Skip to content
LokalMatch

Demolition

Demolition near you

Demolition covers a wide range of work: stripping a house back to studs before a remodel, taking down a garage or an addition, removing a chimney, and razing an entire building to the slab. What the jobs share is that most of the cost and nearly all of the regulation sit before and after the machine work. Deciding what is in the walls, getting the utilities properly disconnected, notifying the people who have to be notified, and dealing with what comes out are the project. EPA estimated that 600 million tons of construction and demolition debris were generated in the United States in 2018, and where all of that goes is a question your contract should answer.

Tell us about your demolition project and we’ll help you find local demolition contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

The federal workplace rule is a good summary of what a competent demolition contractor does first. Before employees start demolition operations, an engineering survey must be made by a competent person of the structure to determine the condition of the framing, floors and walls, and the possibility of unplanned collapse of any portion of the structure, with any adjacent structure where employees may be exposed similarly checked, and the employer must have written evidence that the survey was performed. All electric, gas, water, steam, sewer and other service lines must be shut off, capped or otherwise controlled outside the building line before demolition work is started, and any utility company involved must be notified in advance.

Licensing is a state question here as everywhere. California's definition of a contractor expressly includes anyone who wrecks or demolishes a building, and Florida's covers a person who for compensation undertakes to demolish a building or structure.

Interior strip-out, selective demolition, teardown and deconstruction

These are different products with different rules, and asking for the wrong one is a common way to overpay. Deconstruction in particular is a distinct trade: Portland requires that if you plan to tear down a house or duplex in the city, the structure must be deconstructed rather than mechanically demolished if it was built in 1940 or earlier, or if it was designated as a historic resource subject to demolition review or the city's delay provisions, and states that only certified deconstruction contractors can deconstruct your house.

  • Interior strip-out: finishes, cabinets, fixtures and non-structural partitions removed back to framing, leaving the structure and shell intact.
  • Selective demolition: specific elements removed within a working building, which needs shoring, dust control and protection of everything staying.
  • Structural demolition: removing part of the structure, such as a wall, a floor or a chimney, which requires a design for what holds up the rest.
  • Detached accessory demolition: garages, sheds, decks and carports, usually permitted but simpler than a house.
  • Full demolition to the foundation, where the slab, footings and basement walls may stay or go depending on what is built next.
  • Full demolition including foundation removal and backfill, which brings compaction and fill quality into the scope because something will be built on it.
  • Deconstruction: dismantling by hand to salvage materials for reuse, slower and often required by ordinance for older houses.

Permits, notice to neighbors and the delay you did not budget for

A demolition permit is separate from a building permit and is issued on its own terms. Portland's rule is simple to remember: you need a demolition permit for any structure that needed a permit to be built, including structures that were improperly built without one. Seattle likewise treats demolition as permitted work. The permit is not a formality, because in many cities it carries a timetable attached to it.

Portland is a useful illustration of how long that timetable can be. There is a mandatory 35-day delay for demolishing a one- or two-family dwelling structure where the dwelling is designated residential by the Comprehensive Plan Map, which does not apply to residential structures in commercial or industrial zones or to garages and accessory structures. The city mails notice to properties within 150 feet within five business days of receiving the application, and the applicant must place door hangers on all properties within 300 feet between two weeks and 72 hours before demolition begins. The permit will not issue until the site controls form, the asbestos survey and the close-out letter are submitted.

Licensing applies to the work itself. California's licensing statute defines a contractor to include a person who undertakes, offers to undertake, or does by or through others, work to wreck or demolish any building or structure, and Florida's definition of contractor covers a person who for compensation undertakes to, submits a bid to, or does by others demolish a building or structure. Check the state licensing authority where your property is before agreeing to anything, and ask which class of license covers demolition there.

Asbestos before demolition: what federal law covers and where it stops

The federal asbestos standard for demolition and renovation is a real obligation with real notice requirements, and it is also narrower in residential work than contractors sometimes suggest. It applies to a facility, and the regulation defines a facility as any institutional, commercial, public, industrial or residential structure, installation or building, including any structure, installation or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units. A single-family house, a duplex, a triplex or a fourplex standing alone is therefore generally outside the federal scheme. The rule also defines an installation as any building or structure, or any group of buildings or structures, at a single demolition or renovation site that are under the control of the same owner or operator, which is why EPA states that the asbestos national emission standards apply to most demolition projects conducted by municipalities, counties and land banks.

