Plumbing Installation
Plumbing Installation near you
Plumbing installation is new pipework rather than mended pipework: a bathroom where there was a bedroom, a kitchen moved to the other side of the house, an outside tap, a garden watering system, a second WC under the stairs, an unvented cylinder replacing a loft tank and a gravity-fed cylinder. The pipe is the cheap part. What makes an installation go well or badly in Britain is that two entirely different permission systems can apply to the same job, and they do not talk to each other.
Tell us about your plumbing installation project and we’ll help you find local plumbers who serve your area.
Free for homeowners · No obligation to hire
On this page
The first is your water company. The Water Supply (Water Fittings) Regulations 1999 list, in a Table in regulation 5, the operations for which you must give notice before starting, must not begin without the undertaker's consent, and must comply with any conditions attached to that consent. The second is building control. In England the relevant requirements sit in Part G of Schedule 1 to the Building Regulations 2010, with Approved Document G as the guidance, and some plumbing work is notifiable while much of it is not.
Neither system licenses plumbers. Both, however, run on certificates, and the certificates are the things a buyer's solicitor asks for years later. This guide sets out what triggers a notification, what backflow protection an installation has to build in, what Part G actually requires of a new or altered system, and what paperwork you should end up holding.
The installations you must notify your water company about before starting
The Table in regulation 5 of the Water Supply (Water Fittings) Regulations 1999 is the list people most often discover after the fact. Work described in it cannot lawfully be started until the undertaker has been told and has agreed, and whatever conditions it attaches form part of the permission. Reading the Table before ordering anything is a five-minute job that occasionally saves a bathroom.
Two entries catch domestic projects that feel small. A garden watering system needs notice unless it is designed to be operated by hand, which sweeps in most buried irrigation. And any water system laid outside a building that is either less than 750mm or more than 1350mm below ground level needs notice, which is the reason an installer will ask how deep the trench is going before quoting.
Regulation 5(2) carves out a narrow exemption: the regulation does not apply to installation by an approved contractor of a fitting falling within the Table entries for extending or altering a water system on premises other than a house, for a bidet with an ascending spray or flexible hose, or for a reduced pressure zone valve assembly or other mechanical device protecting against fluid category 4 or 5. Regulation 7 makes it an offence to commence a listed operation without the required notice, without the required consent, or in breach of a condition imposed on that consent.
- The erection of a building or other structure, not being a pond or swimming pool.
- A bath with a capacity, measured to the centre line of overflow, of more than 230 litres.
- A bidet with an ascending spray or flexible hose.
- A single shower unit of a type specified by the regulator, other than a drench shower installed for safety or health reasons.
- A pump or booster drawing more than 12 litres per minute, connected directly or indirectly to a supply pipe.
- A unit incorporating reverse osmosis, or a water treatment unit producing a waste water discharge or needing water for regeneration or cleaning.
- A pond or swimming pool over 10,000 litres designed to be replenished automatically with water supplied by the undertaker.
Fittings you are allowed to install, and what makes one acceptable
Regulation 4 sets the material test twice over. Every water fitting must be of an appropriate quality and standard and suitable for the circumstances in which it is used, and the regulation defines appropriate quality or standard by reference to an appropriate harmonized standard or European technical approval, an appropriate British Standard or other national specification of an EEA State giving an equivalent level of protection and performance, or a specification approved by the regulator. Every fitting must also comply with the requirements of Schedule 2 as those requirements apply to it, and where a Schedule 2 requirement relates to a water system, every fitting forming part of that system has to be fitted, altered or replaced so as to comply.
In practice that means an installer choosing between products is choosing between approvals, not between finishes. It is worth asking, in writing, which standard or regulator-approved specification each unfamiliar fitting is being supplied against, particularly for anything on the cold supply upstream of the first draw-off and for anything that connects a hose, a filling loop or an appliance to the mains.
Backflow and the five fluid categories a British installation is designed around
Schedule 1 to the Water Supply (Water Fittings) Regulations 1999 grades fluids into five categories, and the level of backflow protection an installation needs follows from the worst category a fitting could draw back into the supply. Category 1 is wholesome water as supplied by the undertaker. Category 2 is water whose aesthetic quality is impaired by a change of temperature or by substances or organisms changing its taste, odour or appearance, expressly including water in a hot water distribution system. Category 3 is a slight health hazard from substances of low toxicity, the Schedule giving ethylene glycol, copper sulphate solution and sodium hypochlorite as examples.
The two that dictate hardware are the top pair. Category 4 is a significant health hazard from toxic substances, including chemicals, carcinogens and pesticides such as insecticides and herbicides, or environmental organisms of potential health significance. Category 5 is a serious health hazard from pathogenic organisms, radioactive or very toxic substances, including anything containing faecal material or other human waste, butchery or animal waste, or pathogens from any other source. This is why an outside tap, a bidet with a flexible hose, a garden irrigation line and a heating filling loop are each treated as a separate design problem rather than as plumbing.
