Underpinning means deepening or widening an existing foundation by building new support beneath it, usually in short sections so the wall above is never unsupported for long. In American houses it comes up in three situations: a footing that has settled and has to be carried down to competent soil, a basement floor that a homeowner wants lowered for headroom in a rowhouse or a pre-war city lot, and an excavation next door that is going below the level of your footing.

Tell us about your underpinning project and we’ll help you find local underpinning contractors who serve your area.

Free for homeowners · No obligation to hire

On this page

It is the most consequential excavation a homeowner is likely to authorize, and federal workplace rules treat it that way. The excavation standard provides that excavation below the level of the base or footing of any foundation or retaining wall that could reasonably be expected to pose a hazard to employees is not permitted except where a support system such as underpinning is provided, where the excavation is in stable rock, or where a registered professional engineer has approved that the structure is sufficiently removed from the excavation or that the work poses no hazard. The same standard requires shoring, bracing or underpinning wherever the stability of adjoining buildings, walls or other structures is endangered.

Then there is the neighbor, who in a dense American city block is standing on the same soil you are about to remove. That relationship is governed by state law, not by goodwill, and it is worth reading before the first shovel.

Underpinning, piering and the alternatives worth pricing first

  • Traditional mass underpinning: the wall is excavated in short numbered bays, each dug to the new depth and filled with concrete, with the bays worked in a sequence that never leaves adjacent sections open at once.
  • Beam and base underpinning, where a reinforced beam spreads the wall load onto fewer, deeper bases rather than replacing the footing along its whole length.
  • Push piers and helical piers, which do not deepen the foundation but transfer its load onto steel driven or screwed to firmer material, and which are usually the cheaper answer to pure settlement.
  • Grout or resin injection beneath a slab, which addresses a settled floor rather than a settled footing and is not a substitute for underpinning a wall.
  • Bench footing, a basement-lowering method that leaves the original footing in place and steps the new floor inward, trading floor area for a far simpler job.
  • Doing nothing structural at all, which is the right answer more often than the industry suggests, when the movement has stopped and the cause was drainage that can be fixed above ground.

Bay by bay: how an underpinning sequence is supposed to run

An underpinning job is an engineering sequence before it is a digging job. The engineer numbers the bays, sets a maximum open length, specifies the order they may be worked in, and states how long a bay may stay open before it is filled. That sequence exists so that the wall above always bridges a short gap onto sound bearing on both sides. When a crew decides in the moment to open two adjacent bays because it is faster, the design has been abandoned whether or not anything falls.

The rest of the day is unglamorous. Each bay is hand-dug or carefully machine-dug to the specified depth, the base of the existing footing is cleaned, the new concrete is placed and then dry-packed tight against the underside of the old footing so the load transfers without the wall dropping to find it. Utilities are located before any of this starts, and monitoring points are set on the building so movement is measured rather than argued about. Ask for the monitoring readings as the job proceeds, not as a summary at the end.

Digging below an existing footing: the federal rule that governs the whole job

The federal excavation standard is the clearest statement of what underpinning is for. It provides that excavation below the level of the base or footing of any foundation or retaining wall that could reasonably be expected to pose a hazard to employees is not permitted except when a support system such as underpinning is provided to ensure the stability of the structure and protect employees, when the excavation is in stable rock, when a registered professional engineer has approved that the structure is sufficiently removed from the excavation that it will not be affected, or when a registered professional engineer has approved that the work will not pose a hazard.

It then extends the same principle outward. Where the stability of adjoining buildings, walls or other structures is endangered by excavation operations, support systems such as shoring, bracing or underpinning must be provided to ensure the stability of those structures for the protection of employees, and sidewalks, pavements and appurtenant structures may not be undermined unless a support system or another method of protection is provided against their possible collapse. Read that as a homeowner rather than as a contractor and it tells you the two questions to ask any bidder: which registered professional engineer approved this sequence, and what is holding up my neighbor's wall, my sidewalk and my own chimney while it happens.

