, trees and anything the machine will pass.
- The demolition itself, sequenced so the structure comes down in a controlled order rather than being pushed over.
- Segregation of materials on site, since separating rubble, timber, metal and gypsum affects both compliance and cost.
- Making good: capping drains, backfilling, leaving the ground safe and leaving the exposed wall of an adjoining building weathertight.
Scotland, Northern Ireland, and the buildings you may not demolish at all
Scotland does not use the Building Act notice. Demolition there is building work under the Building (Scotland) Regulations 2004, and a building warrant from the local authority's verifier is generally needed before it starts. Warrants for demolition are granted with a time period attached, and the application asks for information about the existing building and the proposed method so that the verifier can judge what protective works are needed for the safety of the public. That is a different process with a different timetable, and it should be started earlier than people expect.
Northern Ireland has its own building regulations administered by district councils, and this guide has not verified the demolition notification position there. If you are in Northern Ireland, ask your district council's building control service directly rather than relying on the English and Welsh position described above.
Separately from all of this, some buildings cannot be demolished without a planning consent of their own. Demolition of a listed building, or of an unlisted building in a conservation area, engages a consent regime that is dealt with in the major renovations guide on this site, and demolishing first and asking afterwards is a criminal matter rather than a procedural one. If either might apply to your building — and a Victorian outbuilding in a conservation area is a real example, not a theoretical one — speak to the local planning authority before you speak to a demolition contractor.
The things that go wrong on domestic demolition
- A shared or party structure being taken down or cut into without the notice procedure that applies to it; the party wall regime is covered elsewhere on this site and should be dealt with before, not during.
- The exposed flank wall of a neighbouring building left unweathered after an attached extension or garage comes down.
- Services cut rather than disconnected, particularly old gas supplies to a garage or an outbuilding.
- Drains left open or crushed by a machine, which shows up as a blockage weeks later.
- Dust and noise complaints from neighbours, which are avoidable with damping down and agreed working hours.
- Mixed waste leaving site in a single load, which costs more to dispose of and can breach the separation rules for particular materials.
- Ground left unsafe or unbackfilled, leaving a trip hazard and an open foundation for whoever builds next.
What drives a demolition quote, and how LokalMatch fits in
Demolition pricing is about disposal and access more than about knocking things down. The variables are the volume and type of material coming out, whether asbestos has been found and whether its removal is licensed work, whether a machine can reach the structure or it has to be taken down by hand, how close the neighbours and the boundary are, what has to be protected or temporarily supported, how services are disconnected, whether material is segregated on site, and what happens to the ground afterwards. A detached garage with machine access on a wide drive and a rear extension between two terraced houses are different jobs at very different prices.
LokalMatch does the introduction and leaves the rest between you and the contractor. Describe what needs to come down, what it adjoins and how a machine might reach it, once, with your postcode, and demolition contractors covering your area can get in touch. Homeowners pay nothing to use LokalMatch; pros pay for the requests they receive. LokalMatch does not carry out demolition, does not set prices and does not vet, rank or recommend anyone who responds, so checking insurance, waste arrangements and the written demolition plan is your responsibility.
Demolition: frequently asked questions
Do I have to tell the council before demolishing my garage?
In England and Wales, usually yes, but there is an exception that catches many garages. Section 80 of the Building Act 1984 requires notice to the local authority, the occupier of any adjacent building and the gas and electricity suppliers, and demolition must not begin until the authority responds or the period expires. However, the section does not apply to a building whose cubic content does not exceed 1,750 cubic feet, and that exception expressly includes a greenhouse, conservatory, shed or prefabricated garage. A substantial masonry garage will usually exceed it.
How long do I have to wait after giving a demolition notice?
Six weeks, unless the council responds sooner. Section 81 of the Building Act 1984 gives the local authority a relevant period of six weeks from the section 80 notice in which to serve a counter-notice imposing requirements on the demolition, and that period can only be extended if the person who gave the notice agrees in writing. The counter-notice may deal with matters such as making good and the safety of adjacent buildings, and cannot impose anything inconsistent with health and safety law.
Does asbestos have to be removed before demolition?
Generally yes. Regulation 7 of the Control of Asbestos Regulations 2012 requires a written plan of work before asbestos work begins, and provides that in demolition or major refurbishment the asbestos must be removed before any other major works start, unless removal would cause a greater risk than leaving it in place. Regulation 5 requires a suitable and sufficient assessment first, and requires the employer to assume asbestos is present, and is not chrysotile alone, where there is any doubt.
