Roof Replacement
Roof Replacement near you
Replacing a roof in Australia is mostly a choice between sheet metal and tile, and it is worth saying plainly that asphalt shingles, the default across North America, are uncommon here. Metallic coated and prepainted steel sheet dominates new housing and re-roofing, concrete and terracotta tiles cover a great deal of the mid-century and post-war suburbs, and fibre cement survives on older houses. A replacement means stripping the existing covering, checking and correcting what is underneath, and installing a new system fixed for the conditions at your address.
Tell us about your roof replacement project and we’ll help you find local roofers who serve your area.
Free for homeowners · No obligation to hire
On this page
Three site facts govern the specification long before anyone discusses colour. The wind classification, determined under AS 4055 or AS/NZS 1170.2, sets the fixing pattern and the tie-down. Whether the address sits in a cyclonic wind region changes the structural requirement outright. And whether it is on designated bushfire prone land determines whether the roof must be built to AS 3959 at an assessed bushfire attack level.
The fourth fact is corrosion. Metal sheet roofing carries a metallic coating to AS 1397, and the coating class has to suit the environment, which near the coast is a different specification from the same house built inland. Getting that wrong is the most common way a new Australian roof disappoints, because nothing looks wrong for the first several years.
What Australian roofs are actually replaced with
The National Construction Code points metal roofing at AS 1562.1, and in wind regions B, C and D applies the cyclonic provisions of the Housing Provisions on top of it. Tiles are bedded and pointed with flexible pointing to AS 2050 and fixed at a density set by the wind class. Both are mainstream, well-supported choices in Australia; the decision is usually driven by the existing structure, the site exposure and what the roof is expected to feed.
- Prepainted steel sheet in corrugated and trapezoidal profiles, fixed with matched screws and sealing washers, and the default for re-roofing a tile home that is being lightened.
- Metallic coated steel sheet without the paint finish, still widely used on sheds, carports and utility roofs.
- Concrete tiles, heavy and common on post-war housing, where replacing like with like avoids reworking the roof structure.
- Terracotta tiles, long-lived and handsome but brittle underfoot, with matching second-hand stock increasingly hard to source for older profiles.
- Standing seam and concealed-fix metal systems on contemporary and low-pitch designs, where exposed fasteners are undesirable.
- Membrane systems over genuinely flat sections, which are drainage design rather than roof covering and are usually handled separately.
- Coating class matched to the corrosion environment under AS 1397, which near salt spray is not the same specification as the identical house built inland.
Sheet metal or tile: how the choice plays out in Australian conditions
Weight is the first real difference. Concrete and terracotta tiles are heavy, and the roof structure of a tiled house was designed for that load. Going from tile to sheet reduces the load, which is straightforward, but the battens, their spacing and sometimes the top plate detail all change, so a tile-to-metal conversion is a bigger job than swapping one sheet profile for another. Going the other way, from sheet to tile, is a structural question that needs someone qualified to answer, not an assumption.
Exposure decides the rest. In a cyclonic wind region the roof is part of a continuous load path, and the Housing Provisions are explicit that the anchorage system connects the roof through the walls to the footings by a chain of connections in which every connector must carry the uplift force, because the building's resistance is governed by its weakest link. That reality favours systems whose tie-down can be engineered and inspected. On bushfire prone land the assessed bushfire attack level, not the material in the abstract, governs the whole assembly and its junctions, since ember entry through gaps is the mechanism that matters.
Then the quieter differences: a sheet roof is faster to strip and lay and sheds water at lower pitches, while a tile roof is repairable tile by tile and forgiving of foot traffic damage in a way a creased sheet is not. If the roof feeds a rainwater tank, ask about the catchment surface and, critically, about what the gutters and flashings are made of, because the Code prohibits lead in a roof forming part of a drinking water catchment.
What a full re-roof involves, in order
It begins with two determinations that belong on the quote. The wind classification for the site, established under AS 4055 for housing within its geometric limits or under AS/NZS 1170.2 otherwise, sets the fixing pattern, the batten spacing and the tie-down. The bushfire status of the address, and if it is bushfire prone, the assessed attack level, determines whether the roof, its junctions and its openings must be built to AS 3959 or to the NASH steel framed construction standard for bushfire areas. Both apply to Class 1 houses and their associated Class 10a buildings and decks.
The physical sequence then runs: isolate and remove anything mounted on the roof, including solar arrays and, where the roof feeds a tank, divert the tank inlet so demolition debris does not go into your drinking water; strip and dispose of the old covering; expose, inspect and repair battens, rafters and any timber that has been wet; install sarking to AS 4200.1 where it is required; lay and fix the new covering to the fixing pattern for the wind class; then reinstate flashings, valleys, capping, guttering, downpipes and everything that was removed.
Ask two questions that separate serious quotes. What happens, in writing, if damaged timber is found once the covering is off, since nobody can see it beforehand and it is the most common variation. And who is doing the roof plumbing, under which licence, because in several states guttering, downpipes, flashings and roof coverings are a distinct licensed class of work from the roofing itself.
