Brick Repair
Brick Repair near you
Brick repair is the narrow version of masonry work: a diagonal crack that has opened above a window, a course of fretted bricks at the base of a wall, a bulge in a veneer panel, a run of joints you can rake out with a screwdriver, or a rust stain and a horizontal split over a door. The bricklaying itself is rarely the difficult part. Working out why the bricks failed, on a continent where the usual culprits are ground movement, salt and a bridged damp-proof course, is what separates a repair that holds from one that reappears after the next wet winter.
Tell us about your brick repair project and we’ll help you find local masons who serve your area.
Free for homeowners · No obligation to hire
On this page
Australian walls also fail in a particular geometry. Most eastern states housing is brick veneer, so the brickwork is a skin tied to the frame behind it and a crack tells you about movement rather than collapse. Perth and much of South Australia build double brick, where a crack passes through a wall that is genuinely carrying load. The same crack means different things in the two systems, and the repair differs accordingly.
This guide covers reading cracks before paying for cosmetic patching, matching brick and mortar on a weathered wall, repointing, what to do about fretting and rising damp, and the licence classes that cover the work. New walls, ties, lintels and the Code's requirements for building masonry are covered on the masonry page.
What to look at before you call anyone
- Stepped cracks following the mortar joints, which usually mean movement, and cracks running straight through the bricks themselves, which usually mean more of it.
- A crack that is wider at the top than the bottom, or the reverse, which tells the assessor which way the ground has moved.
- Mortar that has gone sandy and can be raked out by hand, especially in the lowest few courses.
- Brick faces fretting, powdering or flaking away near the ground, behind a downpipe or on the side that stays wet.
- A tide mark, blown paint, crumbling skirtings or salt crystals on the inside face of an external wall, which points at rising damp rather than a leak.
- A rust stain and a horizontal crack above a window or door, the signature of a corroding steel lintel expanding in place.
- A veneer panel that bulges, sounds hollow or has moved away from the frame, which is a wall tie problem and is not fixed by pointing.
- Weepholes that have been painted, rendered, mortared or landscaped shut along the bottom of the wall.
Reading a crack in an Australian brick wall
Start with the ground, because in Australia that is usually where the answer is. Sites are classified in accordance with AS 2870, and the classes run from Class A, most sand and rock sites with little or no ground movement from moisture changes, through slightly, moderately and highly reactive clay to Class E extremely reactive clay, and Class P for problem sites including soft clay or silt, loose sands, landslip, mine subsidence and collapsing soils. A house on a moderately or highly reactive site moves seasonally, and the brickwork cracks where the movement concentrates: at the corners of openings, at changes in wall height, and at the ends of long unjointed runs.
Then look for what should have absorbed that movement. The Housing Provisions require vertical articulation joints at not more than 6 metre centres in straight walls, at least 10 millimetres wide, filled with a flexible sealant on a backer rod or compressible foam support, and located within 300 millimetres of vertical supports. Where the joint is missing, painted over or packed with hard mortar, the wall makes its own joint, and it does so where the brickwork is weakest rather than where a designer would have chosen. Before agreeing to a cosmetic repair, ask where the articulation joints are and whether one should be cut into the wall as part of the work.
Distinguish between cracks that are still moving and cracks that have stopped. Photograph each one with a rule beside it and the date recorded, note the season, and look again after the next long dry spell and the next wet one. Movement that continues, or is accompanied by doors and windows binding, floors going out of level or a crack that follows through the slab or footing, is a structural question for an engineer and not a bricklaying one. Repairing brickwork over ground that is still moving buys a season and then returns.
Repairing brick veneer and repairing double brick
In brick veneer the brickwork is a skin. It is tied to a frame that carries the roof and floors, the cavity behind it is a drainage space of not less than 25 and not more than 75 millimetres, and the wall relies entirely on its ties, which must comply with AS 2699.1 at a duty rating suited to the site's wind speed and be spaced at not more than 600 millimetres horizontally and vertically. So a bulging veneer panel is a tie failure and needs remedial ties installed, not repointing, and cutting out bricks near the bottom of the panel is the moment to check that the cavity is clear and the weepholes are open.
In cavity masonry, the Perth and Adelaide double brick pattern, both leaves are masonry, each not less than 90 millimetres wide, with a cavity of not less than 35 and not more than 75 millimetres and medium duty ties in aligning bed joints at a vertical spacing of not more than 300 millimetres. A crack here passes through a loadbearing element, so its width, its path and whether it goes through both leaves all matter more. Repairs are also harder to hide, because the outer leaf cannot simply be taken off and relaid without dealing with the wall as a structure.
What both systems share is a dependence on drainage and separation rather than on being waterproof. Water gets into brickwork, runs down the back face and is meant to leave through weepholes a minimum of 50 millimetres high, spaced at not more than 1.2 metre centres, above a damp-proof course that is continuous through the wall and visible from the outside face. Any repair that blocks that path, including a well-meant render skirt at the base of the wall, moves the problem inside.
