Exterior Cladding
Exterior Cladding near you
In Australia the word cladding now covers two conversations that have almost nothing to do with each other, and a homeowner searching for a cladding contractor can land in either. The first is ordinary house cladding: weatherboards, fibre cement, plywood sheet, metal profiles, the material on the outside of a Class 1 house. The second is the combustible cladding regime that followed the apartment tower fires, which is about aluminium composite panels and expanded polystyrene on multi-storey buildings, and which is run by state product bans and audit programs rather than by the ordinary building approval process.
Tell us about your cladding project and we’ll help you find local cladding contractors who serve your area.
Free for homeowners · No obligation to hire
On this page
The house conversation is governed by Section 7 of the ABCB Housing Provisions, which deals with timber and composite wall cladding in Part 7.5, and by NCC Volume Two clause H1D7(5), which satisfies the requirement for metal wall cladding designed and constructed in accordance with AS 1562.1. Part 7.5 is concrete about things you can check on site: openings exposed to the weather must be flashed with materials complying with AS/NZS 2904, flashings must extend beyond the reveals and lap in the direction of flow, and there are minimum clearances from the bottom of the cladding to finished ground level.
The apartment conversation is governed by instruments most people have never heard of. In New South Wales, aluminium composite panels with a core of more than thirty per cent polyethylene by mass have been banned in external cladding, external walls, external insulation, facades and rendered finishes on specified classes of Type A and Type B construction buildings, by a notice made under section 9(1) of the Building Products (Safety) Act 2017 and effective from 15 August 2018. Which conversation you are in decides everything that follows.
Working out which cladding problem you have
- A detached house being reclad, extended or repaired: ordinary building work under Section 7 of the Housing Provisions and your state's licensing rules.
- A townhouse or duplex: usually the same as a house, but check the building classification, because it changes which volume of the Code applies.
- An apartment in a multi-storey building with panelled or rendered facade elements: potentially inside a state combustible cladding program, and a body corporate matter rather than an individual one.
- A building where a cladding notice has been issued or registered: the owners corporation, not the individual lot owner, is the party the regulator deals with.
- A shed, carport or garage as a Class 10a building associated with a house: ordinary building work, but on bushfire prone land it is caught by the same bushfire construction requirement as the house.
- Cladding damaged by storm, impact or water on any of the above, where the insurance position and the compliance position have to be answered separately.
What Part 7.5 actually requires on a house
The flashing rules are the ones worth memorising, because they are visible and they are where wind-driven rain gets in. Openings in external wall cladding exposed to the weather must be flashed with materials complying with AS/NZS 2904. Flashings must extend not less than one hundred and ten millimetres beyond the reveals, and must overlap not less than seventy-five millimetres in the direction of flow, with sealant installed between the laps. Note the order in that last requirement: the flashing does the work and the sealant sits between its laps.
Ground clearance is the second checkable rule and the one most often destroyed after the builder leaves. The bottom of the cladding must clear finished ground level by not less than one hundred millimetres in low rainfall intensity areas or sandy, well-drained areas, not less than fifty millimetres above impermeable paved or concreted areas, and not less than one hundred and fifty millimetres in any other case. New paving, a raised garden bed or a load of mulch will breach that clearance in an afternoon.
Behind the face, the drainage and drying arrangement is what keeps the wall dry once water gets past. Part 7.5 requires vapour permeable sarking complying with AS 4200.1 behind vertical and diagonal timber boards, with sheets overlapped not less than one hundred and fifty millimetres or taped together, and fixed to supporting members at not more than three hundred millimetre centres. Cladding is a screen, not a seal.
The aluminium composite panel ban, and who it applies to
New South Wales banned aluminium composite panels with a core comprised of more than thirty per cent polyethylene by mass for use in any external cladding, external wall, external insulation, facade or rendered finish, on buildings of Type A and Type B construction in the specified classes. The instrument is a notice under section 9(1) of the Building Products (Safety) Act 2017, and it took effect on 15 August 2018. That is a product ban, which means it bites on the material regardless of what a particular building approval said at the time.
For a house owner, the direct effect is usually nil: a detached dwelling is not Type A or Type B construction. The indirect effect is not nil. Product bans have made suppliers, certifiers and insurers far more careful about what goes on any external wall, and a proposal to use a composite panel on a house should still come with the manufacturer's evidence of suitability and installation instructions, because a proprietary system outside the deemed-to-satisfy provisions relies on that evidence and nothing else.
For an apartment owner, the effect is the whole story, and it is a body corporate matter. Do not commission work on a facade element in a multi-storey building as an individual lot owner. Ask the owners corporation what the building's cladding status is, whether it has been assessed or registered under the relevant state program, and whether any notice applies to it.
