Fire & Water Damage Renovations
Fire & Water Damage Renovations near you
Rebuilding after a fire, a storm or a burst pipe is a construction job wearing an insurance job's clothes. The scope is not set by what you want; it is set by what the policy responds to, what the loss adjuster accepts, and what the insurer's scope of works records. Homeowners who understand that early make better decisions, and homeowners who do not spend the first month arguing about the wrong things.
Tell us about your damage repair project and we’ll help you find local renovation contractors who serve your area.
Free for homeowners · No obligation to hire
On this page
The clock is set by the General Insurance Code of Practice, the industry code first introduced by the Insurance Council of Australia in 1994 and adopted by general insurers and Insurance Council members. Under the Code an insurer will tell you within 10 business days of receiving your claim what information it needs to make a decision, will decide within 10 business days of receiving all that information, and will make its decision within 4 months of receiving the claim, extending to 12 months only in defined circumstances such as a catastrophe, suspected fraud, or a claimant who is not responding. Compliance is overseen by the Code Governance Committee, which investigates alleged breaches, imposes sanctions and publishes an annual report.
The Code also acknowledges cash settlement directly, requiring an insurer offering one under a home building policy to give you information explaining how cash settlements work and how decisions about them are made. Whether to take a cash settlement or let the insurer arrange the rebuild is the single largest decision in the whole process, and it is the one most often made in the first, worst week.
The first 48 hours, and what not to throw away
- Make the property safe and stop further damage, but do not begin repairs beyond that until the insurer has had the chance to inspect.
- Photograph and video everything before anything is moved, including ceilings, wall cavities and the contents of cupboards.
- Keep damaged items rather than disposing of them, unless they are a health hazard, because they are the evidence for the contents part of the claim.
- Record the make-safe work that was done, by whom and when, since emergency work is usually treated differently from the repair scope.
- Do not let anyone strip out linings before the insurer's assessor has seen them, because the strip-out is often what determines the accepted scope.
- Write down the date and time of every conversation with the insurer, with the name of the person you spoke to.
- Treat a fire-damaged or flood-affected building as unsafe until someone competent says otherwise, whatever it looks like from the driveway.
How a claim becomes a rebuild
The sequence is fairly consistent regardless of the cause. The claim is lodged and acknowledged; an assessor or loss adjuster inspects; a scope of works is prepared describing what will be repaired and replaced; the insurer accepts or declines the claim in whole or in part; and then either a builder from the insurer's panel is engaged, or the claim is cash settled and you engage your own builder.
The General Insurance Code of Practice puts timeframes around the early part of that sequence. The insurer will tell you within 10 business days of receiving your claim what information it needs, will decide within 10 business days of receiving all of it, and will make a decision within 4 months of receiving the claim, with an extension to 12 months only in defined situations.
The part with no fixed timeframe is the construction itself, and that is where most of the frustration lives. Drying has to finish before rebuilding starts, and it takes as long as it takes. A rebuild that begins over materials that are still wet will produce a second claim within a year, so a builder who insists on moisture readings before closing up walls is protecting you rather than delaying you.
Cash settlement or insurer-arranged repair: the decision that shapes everything
If the insurer arranges the repair through its own builder, the insurer generally carries responsibility for the quality of that work, and the rebuild happens without you having to manage procurement. The trade-off is less control over the builder, the specification and the timetable, and a scope that is written to restore rather than improve.
If you take a cash settlement, you control the builder and the specification, and you can put your own money towards an upgrade at the same time. You also take on the risk that the settlement figure is wrong, that prices move before you build, and that any defect is now a matter between you and a builder you chose. The Code requires an insurer offering a cash settlement under a home building policy to give you information to help you understand how they work and how decisions on them are made, so ask for that document rather than accepting a figure over the phone.
Whichever route you take, the ordinary state licensing, contract and residential building insurance rules still apply to the builder doing the work. Those are set state by state, so confirm the licence class and the required insurance for your own state before signing anything.
