Structural renovation is the work that changes how a building carries itself: removing a loadbearing wall, opening a rear elevation, adding a storey, underpinning a footing, or taking out a chimney breast that turns out to be supporting more than the chimney. What these jobs have in common is that they redirect loads, and a load that has been redirected has to arrive somewhere that can accept it, all the way down to the ground.
Tell us about your structural renovation project and we’ll help you find local general contractors who serve your area.
Free for homeowners · No obligation to hire
On this page
Australia handles this through a performance-based Code with a well-mapped compliance route. Performance requirement H1P1 of Volume Two states that a building or structure is to withstand the combination of loads and other actions to which it may be reasonably subjected, with requirements covering adequate performance under design actions, extreme and repeated actions, sustaining local damage, and the protection of adjacent properties. The deemed-to-satisfy clauses then discharge that by naming Australian Standards: AS 2870 and AS 3600 for footings and slabs at H1D4, AS 3700 and the AS 4773 series for masonry at H1D5, and at H1D6 the framing suite of AS 1684.2, AS 1684.3 and AS 1684.4, AS 1720.1 and AS 1720.5, AS 4100 for steel, AS/NZS 4600 for cold-formed steel and the NASH Standard.
The practical meaning is simple. If your alteration can be built within those documents, the paperwork is comparatively light. The moment it cannot, you have bought a performance solution, an engineer's design and a longer approval, and that should be known at the concept stage rather than discovered at the quote stage.
Signs the wall you want to remove is doing work
- It runs at right angles to the floor or ceiling joists above, which is the classic indicator that it is carrying them.
- There is a wall, a beam or a footing more or less directly beneath it on the floor below.
- It continues through more than one storey, or a similar wall appears in the same position above.
- Ceiling joists or roof members are lapped or joined over it rather than running past it.
- It is masonry in a house where the other internal walls are lightweight.
- There is existing cracking above a doorway in that wall, which suggests the lintel is already working hard.
- Struts from the roof structure land on or near it, which is common in conventionally framed Australian roofs and easy to miss from below.
The deemed-to-satisfy route, and what it means to step outside it
Volume Two sets out the structural deemed-to-satisfy clauses at H1D2 to H1D11. H1D2 points to Section 2 of the ABCB Housing Provisions or to the specific clauses following. H1D3 covers site preparation, referencing Part 3.2 for earthworks, AS 4678 for earth retaining structures and Part 3.4 for termite management. H1D4 covers footings and slabs through AS 2870, AS 3600 and Section 4 of the Housing Provisions. H1D5 covers masonry through AS 3700 and AS 4773.1 and AS 4773.2.
Framing is H1D6, and it is the clause most structural renovations live in. It references the NASH Standard for residential and low-rise steel framing, AS 4100 for steel structures, AS/NZS 4600 for cold-formed steel, AS 1720.1 and AS 1720.5 for timber design, the AS 1684 residential timber framing series and AS 1860.2 for particleboard flooring. H1D9 deals with earthquake areas through Section 2 of the Housing Provisions.
A design that sits inside those standards can be documented and approved as a deemed-to-satisfy solution. A design that does not, which includes most long-span openings and most retrofitted steel in a house, is a performance solution assessed against H1P1. Neither is better or worse; they cost different amounts of time and documentation, and knowing which one you are buying is the point.
From first crack in the plaster to final structural inspection
- An initial assessment that establishes what is loadbearing, what is beneath it, and what the roof is doing, before any drawings are produced.
- A structural engineer's design, covering the new member, its connections, its bearings and the load path all the way to the footings.
- Confirmation that the existing footings can accept the concentrated load, since a beam delivers at two points what a wall delivered along its whole length.
- Building approval through your state's pathway, with the engineering documentation forming part of the application.
- Temporary support installed and checked before anything is removed, on both sides of the wall where floors above are involved.
- Installation of the new structure, with the bearings built and packed exactly as detailed rather than as convenient.
- Inspection at the stages your state requires, and retention of the engineer's certification with the house's records.
Temporary support is the part that actually kills people
The permanent structure is designed, documented and inspected. The temporary condition, the hours or days when the old wall is gone and the new beam is not yet loaded, is where structural renovations injure people, and it is the part most often left to on-site judgement. Propping has to pick up the load before the wall is disturbed, it has to bear on something capable of taking it rather than on a floor that is itself spanning, and it has to stay in place until the permanent member is bearing properly.
This is not homeowner work, and it is not work to supervise from the next room. Have the engineer specify the temporary support as part of the design, not as an afterthought, and keep the house's occupants out of the affected area while it is in place. Demolition of a loadbearing element is also frequently the point at which older materials are disturbed, so establish what the wall is made of before anyone starts cutting.
The same caution applies to excavation near a boundary or near a neighbour's footing. Performance requirement H1P1 expressly contemplates the protection of adjacent properties, and a dispute with a neighbour about a cracked wall is far cheaper to prevent with a pre-works condition survey than to resolve afterwards.
Where structural renovations go over budget
The usual cause is not the beam. It is what the beam lands on. A wall spreads its load along its length; a beam concentrates the same load at two bearing points, and those points need piers, pads or new footings capable of accepting them. When an existing footing turns out to be shallow, undersized or sitting on reactive clay, the scope grows underground where nobody can see it and nobody budgeted for it.
Reactive soils deserve particular mention in Australia, because AS 2870 exists precisely because so much of the country's residential building sits on clay that moves with moisture. A structural alteration that changes drainage, removes a tree or alters how water reaches the soil next to a footing can set off movement that has nothing to do with the beam you installed.
The other common surprise is the ceiling and roof above. Once a wall is out, any sag that the wall was quietly holding up becomes visible, and levels that were never quite right become obvious across a newly open space. Agreeing in advance what will be corrected and what will be accepted saves an awkward conversation at the plastering stage.