- Protection is chosen for the worst fluid category the connection could allow back, not for the water normally in the pipe.
- A mechanical device protecting against fluid category 4 or 5, such as a reduced pressure zone valve assembly, is itself a notifiable installation under regulation 5.
- A bidet with an ascending spray or flexible hose is notifiable unless installed by an approved contractor.
- Hot water distribution is category 2 in its own right, which is why a hot outlet is never treated as the same risk as a cold one.
- Backflow devices need to remain accessible; anything boxed in permanently cannot be tested or replaced.
Part G: what the building regulations require of a new or altered system in England
Approved Document G covers sanitation, hot water safety and water efficiency, and three of its requirements shape domestic installation work. Requirement G2 sets a water efficiency standard for new dwellings: the estimated consumption of wholesome water, calculated with the methodology in the Approved Document, should be no more than 125 litres per person per day, or 110 litres per person per day where the optional requirement has been imposed as a condition of planning permission. The Approved Document notes that the 125 litre figure includes a fixed factor of 5 litres per person per day for outdoor use.
Requirement G3(4) is the one that changes real bathrooms. The hot water supply to any fixed bath must be designed and installed so that the temperature of the water that can be delivered to that bath does not exceed 48 degrees Celsius. The Approved Document's guidance is to limit it with an in-line blending valve or other appropriate temperature control device with a maximum temperature stop and a suitable arrangement of pipework, to keep the length of supply pipe between blending valve and outlet to a minimum, and to choose valves that fail safe and cannot easily be altered by building users.
Requirement G5 simply states that a bathroom must be provided containing a washbasin and either a fixed bath or a shower, and the Approved Document adds that any dwelling, house or flat, must have at least one such bathroom. Approved Document G is guidance for England; Wales publishes its own editions, Scotland's technical handbook deals with the same ground in its sections on sanitary facilities, water efficiency and danger from heat, and Northern Ireland uses the Department of Finance technical booklets.
Competent person schemes, and the certificate you should be handed within 30 days
Approved Document G explains the self-certification route. Under regulation 12(6) of the Building Regulations it is not necessary to notify a building control body in advance of work covered by the Approved Document if the work is of a type set out in column 1 of Schedule 3 to the Regulations and is carried out by a person registered with the corresponding scheme in column 2. To join such a scheme a person has to demonstrate competence for the type of work the scheme covers and the ability to comply with the relevant Building Regulations requirements.
The paperwork that follows is the point. Where work is done by someone registered with a competent person scheme, regulation 20 of the Building Regulations requires that the occupier be given, within 30 days of completion, a certificate confirming the work complies with all applicable Building Regulations requirements, and that the building control body be given a notice that this has been done or a copy of the certificate, again within 30 days. Building control bodies are authorised to accept those certificates as evidence of compliance, although local authority inspection and enforcement powers are unaffected.
The list of authorised schemes changes, and the Approved Document says so explicitly, advising that the current list on gov.uk should always be consulted. Ask which scheme an installer belongs to and for what type of work, rather than accepting a general claim of registration: an unvented hot water registration and a water fittings registration are different things.
- Establish the incoming supply's flow rate and pressure before choosing a shower or a cylinder, because the pipe decides what the appliance can do.
- Decide early whether the loft cistern is staying, because removing it converts every upstairs outlet to mains pressure and changes every fitting downstream.
- Settle the notification questions with the water company before the trench, the pump or the bath is ordered, not after.
- Agree where blending valves and isolating valves will sit, and make sure they will still be reachable once tiling and panels go in.
- Confirm that above-ground and below-ground drainage can take the new appliance positions before the walls are closed up.
- Book any electrical work as its own notifiable item, since Part P in England runs on a separate track from Part G.
- Pressure test and leak test with the floor still up, and photograph every concealed joint before it disappears.
What moves the price of a plumbing installation in a British home
- How far the new appliances sit from existing hot, cold and waste runs, since distance is pipe, labour and lifted floors rather than fittings.
- Whether the incoming supply can feed what has been specified, because upgrading a service pipe is a separate excavation job.
- Whether the work triggers notice and consent under regulation 5, which adds lead time before anything can start.
- Whether building control is involved, either through a building control body or through a competent person scheme certificate.
- Solid floors, structural walls and stud partitions that will not take a soil pipe, each of which forces a different route.
- The backflow protection the fluid category demands, which is not optional and is easy to leave out of a first quotation.
- Making good: tiling, plastering, flooring and decoration are usually separate trades and separate figures.
- Whether an unvented cylinder is involved, which brings notifiable building work and a specifically qualified installer with it.
The handover pack to insist on at the end of an installation
- The approved contractor's signed certificate under regulation 6, stating whether the fittings comply with the Water Fittings Regulations.