Where the rule does apply, two duties matter to an owner. Prior to the commencement of the demolition or renovation, the owner or operator must thoroughly inspect the affected facility or part of the facility where the work will occur for the presence of asbestos, including Category I and Category II nonfriable asbestos-containing material. And notification is required even when there is very little asbestos or none: in a facility being demolished, where the combined amount of regulated asbestos-containing material is below the thresholds of 260 linear feet on pipes, 160 square feet on other facility components and 35 cubic feet off facility components, the notification requirements still apply, with notice required 10 working days before demolition begins. Where a state or local government has ordered a demolition because the facility is structurally unsound and in danger of imminent collapse, notice must be given as early as possible before, but not later than, the following working day.

The honest conclusion for a homeowner is that the federal exclusion for small residential buildings is not the end of the inquiry, because states routinely go further. Oregon requires that prior to demolition of a residence constructed prior to 2004 you hire an accredited inspector to conduct an asbestos survey, and although Oregon lets homeowners handle asbestos-containing material in their own primary residence during a renovation, owner-occupants are not allowed to perform friable asbestos abatement for demolition projects: friable material must be removed by a DEQ licensed asbestos abatement contractor before the demolition. Cities can require proof of the survey and of abatement before a permit issues, as Portland does. Ask your state air quality agency and your building department what applies at your address, and never accept a verbal assurance that a house is too small to be regulated.

What the federal demolition rules require before anyone starts

The construction safety standard for demolition is worth reading as a checklist for choosing a contractor, because a company that does these things is a different company from one that does not.

  • A written engineering survey by a competent person, of the framing, floors and walls and the possibility of unplanned collapse, with adjacent structures where workers may be exposed checked too.
  • Shoring or bracing of walls or floors where employees must work inside a structure damaged by fire, flood, explosion or other cause.
  • All electric, gas, water, steam, sewer and other service lines shut off, capped or otherwise controlled outside the building line before work starts, with the utility notified in advance.
  • Any utility that must remain live during the work temporarily relocated as necessary and protected.
  • Determination of whether hazardous chemicals, gases, explosives or flammable materials were used in pipes, tanks or equipment on the property, with testing, purging and elimination of the hazard before demolition starts where such substances are apparent or suspected.
  • Removal of fragmentation hazards from glass, and protection of wall openings where workers could fall through.
  • Floor openings not used as material drops covered with material able to support any load imposed, and secured against accidental movement.
  • Demolition of exterior walls and floors beginning at the top of the structure and proceeding downward, story by story.

Lead paint, dust and the pre-1978 house

Any house built before 1978 should be assumed to contain lead paint until tested, and the dust generated by breaking painted material up is the exposure route that matters. Interior demolition inside such a house is squarely within the federal renovation rule, which defines a renovation as the modification of any existing structure, or portion thereof, that results in the disturbance of painted surfaces and expressly includes the removal of building components such as walls, ceilings, plumbing and windows. The minor repair exemption reaches only 6 square feet or less of painted surface per room indoors or 20 square feet or less outdoors, does not apply to window replacement or to demolition of painted surface areas, and treats the entire surface area of a removed painted component as disturbed paint.

Local rules can add requirements at the site level. Portland's site control measures for residential demolition include removing lead paint by hand for structures built before 1978, along with dust suppression, debris containment, erosion control and suspension of mechanical work above a stated wind speed. The pattern is worth generalizing: the question is not only who is certified, but what is done on the day to keep dust on the property. Ask how the site will be wetted, how debris will be contained, where the wash-off goes, and what protects the neighbors' yards and vegetable gardens.