Your neighbor's foundation: notice, lateral support and who pays for protection

In much of the country the duty you owe an adjoining owner when you excavate is set by state statute rather than by the building code. California is a useful example because its rule is specific. Civil Code section 832 requires an owner of land, or their lessee, intending to make or permit an excavation to give reasonable notice to the owner or owners of adjoining lands, and provides that the owner of a building or other structure must be allowed at least 30 days, if they so desire, in which to take measures to protect it from damage.

The section then scales the duty with depth. Where the excavation goes deeper than the standard depth of foundations, which it defines as a depth of nine feet below the adjacent curb level at the point where the joint property line intersects the curb, the statute requires that ordinary care and skill be used and reasonable precautions taken to sustain the adjoining land, and that the person making the excavation protect the adjoining land and any building or structure on it from damage by reason of the excavation, without cost to the owner of that property. Your own state's rule will differ in its numbers and its mechanics, and some cities add their own adjoining-property protection requirements on top, so the notice question belongs with your attorney and your building department before it belongs with your contractor. Tell your neighbor early anyway. A neighbor who learns about a nine-foot excavation from the noise is a neighbor with a lawyer.

Engineering, permits and inspections when you are going under a standing house

There is no version of underpinning that is not permit work. The building department wants the engineer's drawings, the bay sequence and the shoring design, and it wants to inspect the excavation and the reinforcement before concrete covers them. That is the only stage at which anyone can confirm the depth reached, the soil the new base is bearing on and the steel that went in, so a job that pours before an inspection has destroyed its own evidence.

Two other approvals commonly attach. Utility locates come first, because the lines running to your house and along the frontage are exactly where the excavation goes. And where the work is next to a sidewalk, an alley or a street, the city usually has a separate permit for undermining or protecting public right of way. Ask for the permit numbers, not for an assurance that permits are handled, and keep the final inspection record with the engineer's letter. Underpinning is the single item a future buyer's inspector is most likely to ask about and least able to verify without paperwork.

What goes wrong on underpinning jobs, and what it looks like from upstairs

  • Too many bays open at once, or bays worked out of sequence, which is the single most common cause of new cracking during the job.
  • New concrete not dry-packed tight under the existing footing, so the wall settles a fraction of an inch onto its new support and cracks finishes upstairs.
  • No monitoring points set before work started, leaving no baseline and no way to distinguish new movement from what was already there.
  • Water arriving in the deeper excavation, which changes the job from digging to dewatering and was priced as neither.
  • Ground water lowered during the work, which can settle neighboring soil and buildings that were fine before the pumps started.
  • A lowered basement finished without addressing drainage, so the new floor sits below the old drain line and needs a pump that was never in the contract.
  • Sequence decisions made on site by the crew rather than by the engineer who designed them, usually explained afterward as a judgment call.

What an underpinning quote is really pricing, and how LokalMatch fits in

Underpinning is sold by the linear foot of wall and bought by the cubic yard of difficulty. The things that move a quote are the depth you are going to and what the soil does on the way down, whether water shows up, how the spoil leaves the site when there is no vehicle access to a city back yard, how much of the work is hand-dug, how many bays the sequence requires and how long each must stay open, whether shoring for a neighboring structure is included, and whether the scope stops at structure or continues into a new slab, drainage and a pump. Engineering, monitoring and inspection fees are real line items and are not the place to economize.

LokalMatch is where the shortlist starts. Describe the job once: what you are trying to achieve, how old the building is, what is next door and how close, whether an engineer is already involved, and how a machine would reach the work. Contractors who do this kind of excavation in your area receive the request, and the ones interested contact you. The service is free for homeowners and paid for by the pros who receive requests. LokalMatch does not perform excavation, does not set prices, and does not vet, rank or recommend contractors, so the engineering, the permits, the insurance check and the notice to your neighbor stay with you.

Underpinning: frequently asked questions

Is underpinning the same thing as installing piers?

No. Underpinning builds new foundation beneath the existing one, in sections, so the wall ends up bearing lower and on better material. Piers leave the foundation where it is and transfer its load onto steel driven or screwed down to firmer ground. Piering is usually cheaper and faster for straightforward settlement. Underpinning is what you need when the foundation itself has to be deeper, which is the case when a basement is being lowered or an adjacent excavation is going below your footing.

My neighbor is excavating next to my house. What can I ask for?