Queensland's combustible cladding checklist, as an example of how these programs work
Queensland ran its program as a staged checklist that owners had to complete, which is a useful illustration because it shows what these schemes actually ask of a building. Part 1 was the owner's registration and initial responses. Part 2 required the owner to engage a building industry professional to assess the building. Part 3 was split: Part 3A required engaging a fire engineer and registering their details, and Part 3B required the fire engineer to prepare an assessment and statement. The final compliance date was 3 May 2021.
Where a cladding fire risk is identified through the checklist, the owner is required to display a Form 42 Affected Private Building Notice, and then to submit a Form 76 Compliance Notice with photographic evidence demonstrating to the QBCC that the notice is appropriately displayed. Although the final compliance date has passed, in-scope private building owners are still required to complete any outstanding checklist obligations.
The general lesson for any owner anywhere in Australia is that a cladding question on a multi-storey residential building is a compliance and documentation exercise with named professionals and named forms, not a quote from a cladding contractor. If someone offers to solve it as a supply-and-fit job, that is the wrong answer to the wrong question.
Choosing cladding for an Australian house
- Timber weatherboards and profiled boards, repairable board by board and covered in detail by Part 7.5, including the minimum laps for different timber species.
- Fibre cement planks and sheet, dimensionally stable, non-combustible and, under Part 3.4 of the Housing Provisions, in the group of materials treated as not subject to termite attack along with steel, aluminium, other metals, concrete and masonry.
- Metal wall cladding, which NCC Volume Two clause H1D7(5) satisfies where it is designed and constructed in accordance with AS 1562.1.
- Plywood and hardboard sheet cladding, used with express joints or battens on contemporary designs, where the joint detail does most of the weathering work.
- Proprietary panel and composite systems outside the deemed-to-satisfy provisions, which rely wholly on the manufacturer's evidence of suitability and installation instructions.
- Render and texture coatings over a lightweight substrate, which Australians call rendering and which is a different trade with a different failure mode.
- Bushfire-compliant assemblies, where the assessed attack level rather than the material in the abstract decides what may be used and how the junctions are made.
What a recladding job should actually involve
Before anything is ordered, establish three site facts: the age of the house, which drives the asbestos question; whether the address is on designated bushfire prone land and at what assessed attack level; and how close it is to salt spray, which drives the fastener and finish specification more than the board choice does.
Then the sequence. The wall is opened up and inspected, damaged framing is replaced rather than covered, the sarking and flashings are installed and lapped so water is directed outwards at every horizontal junction, the cladding is fixed from the bottom up to the specified lap and fixing pattern, and the corners, openings and bottom edge are detailed last. The clearances at the base and the flashings at the openings are the two things worth standing there and watching.
Get the variation terms in writing before work starts. Rot, termite damage and unexpected asbestos are the three discoveries that turn a recladding quote into a negotiation, and none of them can be ruled out from the outside of a wall.
Licensing and approvals for cladding work
Queensland issues roof and wall cladding as a specific QBCC trade class covering selecting and installing roof cladding other than terracotta and concrete tiles, fabricating and installing rainwater goods, flashing penetrations through roofs and walls, and designing, fabricating and installing external flashings, metal ceilings and associated soffits and fascias. A QBCC licence is required for building work above the state threshold, and for plumbing and drainage at any value.
In New South Wales, a contractor licence is required for residential building work above the Home Building Act threshold, and the work has to be under written contract once the price passes the contract threshold, with the deposit capped at ten per cent of the contract price for both small jobs and large jobs. Contracts for large jobs must also set out the cooling-off period of five clear business days.
On the approval side, like-for-like recladding is often treated as maintenance, but changing the wall build-up, altering openings, affecting the structure, working on a heritage item or inside a character overlay, or building on designated bushfire prone land can all bring the work into the approval system. Council or a registered building surveyor answers that for your address, and it is a call worth making before materials are ordered.
Exterior Cladding: frequently asked questions
Is the cladding on my house affected by the combustible cladding bans?
Almost certainly not if it is a detached house. The NSW ban on aluminium composite panels with a core of more than thirty per cent polyethylene by mass applies to specified classes of Type A and Type B construction buildings, which is multi-storey territory, not a Class 1 dwelling. If you live in an apartment, the question goes to the owners corporation rather than to you.
How far above the ground must cladding finish?
Part 7.5 of the Housing Provisions requires not less than one hundred millimetres in low rainfall intensity areas or sandy, well-drained areas, not less than fifty millimetres above impermeable paved or concreted areas, and not less than one hundred and fifty millimetres in any other case. New paving, raised garden beds and mulch are what most often destroy that clearance after the builder has gone.
What flashing should go around my windows?
Part 7.5 requires openings in external wall cladding exposed to the weather to be flashed with materials complying with AS/NZS 2904, with flashings extending not less than one hundred and ten millimetres beyond the reveals and overlapping not less than seventy-five millimetres in the direction of flow, with sealant installed between the laps. The flashing is the weatherproofing; the sealant only closes its laps.