How a demolition project actually runs, start to finish

  • Surveys: asbestos inspection where required, lead assessment on pre-1978 buildings, and the written engineering survey of the structure.
  • Abatement: licensed removal of friable asbestos and any other hazardous material identified, documented with a close-out letter where the jurisdiction requires one.
  • Permits and notices: the demolition permit, any delay period, mailed notice and door hangers, and the state or local air agency notification.
  • Utility disconnects: scheduled with each utility, cut and capped outside the building line rather than simply switched off at the meter.
  • Locates: an 811 ticket before any excavation, with marks confirmed on the ground before a machine touches soil.
  • Salvage or deconstruction: reusable material removed by hand, which is a requirement rather than an option for some buildings.
  • Demolition and haul: the structure taken down in sequence, loaded and removed, with dust suppression running throughout.
  • Foundation, backfill and site restoration: slab and footings removed where the scope says so, the hole filled with clean fill and compacted, erosion control maintained and the site graded.

The surprises that turn up under a demolished building

  • A buried heating oil tank, which changes the job from demolition to environmental work and has its own state rules.
  • An old septic tank or cesspool that must be pumped, crushed or removed and properly decommissioned rather than buried.
  • A shared or party wall with a neighbor, where the demolition exposes their structure and someone has to make it weathertight.
  • Foundations, slabs or old fill from a previous building that nobody knew was there, which changes both the removal and the backfill.
  • Contaminated or unsuitable fill placed in the hole, which becomes the next builder's problem and is expensive to correct.
  • Wells, cisterns and abandoned utilities that have to be decommissioned to a state standard rather than covered over.
  • Trees whose root zones are inside the work area, which some cities protect independently of the demolition permit.
  • Debris disposal handled improperly, which is a liability that follows the property owner and not only the hauler.

What drives a demolition quote, and how LokalMatch fits in

Demolition pricing is dominated by access, hazards and disposal. The variables that move a US quote most are the size and construction type of the building, whether machinery can reach it or the work has to be done by hand, the results of the asbestos and lead surveys and whether abatement is included or excluded, whether an ordinance requires hand deconstruction rather than mechanical demolition, how much of the foundation and slab is coming out, the volume and mix of debris and local tipping costs, utility disconnect fees and lead times, permit fees and any mandated delay period, and what site restoration is included. Ask each bidder to price abatement, foundation removal, backfill and haul-away as separate lines, and to state what happens if a survey finds more than expected.

LokalMatch is the first step. You describe the job once: what is being taken down, roughly how big it is, the age of the building, whether a machine can reach it, and whether you already have surveys or a permit. Demolition contractors working in your area receive the request and the ones interested contact you directly. Pros pay for the requests they receive, and homeowners pay nothing to use it. LokalMatch does not perform demolition, does not set prices, and does not vet, rank or recommend any company, so verifying licensing, insurance, the required surveys and notifications, and where the debris is actually going remains your responsibility.

Demolition: frequently asked questions

Does the federal asbestos rule apply to demolishing my house?

Usually not by itself, and that is a narrow point rather than an all-clear. The rule applies to a facility, defined as any institutional, commercial, public, industrial or residential structure, installation or building, but excluding residential buildings having four or fewer dwelling units. A standalone house, duplex, triplex or fourplex is generally outside it. But the rule also treats a group of buildings at a single site under one owner or operator as an installation, EPA states that the asbestos standards apply to most demolition projects conducted by municipalities, counties and land banks, and states commonly impose their own survey requirements on single homes. Ask your state air agency.

So do I need an asbestos survey before a teardown or not?

In many states, yes, regardless of the federal exclusion. Oregon requires that prior to demolition of a residence constructed prior to 2004 you hire an accredited inspector to conduct an asbestos survey, and its allowance for homeowners to handle asbestos-containing material in their own home covers renovation rather than demolition: friable material has to be removed by a DEQ licensed abatement contractor first. Cities can also make the survey a condition of the permit, as Portland does by requiring the site controls form, the asbestos survey and a close-out letter before the permit issues.

How long does it take to get a demolition permit?

Longer than most people plan for, because several cities build in a waiting period. Portland imposes a mandatory 35-day delay for demolishing a one- or two-family dwelling designated residential by its Comprehensive Plan Map, which does not apply to residential structures in commercial or industrial zones, or to garages and accessory structures. It also mails notice to properties within 150 feet within five business days of application, and the applicant must place door hangers within 300 feet between two weeks and 72 hours before demolition begins. Check your own city before committing to a construction start date.