Drying, hidden damage and the second claim
Water goes further than it appears to. It travels along the top of a ceiling, down inside a wall cavity, under floor coverings and into the bottom plate of a stud wall, and the visible stain is rarely the extent of it. Fire behaves similarly with smoke and with the water used to put it out; a house with modest fire damage in one room can have smoke residues and water damage through most of the building.
The consequence is that the original scope of works is often incomplete, and the honest response is a variation rather than a quiet decision to build over the problem. Insist on moisture readings rather than a builder's opinion that something feels dry, and make sure the readings are recorded and dated. This is the single most common cause of a repeat claim, and repeat claims are far harder to run than first ones.
Keep an eye on the interaction between the building claim and the contents claim, which are often assessed by different people on different timetables. Items stored in a damaged part of the house tend to fall between the two.
Hazardous materials in a damaged Australian house
Australian houses built before the 1990s commonly contain asbestos materials, and fire, water and impact damage are exactly the events that disturb them. Damaged sheeting, broken eaves linings, disturbed vinyl flooring and fire-affected cladding all have to be identified before a strip-out begins rather than during it, and the removal itself is licensed work governed by each state's work health and safety regulator.
Fire adds its own hazards independent of asbestos: combustion residues on surfaces, damaged wiring that may still be live, and structural elements that have lost capacity without looking different. Flooding adds contamination, particularly where stormwater or sewage is involved, and mould growth that begins within days rather than weeks.
None of this is work to take on yourself while waiting for an assessor. Keep the building secured, keep people out, and let the make-safe contractor and the licensed removalists do their part first. A strip-out done in the wrong order is the fastest way to turn a recoverable claim into a health problem and a dispute at the same time.
After the rebuild: documents, and watching for what was missed
Keep the claim file and the building file together. The scope of works, the variations, the moisture records, the certificates for electrical and plumbing work, the engineering documentation if any structure was repaired, and the warranty information for materials will all matter if something reappears. A defect that surfaces eighteen months later is a very different conversation when you can produce dated moisture readings.
Then watch the building through a full cycle of seasons, because that is when anything missed reveals itself. Staining that returns at a particular junction, a smell that comes back in humid weather, or paint failing in one spot are all worth reporting while the work is still recent. Reporting early is not being difficult; it is how a small rectification stays small.
Fire & Water Damage Renovations: frequently asked questions
How quickly does an insurer have to decide my claim?
Under the General Insurance Code of Practice, the insurer will tell you within 10 business days of receiving your claim what information it needs to make a decision, and will decide within 10 business days of receiving all of that information. Its decision will be made within 4 months of receiving the claim, extending to up to 12 months only in defined circumstances such as a catastrophe, suspected fraud, or where the claimant is not responding.
Should I take a cash settlement or let the insurer rebuild?
It depends on how much control you want and how much risk you are willing to carry. An insurer-arranged rebuild generally puts responsibility for the quality of the work with the insurer and removes the procurement burden from you, at the cost of control over builder and specification. A cash settlement gives you both, along with the risk that the figure is wrong. The Code requires the insurer to give you information explaining how cash settlements work, so ask for it before deciding.
Can I start cleaning up before the assessor arrives?
Make the property safe and prevent further damage, but stop there. Stripping out linings, disposing of damaged contents or beginning repairs before the insurer's assessor has inspected can remove the evidence on which the accepted scope is based. Photograph and video everything first, keep damaged items unless they are a health hazard, and record who did any emergency make-safe work and when.
Who checks that insurers follow the Code?
The Code Governance Committee, which comprises a consumer representative, an industry representative and an independent chair. It investigates alleged breaches, imposes sanctions and publishes an annual public report with aggregate compliance data. The General Insurance Code of Practice is a voluntary code introduced by the Insurance Council of Australia in 1994, and an organisation may adopt it if it is an Insurance Council member, a general insurer, or approved by the Insurance Council.
Why is the builder waiting before closing up the walls?
