Generator installation covers two different projects that get asked about in the same phone call. One is a permanently installed standby generator: a unit on a pad outside, fed from natural gas or propane, wired to an automatic transfer switch that senses the outage, starts the engine and moves selected circuits over without anyone being home. The other is making a portable generator safe and useful, which means an inlet on the outside wall and a transfer switch or a listed panel interlock so the machine can feed circuits instead of a spaghetti of extension cords.

Tell us about your generator installation project and we’ll help you find local electricians who serve your area.

Free for homeowners · No obligation to hire

This type of work often has to be done by a licensed or certified trade. Ask to see licences and proof of insurance before work starts.
On this page

The reason this work belongs to licensed trades is not paperwork. Portable generators produce carbon monoxide at rates the Consumer Product Safety Commission puts on the order of hundreds of times those of a gasoline-powered car, and in the Federal Register record for its portable generator rulemaking the Commission counted at least 1,332 CO-related consumer deaths involving portable generators from 2004 through 2021, an average of about 74 lives lost a year, with generator-related CO deaths averaging 85 a year across 2017 through 2019. Almost all of it comes from running the machine somewhere it should never be run.

Through LokalMatch you describe the house, what you need to keep running, whether you already own a generator and your ZIP code, and electricians and generator installers who serve your area contact you. Pros pay for the requests they take. LokalMatch does not install generators, does not set prices and does not vet, rank or recommend anyone, so ask for the state licence number and confirm that a permit and inspection are part of the job.

Carbon monoxide: the rule that matters more than every other rule here

CPSC's guidance on portable generators is absolute and leaves no room for the usual improvisations. Never run a generator in the home, garage or crawlspace, and understand that opening doors and windows or using fans will not prevent carbon monoxide from building up in the house. Running a generator in an attached garage can cause fatal poisoning indoors, and so can running one in a basement, a crawlspace or a living area. A generator that is outdoors but too close is still dangerous, which is why the instruction is to operate it away from open doors, windows and vents that could let exhaust indoors.

The distance is not a matter of taste. Ready.gov's guidance for power outages is that generators and fuel should always be used outdoors and at least 20 feet away from windows, doors and attached garages, with working carbon monoxide detectors on every level of the home. The US Fire Administration makes the same point from the fire service side, telling people to use portable generators outdoors in well-ventilated areas away from all doors, windows and vents, and noting that more than 150 people in the United States die every year from accidental non-fire carbon monoxide.

If anyone in the house develops symptoms, treat it as the emergency it is rather than as flu. CPSC's advice is to get fresh air immediately, leave the home and call for assistance from a neighbor's home, because you could lose consciousness and die from CO poisoning if you stay inside. Get medical attention immediately, tell the medical staff that CO poisoning is suspected, and call the fire department to determine when it is safe to re-enter.

  • Never indoors, and never in an attached garage, a basement, a crawlspace or a shed, whatever the weather is doing outside.
  • Outdoors and at least 20 feet from windows, doors and attached garages, with the exhaust directed away from the house.
  • Working carbon monoxide alarms on every level of the home, tested before storm season rather than during the outage.
  • Keep the generator dry and protected from rain or flooding; touching a wet generator or something connected to one can cause electric shock.
  • Let the engine cool before refueling, because fuel spilled on hot engine parts can ignite.
  • Store fuel outdoors in approved containers, away from the house and away from any fuel-burning appliance.

Standby or portable: two very different installations

  • Automatic standby generator: permanently mounted outside, connected to natural gas or propane, started automatically by an automatic transfer switch, and sized to a defined set of circuits or to most of the house.
  • Portable generator with a permanent inlet: a weatherproof power inlet, a cord rated for the load, and a transfer switch or listed interlock at the panel, so the machine can feed circuits safely when somebody is there to run it.
  • Portable generator used with cords only: no connection to house wiring at all, with appliances connected directly, which Ready.gov pairs with the instruction to use heavy-duty extension cords.
  • Inverter generators, quieter and more suitable for electronics, which still produce carbon monoxide and are governed by exactly the same siting rules.
  • Battery storage as an alternative or a complement, which produces no exhaust and needs no refueling but is sized in a completely different way.
  • Fuel choice: natural gas avoids refueling but depends on the gas service staying up, propane needs a tank sized for the outage you expect, and gasoline needs storage and rotation.

Transfer switch, interlock, or nothing at all

The purpose of transfer equipment is to make it physically impossible for the generator and the utility to feed the same wiring at the same time. A transfer switch, manual or automatic, moves the selected circuits from one source to the other. A listed panel interlock does the same job mechanically, by preventing the main breaker and the generator breaker from being closed together. The third option, feeding a generator into a receptacle with a double-ended cord, is not a method; it defeats that separation and it is why the permanent connection is electrical work with a permit behind it.

American code treats a standby generator as a system that has to announce itself, because the next person to open the service equipment may not know it is there. Washington's adoption of the National Electrical Code requires that the signs called for in NEC 702.7(A) be placed where required and also at the meter base when the meter base is not within sight and within five feet of where the sign is required, and adds a further placement rule where the disconnecting means required by NEC 230.85 is not present. Article 702 covers optional standby systems and Article 705 covers interconnection, and your jurisdiction enforces whichever NEC edition it has adopted.