What decides how long a new Australian roof lasts
- The coating class specified against the corrosion environment, which is the single biggest determinant near the coast and is set at ordering, not later.
- Whether fasteners, flashings, gutters and the sheet are compatible metals, since the Code bars lead upstream of aluminium and zinc coated material and copper upstream of galvanised.
- Whether the fixing pattern matched the wind classification of the site rather than a generic pattern.
- How much foot traffic the roof receives afterwards from antenna, air conditioning, solar and pest control visits.
- Whether cut edges, swarf and offcuts were cleaned off the sheet at completion, because leftover steel filings rust and stain straight through a new coating.
- How well the roof drains: ponding at a low-pitch section or a blocked valley keeps water against metal and defeats any coating.
- Whether overhanging vegetation is kept clear of the surface, since abrasion and trapped litter shorten the life of any covering.
Approvals and licensing for a roof replacement
Replacing a covering with the same material is often treated as repair or maintenance, but the answer changes as soon as anything else changes. Altering the roof form or pitch, changing the structure, converting between tile and sheet so the load changes, working on a heritage-listed property, or building on designated bushfire prone land can all bring the work into the approval system. Your council or a private building surveyor gives the definitive answer for your address, and that is a phone call worth making before you sign, not after the covering is off.
Licensing is separate and sits with your state. Queensland requires a QBCC licence for building work above its threshold and for plumbing and drainage at any value, and issues roof tiling, roof and wall cladding, and metal fascias and gutters as distinct trade classes. New South Wales requires a contractor licence for general building work above the Home Building Act threshold, and the Act carries substantial penalties for unlicensed work. Western Australia registers builders through the Building Services Board, supported by Building and Energy. Victoria registers building practitioners and licenses plumbing work by class through Consumer Affairs Victoria's framework.
LokalMatch is the sourcing step. You describe the re-roof once, including the existing covering, the number of storeys, the approximate roof area, whether there are solar panels or a rainwater tank, and whether the site is bushfire prone or coastal, and matched roofers respond to you directly. They pay for the requests they receive. LokalMatch does not carry out roofing, does not set prices and does not vet, rank or endorse anyone, so the licence check and the approvals question stay with you.
Statutory insurance and the paperwork to hold onto
A re-roof is usually large enough to trigger your state's statutory scheme, and these have no overseas equivalent, so read this part carefully. In Queensland the Home Warranty Scheme covers residential construction work above its threshold, with the contractor paying the premium based on the insurable value and building it into the price. In New South Wales, home building compensation cover must be in place for contracts above the scheme threshold, and the deposit is capped at 10 per cent of the contract price for both small and large jobs. In Victoria, domestic building insurance is required above the contract threshold, the builder must take it out, and the certificate of currency must be given to you before any deposit or other money is taken; it responds to structural defects for six years and non-structural defects for two.
Underneath the statutory schemes, the Australian Consumer Law guarantees the ACCC enforces apply regardless of what the contract says: the service must be provided with acceptable care and skill, must be fit for any purpose you made known, and must be supplied within a reasonable time where none was agreed. Telling the contractor in writing that the purpose includes feeding a drinking water tank, or surviving a specific wind classification, makes that purpose part of the guarantee.
Keep the certificate of cover, the contract and variations, the product and coating specification, the wind classification used, any bushfire attack level assessment, and the manufacturer's material warranty together. Manufacturer warranties on coated steel are commonly conditional on the correct coating class for the location and on maintenance such as washing down unwashed areas, so the specification document is the one that decides a claim years later.
What drives the price of an Australian re-roof
- The wind classification of the site, which changes fixing density, battens and tie-down hardware.
- Whether the address is bushfire prone and at what assessed attack level, since that governs the assembly and its junctions.
- Proximity to salt spray, which drives a higher coating class and better fastener and flashing metallurgy.
- Whether the job converts between tile and sheet, which brings batten and structural work that a like-for-like swap does not.
- Removing, storing and reinstating solar arrays, antennas, air conditioning and skylights.
- Disposal, which is a different exercise entirely if the existing covering is asbestos cement and requires licensed removal.
- Access: two storeys, a steep pitch, a narrow block or no room for a skip all add time before any roofing happens.
- Whether guttering, downpipes, valleys and capping are being renewed at the same time, which is usually the sensible moment to do it.
Roof Replacement: frequently asked questions
Why are asphalt shingles so rare on Australian roofs?
Australian housing developed around sheet metal and tile, and the supply chain, trade skills and code guidance all reflect that. The National Construction Code's deemed-to-satisfy provisions for housing address metal sheet roofing and roof tiles and shingles, and metal roofing is pointed at AS 1562.1. If you have seen shingles overseas and expect them here, expect a narrower choice of products and installers.
Do I need council approval to replace my roof?
Often not for a like-for-like covering replacement, but frequently yes once something else changes: the pitch, the form, the structure, the material weight, a heritage listing, or a bushfire prone location. The rules differ by state and council, so confirm with your council or a registered building surveyor for your specific address before ordering materials.