Start with your state's excavation statute. California's Civil Code section 832, for example, requires reasonable notice to adjoining owners and allows the owner of a building at least 30 days, if they want it, to take measures to protect it. Where the dig goes below nine feet under the adjacent curb level, the statute requires ordinary care and skill, reasonable precautions to sustain the adjoining land, and protection of the neighboring property and any structure on it without cost to its owner. Other states word this differently, so confirm your own.

Can the crew just dig the whole wall out at once if they are careful?

No, and a crew that suggests it has told you something important. The sequence of bays, the maximum open length and the time a bay may stay open are the engineering. Federal excavation rules also prohibit digging below the base of an existing footing where it could reasonably be expected to pose a hazard, unless a support system such as underpinning is provided, the excavation is in stable rock, or a registered professional engineer has approved the arrangement.

Will underpinning make my basement dry?

Not by itself, and going deeper can make water more likely rather than less, because the new floor sits lower relative to the surrounding ground and any drain line. Drainage, a sump, a vapor barrier under the new slab and the waterproofing of the newly exposed wall are separate decisions that belong in the same contract. Ask for them as priced line items rather than assuming they are included.

Do I have to move out during underpinning?

Often yes for a basement-lowering job and sometimes no for localized underpinning of one wall. The deciding factors are noise, dust, whether utilities have to be interrupted, whether the only bathroom or the furnace is in the work zone, and how many weeks the sequence takes. Ask the contractor to describe the daily condition of the house rather than the total duration, and settle who pays for alternative accommodation before signing.

How do I know the work was done to the depth I paid for?

Only through inspections and photographs taken before the concrete. Once a bay is filled, the depth, the bearing material and the reinforcement are invisible forever. Require that each bay be photographed open with a measuring rod in frame, keep the building department's inspection record, and get the engineer's written confirmation at the end that the completed work matches the design.

Sources

  1. 29 CFR 1926.651: Specific excavation requirements, including stability of adjacent structures
  2. California Civil Code section 832: lateral and subjacent support

Written by the LokalMatch editorial team. Last reviewed September 21, 2026. How we write and check our guides

Find underpinning contractors by city

Alaska

Show 1 cities

California

Show 186 cities

Delaware

Show 1 cities

Florida

Show 82 cities

Maine

Show 1 cities

Texas

Show 79 cities

What affects the cost of underpinning

Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:

  • Interior or exterior approach
  • Length of foundation wall to excavate or treat
  • Depth, soil conditions and access for equipment
  • Crack repair, underpinning or other structural work
  • Weeping tile, sump pumps and backwater valves
  • Restoring landscaping, driveways or finished basements
  • Testing and safe removal of mould or asbestos, where needed

How to compare underpinning contractors before you hire

  • Choose a contractor who finds the source of the water before recommending a fix, whether that's grading, eavestroughs, cracks or drainage.
  • Ask them to explain the difference between interior and exterior waterproofing for your home, and why they recommend one.
  • For foundation cracks that are wide, growing or uneven, ask whether a structural engineer should assess them first.
  • For mould, asbestos or radon, hire professionals qualified for that specific work, and don't disturb suspect materials yourself.
  • Get a written quote that lists excavation, membranes, weeping tile, sump pumps and restoration of landscaping or finishes.

Questions to ask underpinning contractors before you hire

  • Where do you think the water is coming from, and how did you confirm it?
  • Do you recommend interior or exterior waterproofing for my home, and why?
  • Should a structural engineer look at these cracks or this wall?
  • Does this work need a permit from my municipality?
  • Is your warranty transferable if I sell the house, and what does it cover?
  • How will you restore the landscaping, driveway or basement finishes afterwards?
  • If you find mould or asbestos, how will it be handled and by whom?

When to call a pro for underpinning

  • Water on the basement floor or damp walls after rain or snowmelt
  • Foundation cracks that are growing, or walls that bow or lean, which should be assessed by a qualified professional
  • Musty smells or mould that keeps coming back
  • Suspected asbestos in insulation, flooring or pipe wrap: leave it undisturbed and call a qualified abatement professional.

Underpinning permits and local rules

Some underpinning work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.

Permits and licensing