- Proof that any notice required by regulation 5 was given and consent obtained, together with any conditions attached to it.
- The competent person scheme certificate under regulation 20 where the work was self-certified, or the building control completion paperwork where it was not.
- Manufacturer documentation and commissioning records for any unvented cylinder, blending valve or backflow device.
- A marked-up plan or photographs of concealed pipe runs, which is the cheapest insurance against the next person drilling into them.
- Where the work was in a new dwelling in England, the water efficiency notice given under regulation 37 of the Building Regulations.
What commonly goes wrong on British installations, and how to head it off
The recurring failure is an appliance specified for a supply that cannot feed it. A high-output combi or a multi-head shower assumes a flow rate the incoming supply pipe may never have had, and no amount of internal pipework fixes an undersized service from the street. Measuring first is cheaper than arguing afterwards.
The second is a loft cistern removed without thinking through the consequences. Everything downstream moves from a few metres of head to mains pressure at once, which exposes every tired joint in the house and can make old taps and gravity-fed showers unusable. The third is protection designed out during the tidy-up phase: a blending valve buried behind a panel, a backflow device made inaccessible, or a discharge pipe from an unvented cylinder rerouted to look neater. Approved Document G expects an unvented system's safety devices to be chosen and installed correctly for their location, and none of that survives being boxed in.
Plumbing Installation: frequently asked questions
Do I have to tell my water company before installing a new bathroom?
It depends what is going in. Regulation 5 of the Water Supply (Water Fittings) Regulations 1999 requires notice and consent for the operations in its Table, which include a bath with a capacity over 230 litres measured to the centre line of overflow, a bidet with an ascending spray or flexible hose, a single shower unit of a type specified by the regulator, and a pump or booster drawing more than 12 litres per minute. An ordinary bathroom refit with none of those is not on the list. Where the entry is the bidet, installation by an approved contractor removes the need for notice under regulation 5(2).
Why does my new bath have to be limited to 48 degrees?
Because requirement G3(4) of Schedule 1 to the Building Regulations 2010 says the hot water supply to any fixed bath must be designed and installed to incorporate measures ensuring the temperature of the water that can be delivered to that bath does not exceed 48 degrees Celsius. Approved Document G suggests an in-line blending valve or other appropriate temperature control device with a maximum temperature stop, kept close to the outlet and not easily altered by users. Scotland's technical handbook reaches the same figure in its guidance on hot water discharge from sanitary fittings.
How deep does a new outside water pipe have to be buried?
The regulations approach it through notification rather than a single stated depth. The Table in regulation 5 makes any water system laid outside a building and either less than 750mm or more than 1350mm below ground level an operation requiring notice to and consent from the water undertaker. Separately, Schedule 2 requires fittings laid below ground to have a depth of cover sufficient to prevent the water in them freezing, and to be installed so as to inhibit damage from freezing or any other cause, so depth is only part of the answer.
What is a fluid category, and why does my installer keep mentioning it?
It is the risk grading in Schedule 1 to the Water Supply (Water Fittings) Regulations 1999, and it decides how much backflow protection a connection needs. Category 1 is wholesome water as supplied; category 2 is water whose aesthetic quality is impaired, including hot water in a distribution system; category 3 is a slight health hazard from low toxicity substances; category 4 is a significant health hazard from toxic substances including pesticides; category 5 is a serious health hazard including anything containing faecal material or other human waste. An outside tap or a garden system is designed for the worst case, not for the water normally in the pipe.
Who gives me a certificate when the installation is finished?
Potentially two people. Under regulation 6 of the Water Supply (Water Fittings) Regulations 1999, an approved contractor must give the person who commissioned the work a signed certificate stating whether the fitting complies with the Regulations, and copy it to the water undertaker where advance notice was required. Separately, where notifiable building work was self-certified under a competent person scheme, regulation 20 of the Building Regulations requires the occupier to receive a compliance certificate within 30 days of completion, with the building control body notified in the same period.
Is there a water efficiency limit on a new home's plumbing?
In England, yes. Approved Document G gives the standard set by the Secretary of State as 125 litres per person per day of wholesome water for a new dwelling, or 110 litres per person per day where the optional requirement has been imposed as a condition of planning permission, calculated using the water efficiency methodology in the Approved Document. The 125 litre figure includes a fixed allowance of 5 litres per person per day for outdoor use. It applies to new dwellings rather than to replacing fittings in an existing one.