Choosing between a transfer switch and an interlock usually comes down to the panel. An interlock kit must be listed for that specific panel, which rules it out on some equipment, while a transfer switch or a small transfer subpanel works with almost anything and makes the backed-up circuits explicit. Ask the electrician to walk you through which circuits will be live, what the generator can actually carry when the well pump and the furnace start together, and what will happen if someone switches on the wrong thing during an outage.

Sizing, siting and what happens on installation day

Sizing starts with a list, not a square footage. The electrician establishes what must keep running, generally heating and its controls, a sump or well pump, refrigeration, a few lighting and receptacle circuits and any medical equipment, then accounts for motors drawing far more at startup than while running. That list decides both the generator and the transfer equipment, and it is where an honest installer will tell you that a smaller unit with a well-chosen circuit list beats a larger one that nobody maintains.

Siting is where the carbon monoxide rules become a design constraint rather than a warning label. The unit goes outdoors, clear of doors, windows, vents and air intakes, on a stable base above the level where water collects or snow piles, with the clearances the manufacturer specifies for service and airflow. Local rules commonly add setbacks from property lines and noise limits, and for a gas-fired standby unit the fuel connection is separate work by whoever is licensed for gas in your state, sized so the meter or tank can serve the generator alongside everything else.

The installation itself usually spans a pad or base, the generator, the transfer equipment at or beside the panel, the fuel connection, the control wiring, labels and signage, then an inspection before the system is commissioned and tested under load. Ask to be shown the monthly or weekly exercise setting, the manual transfer procedure for the day the automatic function fails, and where the fuel shutoff is. Ask for the permit and the signed inspection record at the end, and keep them with the house papers.

CO shutoff technology, the warning label the law requires, and where the federal rule stands

There is one federal rule in force specifically about portable generators, and it is about warning you. Part 1407 of title 16 of the Code of Federal Regulations requires manufacturers to put a carbon monoxide poisoning hazard label on the product and on the package, with the signal word DANGER in letters not less than 0.15 inch high, and it applies to any generator manufactured or imported on or after May 14, 2007. The same part defines a portable generator as an internal combustion engine-driven electric generator rated no higher than 15 kilowatts and 250 volts, intended to be moved for temporary use where utility-supplied power is not available.

The engineering answer to the hazard sits in voluntary standards that newer machines are built to. Following its 2016 proposal, CPSC's rulemaking record notes that Underwriters Laboratories published UL 2201, covering the carbon monoxide emission rate of portable generators, in January 2018, and that the Portable Generator Manufacturers Association published ANSI/PGMA G300-2018 in April 2018. Under the shutoff criteria described in that record, a CO sensor must shut the generator down before the concentration measured one to two inches above the center of the machine's top surface exceeds 400 parts per million by volume as a ten-minute rolling average, or 800 parts per million by volume instantaneously, and the system must be tamper resistant.

Whether all of this becomes mandatory is still open. CPSC issued a supplemental notice of proposed rulemaking for a Safety Standard for Portable Generators in 2023, and the Commission's regulatory agenda published in the Federal Register in August 2026 still lists that standard, under regulation identifier 3041-AC36, at the final rule stage rather than as a rule in force. When buying, ask whether the model meets UL 2201 or ANSI/PGMA G300, and treat that as a useful feature rather than as a substitute for the siting rules, which apply to every generator regardless.

Licensing, permits and inspection for backup power

Connecting any generator to house wiring is licensed electrical work, and the licence is issued by your state rather than by any federal body. Texas requires anyone who performs, or offers to perform, non-exempt electrical work to be licensed and to perform that work through a licensed electrical contractor. Other states license the contracting business, the individual, or both. Ask for the number, verify it with the board, and ask separately who holds the gas credential if the unit burns natural gas or propane, because that is usually a different trade and sometimes a different company.

Expect a permit and an inspection. The work touches the service equipment, adds a second source of supply and requires identification signage under the standby and interconnection articles of the National Electrical Code as adopted in your state, all of which an inspector exists to check. If a quote is noticeably cheaper than the others and does not mention a permit, that is usually the difference rather than efficiency. Unpermitted work on service equipment has a way of resurfacing during a sale or an insurance claim.

Finally, ask about the utility. A standby generator that is properly isolated by transfer equipment is not an interconnection in the sense that solar is, but utilities have their own requirements and your installer should know them. Washington's rule that an interconnection to the utility distribution network must consult the serving utility and meet all additional utility standards is a good reminder that the utility's word governs anything touching its network.

Getting ready before the storm rather than during it

  • Test the system under load before the season you expect outages in, not on the evening the power fails.
  • Check that carbon monoxide alarms on every level are working and are not past their replacement date.
  • Confirm fuel: propane tank level, stored gasoline that is fresh and in approved containers, and whether your gas service is likely to stay up in the events you are planning for.
  • Keep the area around the unit clear of snow, leaves and stored belongings so airflow and service access are not blocked.
  • Write the manual transfer procedure on a card and keep it at the panel, because the person who has to use it may not be the person who watched the commissioning.
  • During an outage, turn off or disconnect appliances and electronics, since Ready.gov warns that power can return with momentary surges or spikes that cause damage.
  • Plan refueling in daylight, and never refuel a hot engine.