Because the building is not dry yet, and rebuilding over damp framing or a wet slab produces a second claim within a year. Water travels along ceilings, down wall cavities and into bottom plates well beyond the visible staining, so drying takes longer than it looks like it should. Ask for dated moisture readings rather than an opinion, and treat a builder who insists on them as protecting you rather than stalling.
What about asbestos in a fire or flood damaged house?
Treat it as likely in any Australian house built before the 1990s, and settle the question before any strip-out begins. Fire, water and impact are precisely the events that disturb asbestos materials in sheeting, eaves linings, flooring and cladding. Removal is licensed work governed by your state or territory's work health and safety regulator, and doing it in the wrong order turns a building claim into a health problem. Keep people out until it has been assessed.
Sources
Written by the LokalMatch editorial team. Last reviewed 22 September 2026. How we write and check our guides
Find renovation contractors by city
Australian Capital Territory
Show 1 citiesHide cities
New South Wales
Show 8 citiesHide cities
- Fire & Water Damage Renovations in Central Coast
- Fire & Water Damage Renovations in Newcastle
- Fire & Water Damage Renovations in Sydney
- Fire & Water Damage Renovations in Wollongong
- Fire & Water Damage Renovations in Albury
- Fire & Water Damage Renovations in Coffs Harbour
- Fire & Water Damage Renovations in Maitland
- Fire & Water Damage Renovations in Tweed Heads
Northern Territory
Show 1 citiesHide cities
Queensland
Show 10 citiesHide cities
- Fire & Water Damage Renovations in Brisbane
- Fire & Water Damage Renovations in Gold Coast
- Fire & Water Damage Renovations in Sunshine Coast
- Fire & Water Damage Renovations in Bundaberg
- Fire & Water Damage Renovations in Cairns
- Fire & Water Damage Renovations in Hervey Bay
- Fire & Water Damage Renovations in Mackay
- Fire & Water Damage Renovations in Rockhampton
- Fire & Water Damage Renovations in Toowoomba
- Fire & Water Damage Renovations in Townsville
South Australia
Show 1 citiesHide cities
Tasmania
Show 2 citiesHide cities
Victoria
Show 5 citiesHide cities
What affects the cost of damage repair
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size and scope of the project
- Structural changes, such as moving or removing walls
- Plumbing, electrical and HVAC work involved
- Finishes and materials chosen
- Design, drawings and permits
- Condition of the existing house once it's opened up
- Access to the site and the timeline
How to compare renovation contractors before you hire
- Look for a contractor who has finished projects similar in size and type to yours, and ask to see them.
- Get a written contract with the scope, the payment schedule, the timeline and how changes will be priced.
- Ask who will manage the job day to day and how often you'll get updates.
- Check that they carry liability insurance and workers' compensation coverage, and that their trades are licensed where required.
- Compare quotes on the same scope, and ask what each one leaves out.
- For structural changes, make sure an engineer or designer is involved where needed.
Questions to ask renovation contractors before you hire
- Who will pull the permits, and who will be there for inspections?
- Which parts of the job will you do yourselves, and which will go to subcontractors?
- How do you handle change orders and unexpected problems once walls are open?
- What is the payment schedule, and what is each payment tied to?
- Can you show me proof of liability insurance and workers' compensation coverage?
- What warranty do you offer on your workmanship, and is it in writing?
- Can I speak with a few of your recent clients?
Damage repair permits and local rules
Some damage repair work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingGuides about damage repair
- ✦
Builders guide
In Australia the person who takes on a whole renovation is usually called a builder, and on larger jobs a building contractor or project manager.
Read guide - ✦
Home Renovations guide
A home renovation is work on a house you already own: reworking rooms, replacing what has worn out, opening up a plan that no longer suits the household. Australian housing stock makes that a very wide category.
Read guide - ✦
Whole Home Renovations guide
A whole-home renovation takes the entire house at once: every room stripped back, the plan redrawn, the services renewed and the finishes replaced, often with part of the building demolished and rebuilt.