What paperwork should a demolition contractor give me before starting?
At minimum, the written arrangements for the demolition. Regulation 20 of the Construction (Design and Management) Regulations 2015 requires demolition to be planned and carried out so as to prevent danger, or reduce it as low as is reasonably practicable, and requires the arrangements to be recorded in writing before the work begins. Ask to see that document along with the asbestos survey, proof of insurance and the waste arrangements. A contractor who has none of them is not the contractor for the job.
Is the process different in Scotland?
Yes, and the Building Act notice does not apply there. In Scotland demolition is building work under the Building (Scotland) Regulations 2004 and generally needs a building warrant from the local authority's verifier before it starts, granted with a period within which the work must be completed, and the application asks for detail about the existing building and the demolition method so the verifier can judge what protective works are required. Northern Ireland has its own regulations through district councils and should be checked locally.
Sources
- Building Act 1984, section 80 (notice to local authority of intended demolition)
- Building Act 1984, section 81 (local authority's power to serve notice about demolition)
- The Control of Asbestos Regulations 2012, regulation 5 (identification of the presence of asbestos)
- The Control of Asbestos Regulations 2012, regulation 7 (plans of work)
- The Construction (Design and Management) Regulations 2015, regulation 20 (demolition or dismantling)
- Scottish Government: building standards procedural handbook — building warrants to build, convert or demolish
Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides
What demolition contractors can help with
Common jobs homeowners hire demolition contractors for:
Find demolition contractors by city
England
Show 173 citiesHide cities
- Demolition in Birmingham
- Demolition in Bournemouth
- Demolition in Bradford
- Demolition in Brighton and Hove
- Demolition in Bristol
- Demolition in Cambridge
- Demolition in Coventry
- Demolition in Derby
- Demolition in Exeter
- Demolition in Ipswich
- Demolition in Kingston upon Hull
- Demolition in Leeds
- Demolition in Leicester
- Demolition in Liverpool
- Demolition in London
- Demolition in Luton
- Demolition in Manchester
- Demolition in Middlesbrough
- Demolition in Milton Keynes
- Demolition in Newcastle upon Tyne
- Demolition in Northampton
- Demolition in Norwich
- Demolition in Nottingham
- Demolition in Oxford
- Demolition in Peterborough
- Demolition in Plymouth
- Demolition in Portsmouth
- Demolition in Reading
- Demolition in Sheffield
- Demolition in Southampton
- Demolition in Southend-on-Sea
- Demolition in Stoke-on-Trent
- Demolition in Sunderland
- Demolition in Swindon
- Demolition in Wolverhampton
- Demolition in York
- Demolition in Ashford
- Demolition in Aylesbury
- Demolition in Banbury
- Demolition in Barnsley
- Demolition in Barrow-in-Furness
- Demolition in Basildon
- Demolition in Basingstoke
- Demolition in Bath
- Demolition in Bebington
- Demolition in Bedford
- Demolition in Beeston
- Demolition in Birkenhead
- Demolition in Blackburn
- Demolition in Blackpool
- Demolition in Bloxwich
- Demolition in Bognor Regis
- Demolition in Bolton
- Demolition in Bootle
- Demolition in Bracknell
- Demolition in Brentwood
- Demolition in Burnley
- Demolition in Burton upon Trent
- Demolition in Bury
- Demolition in Cannock
- Demolition in Canterbury
- Demolition in Carlisle
- Demolition in Chatham
- Demolition in Chelmsford
- Demolition in Cheltenham
- Demolition in Chester
- Demolition in Chesterfield
- Demolition in Clacton-on-Sea
- Demolition in Colchester
- Demolition in Corby
- Demolition in Crawley
- Demolition in Crewe
- Demolition in Crosby
- Demolition in Darlington
- Demolition in Dartford
- Demolition in Dewsbury
- Demolition in Doncaster
- Demolition in Dudley
- Demolition in Durham
- Demolition in Eastbourne
- Demolition in Ellesmere Port
- Demolition in Farnborough
- Demolition in Folkestone
- Demolition in Gateshead
- Demolition in Gillingham
- Demolition in Gloucester
- Demolition in Gosport
- Demolition in Gravesend
- Demolition in Grimsby
- Demolition in Guildford
- Demolition in Halesowen