Generator Installation: frequently asked questions

How far from the house does a portable generator have to be?

Ready.gov's guidance is that generators and fuel should always be used outdoors and at least 20 feet away from windows, doors and attached garages, with working carbon monoxide detectors on every level of your home. CPSC adds that a generator must never run in the home, garage or crawlspace, and that opening doors and windows or using fans will not prevent carbon monoxide from building up indoors. Direct the exhaust away from the house, and follow the manufacturer's instructions as well.

Why can't I just plug a generator into an outlet?

Because nothing then separates your generator from the utility's wiring, and that separation is the whole point of transfer equipment. A transfer switch or a listed panel interlock makes it physically impossible for both sources to feed the house at once, which is why a permanent connection is licensed electrical work with a permit and an inspection behind it. If you are using a portable generator without transfer equipment, connect appliances directly with heavy-duty extension cords instead.

Is a standby generator worth it compared with a portable one?

It depends on how long your outages last, whether someone is always home to set up and refuel a portable unit, and what the house depends on, such as a sump pump, a well pump or medical equipment. A standby unit runs unattended on a fixed fuel supply and transfers automatically. A portable unit with an inlet and a transfer switch costs less and covers less, and needs somebody outside in the weather to start and refuel it.

Do newer generators have carbon monoxide shutoff?

Many do, built to voluntary standards: UL 2201, covering the carbon monoxide emission rate of portable generators, and ANSI/PGMA G300-2018. In CPSC's rulemaking record, the shutoff criteria require the sensor to stop the engine before carbon monoxide measured just above the machine exceeds 400 parts per million by volume over a ten-minute rolling average or 800 instantaneously. Ask which standard a model meets, and keep following the siting rules regardless, because the feature reduces risk rather than removing it.

Does a generator installation need a permit?

A permanent connection to house wiring normally does, because it touches the service equipment and adds a second source of supply, and the work has to be identified with the signage required by the standby and interconnection articles of the National Electrical Code as your state has adopted them. Ask your local building department before the work, ask who files the permit, and keep the signed inspection record with your house documents.

What size generator do I need?

Start from a list of what must keep running rather than from the size of the house, and let the electrician add the starting loads of motors, which briefly draw much more than their running load. That list drives both the generator and the transfer equipment. Ask to see the calculation, and ask what happens if the furnace, the refrigerator and a pump all start within the same few seconds, because that is the moment an undersized system reveals itself.

Sources

  1. CPSC: Carbon Monoxide — The Invisible Killer (Publication 464)
  2. Ready.gov: Power Outages — generator safety
  3. US Fire Administration: Carbon Monoxide Poisoning Prevention
  4. Federal Register: Safety Standard for Portable Generators, supplemental notice of proposed rulemaking (2023)
  5. 16 CFR part 1407: Portable Generators — labeling requirements (govinfo)
  6. Federal Register: CPSC Regulatory Agenda, August 2026 (RIN 3041-AC36 at final rule stage)
  7. WAC 296-46B-702: Optional standby systems (NEC 702 signage)
  8. Texas Department of Licensing and Regulation: Electricians

Written by the LokalMatch editorial team. Last reviewed September 14, 2026. How we write and check our guides

Find electricians by city

California

Show 186 cities

Florida

Show 82 cities

Texas

Show 79 cities

What affects the cost of generator installation

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Type and amount of work, from a single fixture to a full rewire
  • Condition and age of the existing wiring
  • Panel and service capacity
  • Distance from the panel to the new circuit
  • Access through finished walls and ceilings
  • Permits and inspections

How to compare electricians before you hire

  • Hire a licensed electrician or electrical contractor for any wiring, panel or new circuit work.
  • Ask whether the work needs a permit and inspection, and make sure the electrician arranges it.
  • Get a written quote that lists fixtures, materials, patching of walls and ceilings, and permit costs.
  • For panel upgrades and EV chargers, ask them to check whether your electrical service can handle the added load.
  • Choose someone who explains what they found in plain language before starting.

Questions to ask electricians before you hire

  • Are you licensed for electrical work in my area?
  • Will you get the permit and arrange the inspection?
  • Can my current panel and service handle this work?
  • Will you need to open walls or ceilings, and who patches them afterwards?
  • Is the price fixed, or could it change once you see the existing wiring?
  • What warranty do you offer on your work?

When to call a pro for generator installation

  • Burning smells, scorch marks or warm outlets and switches: turn off the circuit at the panel if it's safe to do so and call an electrician.
  • Breakers that trip again and again
  • Flickering or dimming lights that aren't fixed by changing the bulb
  • Any sparking, buzzing or exposed wiring

Generator installation permits and local rules

Some generator installation work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Ready to get generator installation quotes?

Tell us about your generator installation project.

Do you offer generator installation services?

Join LokalMatch to get matched with homeowners in the areas you serve.