Cutting out bricks, repointing and keeping the dust down
A competent repair starts with the cause and only then touches the brick. Damaged units are cut out by removing the surrounding mortar and breaking the brick out in pieces so the neighbouring units and any wall ties are not disturbed, the opening is cleaned, the replacement is bedded in fresh mortar and the joints are tooled to match the profile of the wall. Repointing follows the same discipline: rake the joint back to sound mortar to a consistent depth without widening it or chipping the arrises, then refill in layers and tool to match. A grinder run along a joint by someone in a hurry leaves a wall with wider, harder joints than it started with and a row of damaged brick edges.
Access and dust are the two safety items that belong on the quote. Anything above the ground floor needs a scaffold or an elevated work platform and a crew trained to work at height, and cutting and grinding masonry releases respirable crystalline silica, so expect on-tool dust extraction or water suppression, respiratory protection and exclusion of the area rather than a broom afterwards. Keep windows shut, move the washing, and keep children and pets away from the work zone.
Ask for evidence at the end. Photographs of what was behind the wall, of the ties or the damp-proof course where they were exposed, and of the joint before and after, are worth more than a line on an invoice saying the brickwork was repaired. If the wall is likely to move again, that record is what lets the next assessment start from something better than guesswork.
Matching brick and mortar without wrecking the wall
Matching is harder in Australia than people expect because brick sizes, colours and textures have shifted between eras and between brickworks, and a wall weathers. Second-hand units of the same period, or bricks taken from a concealed location such as a wall behind a carport or under a later extension, usually blend better than anything new. Where new units are used, they should suit the exposure: the Code's durability classifications run from Protected through General Purpose to an Exposure class for severe conditions including salt attack and salt spray, and a coastal repair specified as general purpose will fret again.
Mortar is where repairs most often do lasting harm. The mix is meant to be the sacrificial element, softer than the units it holds, and the Housing Provisions set mixes by volume against AS 3700 or AS 4773 with different cement, lime and sand proportions for protected, general purpose and exposure conditions. Repointing an old, soft brick wall with a hard, cement-rich mortar drives moisture and stress into the bricks instead, and the faces come away along the new joints. On heritage and character brickwork the right answer is usually a lime-rich mix chosen after examining what is already there, and the joint profile and width should be reproduced rather than improved.
Colour is the last step, not the first. Mortar dries lighter than it looks when wet and keeps changing as it cures, so a careful tradesperson mixes small trial batches with different sands, lets them cure and compares them against the existing joints in daylight before starting on the wall. Expect a patch to be visible for a season or two even when it is done well.
Licences that cover brick repair
Repair work is licensed the same way new work is. In New South Wales, bricklaying means erecting structures such as buildings by putting together individual masonry units known as bricks or blocks, and covers brick fences, retaining walls, associated flashing and minor supporting concreting; residential building and trade work above the Home Building Act value threshold requires a contractor licence, and the penalties for unlicensed work are substantial for individuals and larger again for companies. Queensland requires a QBCC licence for building work above its threshold, with bricklaying and blocklaying and stonemasonry issued as separate trade classes, and requires a licence for plumbing and drainage at any value, which can matter when the real fix is where the stormwater goes. Western Australia registers building practitioners and contractors through the Building Services Board, supported by Building and Energy, under the Building Services (Registration) Act 2011.
A building approval is a separate question from a licence, and it is answered locally. Replacing damaged bricks like for like is usually treated as repair, while rebuilding a wall, altering openings, changing the appearance of a property in a heritage or character overlay, or touching a retaining structure can bring the work into the approval system. Your council or a registered building surveyor gives the answer for your address, and it is a cheaper phone call before the scaffold goes up than after.
LokalMatch is where finding someone starts. You describe the brick problem once, including whether the house is brick veneer or double brick, its approximate age, where the cracking or fretting is, what the ground is like and whether anything has recently changed outside such as new paving or a leaking pipe, and matched bricklayers contact you directly. They pay for the requests they receive. LokalMatch does not carry out repairs, does not set prices and does not vet, rank or recommend anyone, so the licence check stays with you.
Keeping a repaired wall repaired
- Restore the clearance the Code requires above ground rather than burying the damp-proof course again with new paving, turf or a garden bed.
- Clear and keep clear every weephole along the base of the wall and above openings, and tell the landscaper what they are for.
- Water garden beds evenly around the house, since soaking one elevation on reactive clay is the fastest way to reopen a crack.
- Fix leaking taps, downpipes and stormwater lines near footings first, because they change soil moisture locally and continuously.
- Renew the sealant in articulation joints as it ages instead of letting the joints be painted or mortared shut.
- Deal with rust above windows and doors before the crack widens, since a corroding lintel keeps expanding.
- Keep high-pressure water and abrasive blasting away from old brickwork, which strips the fired face and speeds up fretting.
- Re-inspect after the first heavy rain and again after the next long dry spell, which is when a repair either holds or tells you the cause is still active.
Brick Repair: frequently asked questions
Is a stepped crack in my brickwork serious?
It depends on whether it is still moving and on what kind of wall it is. Photograph it with a rule and the date, then look again after a long dry spell and after heavy rain. Cracks that keep growing, run through bricks as well as joints, or come with binding doors and uneven floors need assessment before any repair. Much Australian cracking traces back to reactive clay sites classified under AS 2870 and to missing or blocked articulation joints.