What happened with Queensland's cladding checklist?
Private building owners in scope had to complete a staged checklist: Part 1 registration, Part 2 engaging a building industry professional to assess the building, and Part 3 engaging a fire engineer and obtaining their assessment and statement, with a final compliance date of 3 May 2021. Where a cladding fire risk is identified, the owner must display a Form 42 Affected Private Building Notice and submit a Form 76 Compliance Notice with photographic evidence. Outstanding obligations still have to be completed.
Can I clad over the existing cladding?
It is sometimes proposed, and it has real drawbacks: it hides the condition of the framing, adds thickness that has to be resolved at every opening and corner, and can bury a problem such as damaged timber or asbestos sheet. Ask how the condition of the existing wall was established, how the new system fixes back to the studs, and how water getting behind the new face is drained out.
Does recladding need a licensed contractor?
Above your state's threshold, yes. Queensland issues roof and wall cladding as a specific QBCC trade class and requires a licence for building work above the state threshold. New South Wales requires a contractor licence for residential building work above the Home Building Act threshold, a written contract above the contract threshold, and caps the deposit at ten per cent for both small and large jobs.
Sources
- NCC: ABCB Housing Provisions Part 7.5 Timber and composite wall cladding
- NCC Volume Two Part H1 Structure (H1D7(5) metal wall cladding, AS 1562.1)
- NSW Government: Aluminium composite panel ban
- Safer Buildings Queensland: Building owners and the combustible cladding checklist
- NCC: ABCB Housing Provisions Part 3.4 Termite risk management
- QBCC: Roof and wall cladding licence
- QBCC: Who must hold a QBCC licence
- NSW Government: Guide to providing home building contracts
Written by the LokalMatch editorial team. Last reviewed 22 September 2026. How we write and check our guides
Find cladding contractors by city
Australian Capital Territory
Show 1 citiesHide cities
New South Wales
Show 8 citiesHide cities
Northern Territory
Show 1 citiesHide cities
Queensland
Show 10 citiesHide cities
- Exterior Cladding in Brisbane
- Exterior Cladding in Gold Coast
- Exterior Cladding in Sunshine Coast
- Exterior Cladding in Bundaberg
- Exterior Cladding in Cairns
- Exterior Cladding in Hervey Bay
- Exterior Cladding in Mackay
- Exterior Cladding in Rockhampton
- Exterior Cladding in Toowoomba
- Exterior Cladding in Townsville
South Australia
Show 1 citiesHide cities
Tasmania
Show 2 citiesHide cities
Victoria
Show 5 citiesHide cities
Western Australia
Show 2 citiesHide cities
What affects the cost of cladding
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size of the area and the height of the walls
- Material chosen
- Removal of the existing material
- Repairs needed to what's underneath
- Access, including ladders, scaffolding or lifts
- Trim, corners and openings to work around
How to compare cladding contractors before you hire
- Choose a pro who works regularly with your material, whether that's siding, stucco, brick, eavestroughs or soffit and fascia.
- Ask them to explain what's causing the problem, not only how they'll cover it up.
- Get a written quote that separates removal, repairs to what's underneath and the new finish.
- For chimney and masonry work, look for someone with specific masonry experience rather than a general handyman.
- Check that they carry liability insurance, especially for work on ladders or scaffolding.
Questions to ask cladding contractors before you hire
- What do you think is causing the damage, and will your work fix the cause?
- Will you check the sheathing or wall underneath once the old material is off?
- How will you handle water management, such as flashing, caulking and drainage?
- Does this work need a permit from my municipality, and who will get it?
- Can you show me proof of liability insurance?
- What warranty do you offer on your workmanship?
When to call a pro for cladding
- Gutters that overflow, pull away from the house or drain next to the foundation
- Loose, cracked or bulging siding, stucco or brick
- Crumbling mortar or loose bricks on a chimney
Cladding permits and local rules
Some cladding work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingSeasonal maintenance
This job is part of our home maintenance checklists for:
Free project calculators
Guides about cladding
- ✦
Roofers guide
An Australian roof is designed around wind, sun, driving rain and embers rather than snow load. Sheet metal dominates new work and re-roofing, concrete and terracotta tiles cover a great deal of the older suburban…
Read guide - ✦
Roof Repair guide
Most Australian roof repairs are one of three jobs: stopping a leak, arresting corrosion, or putting right ridge and hip capping that has let go.
Read guide - ✦
Roof Replacement guide
Replacing a roof in Australia is mostly a choice between sheet metal and tile, and it is worth saying plainly that asphalt shingles, the default across North America, are uncommon here.
Read guide
Ready to get cladding quotes?
Tell us about your cladding project.
Do you offer cladding services?
Join LokalMatch to get matched with homeowners in the areas you serve.