Who disconnects the utilities?

The utilities do, and it has to happen before demolition rather than during it. The federal construction standard requires that all electric, gas, water, steam, sewer and other service lines be shut off, capped or otherwise controlled outside the building line before demolition work is started, and that any utility company involved be notified in advance. Where a service has to stay live during the work, it must be temporarily relocated as necessary and protected. Disconnects are scheduled work with lead times, so they belong at the front of the program, not the week of demolition.

Do I need a licensed contractor to demolish a building?

In states that license contracting, demolition is usually inside the definition. California defines a contractor to include a person who undertakes, offers to undertake, or does by or through others, work to wreck or demolish any building or structure. Florida's definition covers a person who for compensation undertakes to, submits a bid to, or does by others demolish a building or structure. Check the state licensing authority where your property is, ask which license class covers demolition there, and verify it with the regulator rather than accepting a number printed on a truck.

Can I be made to dismantle a house by hand instead of knocking it down?

In some cities, yes. Portland requires a house or duplex to be deconstructed rather than mechanically demolished if it was built in 1940 or earlier, or if it was designated a historic resource subject to demolition review or the city's delay provisions, and only certified deconstruction contractors may do that work. Deconstruction takes longer and costs more in labor, though salvage can offset part of it. Find out whether an ordinance of this kind applies before you take bids, since a mechanical demolition price is not comparable to a deconstruction price.

Where does all the debris go, and is that my problem?

It is worth treating as your problem. EPA estimated that 600 million tons of construction and demolition debris were generated in the United States in 2018, and disposal is a significant part of any demolition price. Ask in writing which facility the material is going to, what will be separated for recycling, whether concrete is being crushed on site or hauled, and who holds the disposal receipts. Improper dumping tends to be traced back to the property it came from, so the paperwork is worth keeping.

Sources

  1. 29 CFR 1926.850: Demolition, preparatory operations
  2. 40 CFR 61.141: Asbestos NESHAP definitions
  3. 40 CFR 61.145: Asbestos NESHAP standard for demolition and renovation
  4. EPA: Asbestos-containing materials and demolition
  5. EPA: Construction and Demolition Debris material-specific data
  6. 40 CFR 745.83: Lead RRP definitions
  7. Oregon DEQ: Asbestos information for homeowners
  8. City of Portland: Residential demolition permits
  9. City of Portland: Deconstruction permit requirements
  10. Seattle Department of Construction and Inspections: Do You Need a Permit?
  11. California Business and Professions Code section 7026: definition of contractor
  12. Florida Statutes section 489.105: definition of contractor

Written by the LokalMatch editorial team. Last reviewed September 21, 2026. How we write and check our guides

What demolition contractors can help with

Common jobs homeowners hire demolition contractors for:

Find demolition contractors by city

Alaska

Show 1 cities

California

Show 186 cities

Delaware

Show 1 cities

Florida

Show 82 cities

Maine

Show 1 cities

Texas

Show 79 cities

What affects the cost of demolition

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Size and scope of the job
  • Materials and finishes chosen
  • Condition of what's there now
  • Access to the work area
  • Urgency and scheduling
  • Permits, where required

How to compare demolition contractors before you hire

  • Describe the job clearly, with photos if you can, so pros can give you a realistic quote.
  • Get more than one written quote and compare them on the same scope of work.
  • Check that the pro carries liability insurance and, where required, is licensed for this work in your area.
  • Look at recent reviews and photos of similar jobs.
  • Get the price, the timeline and the payment terms in writing before work starts.

Questions to ask demolition contractors before you hire

  • Have you done jobs like this before, and can I see examples?
  • What is included in your price, and what isn't?
  • Does this work need a permit from my municipality, and who will get it?
  • Can you show me proof of liability insurance?
  • When can you start, and how long will the job take?
  • What warranty or guarantee do you offer on your work?

Demolition permits and local rules

Some demolition work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing

Ready to get demolition quotes?

Tell us about your demolition project.

Do you offer demolition services?

Join LokalMatch to get matched with homeowners in the areas you serve.