Why are the bricks at the bottom of my wall crumbling?
Usually salt, moisture or both. Fretting units and sandy mortar low on a wall point to salt attack, which the Code's exposure durability classification exists to resist, and to a damp-proof course that has been bridged by paving, render or a garden bed. Replacing the bricks without restoring the separation and the drainage path means doing it again.
Can a single damaged brick be replaced?
Yes. The mortar around it is cut out, the brick is broken out in pieces so the neighbours and any wall ties are not disturbed, and a matching unit is bedded in and the joints tooled to match. Deal with the water or movement that damaged it first, and expect a new unit specified for the exposure rather than simply the nearest colour.
My brick veneer wall is bulging. Is repointing enough?
No. A bulge in veneer is a wall tie problem, and ties are what hold the single leaf to the frame behind it. They must comply with AS 2699.1 at a duty rating chosen for the site's wind speed and be spaced at not more than 600 millimetres horizontally and vertically. The remedy is remedial ties designed for the wall, not mortar in the joints.
Should I seal or waterproof my brickwork after repairs?
Be careful. Australian brick walls are designed to let water drain and dry, through a cavity of not less than 25 millimetres behind veneer and out through weepholes at not more than 1.2 metre centres above the damp-proof course. A coating that closes that path traps moisture and salts behind the face, which is exactly the mechanism that causes fretting. Fix the cause, keep the drainage path open, and take advice before coating anything.
Do I need a licensed tradesperson to replace a few bricks?
Above your state's value threshold, yes. New South Wales requires a contractor licence for residential building or trade work above the Home Building Act threshold and defines bricklaying as its own licensed trade, and Queensland requires a QBCC licence above its threshold with bricklaying and blocklaying as a distinct class. Look the licence up on the regulator's public register before you pay a deposit.
Sources
- NCC: ABCB Housing Provisions Part 4.2 Footings, slabs and associated elements (AS 2870 site classification)
- NCC: ABCB Housing Provisions Part 5.2 Masonry veneer
- NCC: ABCB Housing Provisions Part 5.6 Masonry components and accessories (ties, mortar, articulation joints)
- NCC: ABCB Housing Provisions Part 5.7 Weatherproofing of masonry (damp-proof courses and weepholes)
- NSW Government: Bricklaying work licences
- NSW Government: General building work licences
- QBCC: Bricklaying and blocklaying licence
- QBCC: Who must hold a QBCC licence
- Western Australian Government: Builders' registration
Written by the LokalMatch editorial team. Last reviewed 14 September 2026. How we write and check our guides
Find masons by city
Australian Capital Territory
Show 1 citiesHide cities
New South Wales
Show 8 citiesHide cities
Northern Territory
Show 1 citiesHide cities
Queensland
Show 10 citiesHide cities
South Australia
Show 1 citiesHide cities
Tasmania
Show 2 citiesHide cities
Victoria
Show 5 citiesHide cities
Western Australia
Show 2 citiesHide cities
What affects the cost of brick repair
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size of the area and the height of the walls
- Material chosen
- Removal of the existing material
- Repairs needed to what's underneath
- Access, including ladders, scaffolding or lifts
- Trim, corners and openings to work around
How to compare masons before you hire
- Choose a pro who works regularly with your material, whether that's siding, stucco, brick, eavestroughs or soffit and fascia.
- Ask them to explain what's causing the problem, not only how they'll cover it up.
- Get a written quote that separates removal, repairs to what's underneath and the new finish.
- For chimney and masonry work, look for someone with specific masonry experience rather than a general handyman.
- Check that they carry liability insurance, especially for work on ladders or scaffolding.
Questions to ask masons before you hire
- What do you think is causing the damage, and will your work fix the cause?
- Will you check the sheathing or wall underneath once the old material is off?
- How will you handle water management, such as flashing, caulking and drainage?
- Does this work need a permit from my municipality, and who will get it?
- Can you show me proof of liability insurance?
- What warranty do you offer on your workmanship?
When to call a pro for brick repair
- Gutters that overflow, pull away from the house or drain next to the foundation
- Loose, cracked or bulging siding, stucco or brick
- Crumbling mortar or loose bricks on a chimney
Brick repair permits and local rules
Some brick repair work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingSeasonal maintenance
This job is part of our home maintenance checklists for:
Free project calculators
Guides about brick repair
- ✦
Roofers guide
An Australian roof is designed around wind, sun, driving rain and embers rather than snow load. Sheet metal dominates new work and re-roofing, concrete and terracotta tiles cover a great deal of the older suburban…
Read guide - ✦
Roof Repair guide
Most Australian roof repairs are one of three jobs: stopping a leak, arresting corrosion, or putting right ridge and hip capping that has let go.
Read guide - ✦
Roof Replacement guide
Replacing a roof in Australia is mostly a choice between sheet metal and tile, and it is worth saying plainly that asphalt shingles, the default across North America, are uncommon here.
Read guide
Ready to get brick repair quotes?
Tell us about your brick repair project.
Do you offer brick repair services?
Join LokalMatch to get matched with homeowners in the areas you serve.