What is a wind classification and why is it on my quote?
It describes how much wind load your particular site sees, determined under AS 4055 for housing within its geometric limits or under AS/NZS 1170.2 otherwise, and it drives the fixing pattern, batten spacing and tie-down. It reflects the wind region, the terrain, the topography and the shielding around your house, so two homes in the same suburb can classify differently.
What is different about a re-roof in a cyclone area?
The roof stops being a covering and becomes part of a structural load path. In cyclonic wind regions the Code requires an anchorage system connecting the roof through the walls to the footings by a chain of connections, with each connector able to carry the uplift force, because the building is only as strong as its weakest link. That is engineering, not an optional upgrade.
Can I re-roof over the existing covering?
Australian practice is generally to strip rather than overlay, and there are good reasons: you cannot inspect battens and timbers you have covered up, added weight has to be justified structurally, and the fixings must reach sound framing. If an overlay is proposed, ask how the condition of what is underneath was established and what happens if it turns out to be wet or rotten.
My roof feeds a rainwater tank. What should happen during the work?
The tank inlet should be diverted or disconnected before demolition begins and reinstated only after the roof and gutters are clean, because stripping a roof puts dust, old sealant, swarf and debris straight into the catchment. Also confirm the new flashings and guttering contain no lead, which the Code prohibits where the roof forms part of a drinking water catchment.
Sources
- NCC Volume Two Part H1 Structure (roof and wall cladding, AS 1562.1)
- NCC: ABCB Housing Provisions Part 2.2 Structural provisions (wind and cyclonic areas)
- NCC Volume Two Part H7: Construction in designated bushfire prone areas
- NCC: ABCB Housing Provisions Part 7.1 Scope and application of Section 7
- NCC: ABCB Housing Provisions Part 7.4 Gutters and downpipes
- QBCC: Queensland Home Warranty Scheme
- Consumer Affairs Victoria: Domestic building insurance
- NSW Government: General building work licences
- ACCC: Consumer guarantees
Written by the LokalMatch editorial team. Last reviewed 14 September 2026. How we write and check our guides
Find roofers by city
Australian Capital Territory
Show 1 citiesHide cities
New South Wales
Show 8 citiesHide cities
Northern Territory
Show 1 citiesHide cities
Queensland
Show 10 citiesHide cities
South Australia
Show 1 citiesHide cities
Tasmania
Show 2 citiesHide cities
Victoria
Show 5 citiesHide cities
Western Australia
Show 2 citiesHide cities
What affects the cost of roof replacement
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Roof size and the number of layers to remove
- Roofing material
- Slope and how steep the roof is to work on
- Access to the roof and the site
- Condition of the decking underneath
- Flashing, vents, skylights and chimneys to work around
- Amount of repair work compared with a full replacement
How to compare roofers before you hire
- Ask for a written quote that lists the materials, the scope of work and what happens if damaged decking is found once the old roof is off.
- Look for a roofer who inspects the roof in person, including the attic if possible, before giving you a price.
- Check that they carry liability insurance and workers' compensation coverage, since roof work is high-risk.
- Compare quotes on the same scope: tear-off or overlay, underlayment, flashing, vents and cleanup.
- Ask to see recent roofs they've done that are similar to yours in material and slope.
Questions to ask roofers before you hire
- Will you remove the old roofing or install over it, and why?
- How will you handle damaged decking or other surprises once the roof is open?
- Who will pull the permit if one is needed?
- Can you show me proof of liability insurance and workers' compensation coverage?
- What warranty do you offer on your workmanship, and how long does it last?
- How will you protect my yard, gutters and siding, and how will you clean up nails and debris?
- Will your own crew do the work, or will you use subcontractors?
When to call a pro for roof replacement
- Water stains on ceilings or in the attic after rain or snowmelt
- Missing, curled or cracked shingles, or granules collecting in the gutters
- Sagging areas on the roof, which should be looked at by a professional right away
- Ice dams that keep forming along the edge of the roof
Roof replacement permits and local rules
Some roof replacement work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingSeasonal maintenance
This job is part of our home maintenance checklists for:
Free project calculators
Guides about roof replacement
- ✦
Roofers guide
An Australian roof is designed around wind, sun, driving rain and embers rather than snow load. Sheet metal dominates new work and re-roofing, concrete and terracotta tiles cover a great deal of the older suburban…
Read guide - ✦
Roof Repair guide
Most Australian roof repairs are one of three jobs: stopping a leak, arresting corrosion, or putting right ridge and hip capping that has let go.
Read guide - ✦
Emergency Roof Repair guide
An emergency roof call in Australia almost always follows the same weather: a summer storm cell, a hail line through the south east, an east coast low, or a tropical system in the north.
Read guide
Services related to roof replacement
Ready to get roof replacement quotes?
Tell us about your roof replacement project.
Do you offer roof replacement services?
Join LokalMatch to get matched with homeowners in the areas you serve.