The documents that prove the work was done properly
Structural work is the category where documentation has the longest useful life. Keep the engineer's drawings and computations, the certification that the work was carried out in accordance with the design, the building approval, the inspection records, and photographs of the bearings and connections before they were covered. A buyer's building inspector will ask, an insurer may ask after any future damage, and a subsequent renovation will be far cheaper to design if the next engineer can see what is there.
Licensing and residential building insurance requirements sit on top and are set state by state, with their own thresholds and prescribed contract terms. Confirm that the contractor's licence class genuinely covers structural work rather than assuming a general licence does, and check it on the regulator's public register for your state rather than accepting a card or a number on a quote.
Structural Renovations: frequently asked questions
How do I know whether a wall is loadbearing?
The reliable indicators are that it runs at right angles to the joists above, that something is supporting it directly below, that it continues through more than one storey, or that roof struts land on or near it. None of these is conclusive on its own, and in conventionally framed Australian roofs struts often land on walls that look purely internal. The only safe answer comes from someone who has looked in the roof space and under the floor, not from a plan.
Why does my builder need an engineer for one beam?
Because the Code's compliance route for structure is a set of Australian Standards, and most retrofitted beams sit outside them. Clause H1D6 of Volume Two covers framing through AS 1684, AS 1720.1 and AS 1720.5, AS 4100, AS/NZS 4600 and the NASH Standard, and a design that cannot be built within those documents becomes a performance solution assessed against performance requirement H1P1. That assessment needs an engineer's design and documentation a building surveyor can accept.
Do the footings need work if I remove a wall?
Often yes, and it is the most commonly underestimated part of the job. A wall distributes its load along its whole length, while a beam concentrates the same load at two bearing points. Those points need piers, pads or new footings designed to take them. Clause H1D4 of Volume Two covers footings and slabs through AS 2870 and AS 3600, and on Australia's reactive clay soils the footing design is rarely a formality.
How long does temporary propping stay in place?
Until the permanent structure is bearing properly, which is a decision for the engineer rather than the site. Propping must pick up the load before the existing element is disturbed and must bear on something capable of taking it. The temporary condition is the most dangerous part of a structural renovation, so it belongs in the engineer's documentation rather than being improvised, and the affected part of the house should be kept clear while it is in place.
Do I need to tell my neighbour before structural work?
It is sensible, and sometimes required. Performance requirement H1P1 of Volume Two expressly contemplates the protection of adjacent properties, and work involving excavation, underpinning or a shared or boundary wall can affect a neighbour's building. A dated photographic condition survey before work starts costs very little and is the most effective way to settle a later argument about whether a crack was there beforehand. Notification duties themselves are set by state legislation, so check your own state's requirements.
Sources
Written by the LokalMatch editorial team. Last reviewed 22 September 2026. How we write and check our guides
Find general contractors by city
Australian Capital Territory
Show 1 citiesHide cities
New South Wales
Show 8 citiesHide cities
Northern Territory
Show 1 citiesHide cities
Queensland
Show 10 citiesHide cities
- Structural Renovations in Brisbane
- Structural Renovations in Gold Coast
- Structural Renovations in Sunshine Coast
- Structural Renovations in Bundaberg
- Structural Renovations in Cairns
- Structural Renovations in Hervey Bay
- Structural Renovations in Mackay
- Structural Renovations in Rockhampton
- Structural Renovations in Toowoomba
- Structural Renovations in Townsville
South Australia
Show 1 citiesHide cities
Tasmania
Show 2 citiesHide cities
Victoria
Show 5 citiesHide cities
Western Australia
Show 2 citiesHide cities
What affects the cost of structural renovation
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size and scope of the project
- Structural changes, such as moving or removing walls
- Plumbing, electrical and HVAC work involved
- Finishes and materials chosen
- Design, drawings and permits
- Condition of the existing house once it's opened up
- Access to the site and the timeline
How to compare general contractors before you hire
- Look for a contractor who has finished projects similar in size and type to yours, and ask to see them.
- Get a written contract with the scope, the payment schedule, the timeline and how changes will be priced.
- Ask who will manage the job day to day and how often you'll get updates.
- Check that they carry liability insurance and workers' compensation coverage, and that their trades are licensed where required.
- Compare quotes on the same scope, and ask what each one leaves out.
- For structural changes, make sure an engineer or designer is involved where needed.
Questions to ask general contractors before you hire
- Who will pull the permits, and who will be there for inspections?
- Which parts of the job will you do yourselves, and which will go to subcontractors?
- How do you handle change orders and unexpected problems once walls are open?
- What is the payment schedule, and what is each payment tied to?
- Can you show me proof of liability insurance and workers' compensation coverage?
- What warranty do you offer on your workmanship, and is it in writing?
- Can I speak with a few of your recent clients?
Structural renovation permits and local rules
Some structural renovation work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingGuides about structural renovation
- ✦
Builders guide
In Australia the person who takes on a whole renovation is usually called a builder, and on larger jobs a building contractor or project manager.
Read guide - ✦
Home Renovations guide
A home renovation is work on a house you already own: reworking rooms, replacing what has worn out, opening up a plan that no longer suits the household. Australian housing stock makes that a very wide category.
Read guide - ✦
Whole Home Renovations guide
A whole-home renovation takes the entire house at once: every room stripped back, the plan redrawn, the services renewed and the finishes replaced, often with part of the building demolished and rebuilt.
Read guide
Ready to get structural renovation quotes?
Tell us about your structural renovation project.
Do you offer structural renovation services?
Join LokalMatch to get matched with homeowners in the areas you serve.