- Demolition in Halifax
- Demolition in Harlow
- Demolition in Harrogate
- Demolition in Hartlepool
- Demolition in Hastings
- Demolition in Hemel Hempstead
- Demolition in Hereford
- Demolition in High Wycombe
- Demolition in Hinckley
- Demolition in Horsham
- Demolition in Huddersfield
- Demolition in Huyton with Roby
- Demolition in Kettering
- Demolition in Kidderminster
- Demolition in Kingswinford
- Demolition in Kingswood and Fishponds
- Demolition in Lancaster
- Demolition in Lincoln
- Demolition in Loughborough
- Demolition in Lowestoft
- Demolition in Macclesfield
- Demolition in Maidenhead
- Demolition in Maidstone
- Demolition in Mansfield
- Demolition in Margate
- Demolition in Newcastle-under-Lyme
- Demolition in Nuneaton
- Demolition in Oldham
- Demolition in Paignton
- Demolition in Poole
- Demolition in Preston
- Demolition in Redditch
- Demolition in Rochdale
- Demolition in Rochester
- Demolition in Rotherham
- Demolition in Royal Leamington Spa
- Demolition in Royal Sutton Coldfield
- Demolition in Royal Tunbridge Wells
- Demolition in Rugby
- Demolition in Runcorn
- Demolition in Sale
- Demolition in Salford
- Demolition in Scarborough
- Demolition in Scunthorpe
- Demolition in Shrewsbury
- Demolition in Sittingbourne
- Demolition in Slough
- Demolition in Smethwick
- Demolition in Solihull
- Demolition in South Shields
- Demolition in Southport
- Demolition in St Albans
- Demolition in St Helens
- Demolition in Stafford
- Demolition in Stevenage
- Demolition in Stockport
- Demolition in Stockton-on-Tees
- Demolition in Stourbridge
- Demolition in Tamworth
- Demolition in Taunton
- Demolition in Telford
- Demolition in Torquay
- Demolition in Tynemouth
- Demolition in Wakefield
- Demolition in Wallasey
- Demolition in Walsall
- Demolition in Warrington
- Demolition in Washington
- Demolition in Watford
- Demolition in Wellingborough
- Demolition in Welwyn Garden City
- Demolition in West Bromwich
- Demolition in Weston-super-Mare
- Demolition in Weymouth
- Demolition in Widnes
- Demolition in Wigan
- Demolition in Woking
- Demolition in Wokingham
- Demolition in Worcester
- Demolition in Worthing
- Demolition in Wythenshawe
- Demolition in Yeovil
Northern Ireland
Show 7 citiesHide cities
Scotland
Show 10 citiesHide cities
What affects the cost of demolition
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size and scope of the job
- Materials and finishes chosen
- Condition of what's there now
- Access to the work area
- Urgency and scheduling
- Permits, where required
How to compare demolition contractors before you hire
- Describe the job clearly, with photos if you can, so pros can give you a realistic quote.
- Get more than one written quote and compare them on the same scope of work.
- Check that the pro carries liability insurance and, where required, is licensed for this work in your area.
- Look at recent reviews and photos of similar jobs.
- Get the price, the timeline and the payment terms in writing before work starts.
Questions to ask demolition contractors before you hire
- Have you done jobs like this before, and can I see examples?
- What is included in your price, and what isn't?
- Does this work need a permit from my municipality, and who will get it?
- Can you show me proof of liability insurance?
- When can you start, and how long will the job take?
- What warranty or guarantee do you offer on your work?
Demolition permits and local rules
Some demolition work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingGuides about demolition
- ✦
Skip Hire guide
Skip hire is a contract, not a purchase, and reading it that way explains most of what surprises people. You are hiring a container for a period, on terms about where it stands, what may go into it, how full it may be…
Read guide - ✦
Blinds & Shutters guide
Blinds and shutters are usually bought as decoration and fitted as one, which is why the most important thing about them is easy to miss: the cord is the regulated part.
Read guide - ✦
Sheds guide
The garden shed is the most common building project in the United Kingdom and the one most often got slightly wrong.
Read guide
Ready to get demolition quotes?
Tell us about your demolition project.
Do you offer demolition services?
Join LokalMatch to get matched with homeowners in the areas you serve.