Sources
- Water Supply (Water Fittings) Regulations 1999, regulation 5 and the notification Table
- Water Supply (Water Fittings) Regulations 1999, regulation 4: appropriate quality and standard
- Water Supply (Water Fittings) Regulations 1999, Schedule 1: the five fluid categories
- Approved Document G: water efficiency (G2), the 48 degree limit at a fixed bath (G3(4)) and competent person schemes
- Building Regulations 2010, Schedule 1 Part G: sanitation, hot water safety and water efficiency
- Scottish Government: building standards technical handbook 2022, domestic, standard 4.9 danger from heat
- Scottish Government: building standards technical handbook 2022, domestic, standard 3.27 water efficiency
- WaterSafe: approved contractors, certificates of compliance and the schemes behind the register
- Department of Finance: Northern Ireland building regulations technical booklets
Written by the LokalMatch editorial team. Last reviewed 21 September 2026. How we write and check our guides
Find plumbers by city
England
Show 173 citiesHide cities
- Plumbing Installation in Birmingham
- Plumbing Installation in Bournemouth
- Plumbing Installation in Bradford
- Plumbing Installation in Brighton and Hove
- Plumbing Installation in Bristol
- Plumbing Installation in Cambridge
- Plumbing Installation in Coventry
- Plumbing Installation in Derby
- Plumbing Installation in Exeter
- Plumbing Installation in Ipswich
- Plumbing Installation in Kingston upon Hull
- Plumbing Installation in Leeds
- Plumbing Installation in Leicester
- Plumbing Installation in Liverpool
- Plumbing Installation in London
- Plumbing Installation in Luton
- Plumbing Installation in Manchester
- Plumbing Installation in Middlesbrough
- Plumbing Installation in Milton Keynes
- Plumbing Installation in Newcastle upon Tyne
- Plumbing Installation in Northampton
- Plumbing Installation in Norwich
- Plumbing Installation in Nottingham
- Plumbing Installation in Oxford
- Plumbing Installation in Peterborough
- Plumbing Installation in Plymouth
- Plumbing Installation in Portsmouth
- Plumbing Installation in Reading
- Plumbing Installation in Sheffield
- Plumbing Installation in Southampton
- Plumbing Installation in Southend-on-Sea
- Plumbing Installation in Stoke-on-Trent
- Plumbing Installation in Sunderland
- Plumbing Installation in Swindon
- Plumbing Installation in Wolverhampton
- Plumbing Installation in York
- Plumbing Installation in Ashford
- Plumbing Installation in Aylesbury
- Plumbing Installation in Banbury
- Plumbing Installation in Barnsley
- Plumbing Installation in Barrow-in-Furness
- Plumbing Installation in Basildon
- Plumbing Installation in Basingstoke
- Plumbing Installation in Bath
- Plumbing Installation in Bebington
- Plumbing Installation in Bedford
- Plumbing Installation in Beeston
- Plumbing Installation in Birkenhead
- Plumbing Installation in Blackburn
- Plumbing Installation in Blackpool
- Plumbing Installation in Bloxwich
- Plumbing Installation in Bognor Regis
- Plumbing Installation in Bolton
- Plumbing Installation in Bootle
- Plumbing Installation in Bracknell
- Plumbing Installation in Brentwood
- Plumbing Installation in Burnley
- Plumbing Installation in Burton upon Trent
- Plumbing Installation in Bury
- Plumbing Installation in Cannock
- Plumbing Installation in Canterbury
- Plumbing Installation in Carlisle
- Plumbing Installation in Chatham
- Plumbing Installation in Chelmsford
- Plumbing Installation in Cheltenham
- Plumbing Installation in Chester
- Plumbing Installation in Chesterfield
- Plumbing Installation in Clacton-on-Sea
- Plumbing Installation in Colchester
- Plumbing Installation in Corby
- Plumbing Installation in Crawley
- Plumbing Installation in Crewe
- Plumbing Installation in Crosby
- Plumbing Installation in Darlington
- Plumbing Installation in Dartford
- Plumbing Installation in Dewsbury
- Plumbing Installation in Doncaster
- Plumbing Installation in Dudley
- Plumbing Installation in Durham
- Plumbing Installation in Eastbourne
- Plumbing Installation in Ellesmere Port
- Plumbing Installation in Farnborough
- Plumbing Installation in Folkestone
- Plumbing Installation in Gateshead
- Plumbing Installation in Gillingham
- Plumbing Installation in Gloucester
- Plumbing Installation in Gosport
- Plumbing Installation in Gravesend
- Plumbing Installation in Grimsby
- Plumbing Installation in Guildford
- Plumbing Installation in Halesowen
- Plumbing Installation in Halifax
- Plumbing Installation in Harlow
- Plumbing Installation in Harrogate
- Plumbing Installation in Hartlepool
- Plumbing Installation in Hastings
- Plumbing Installation in Hemel Hempstead
- Plumbing Installation in Hereford
- Plumbing Installation in High Wycombe
- Plumbing Installation in Hinckley
- Plumbing Installation in Horsham
- Plumbing Installation in Huddersfield
- Plumbing Installation in Huyton with Roby
- Plumbing Installation in Kettering
- Plumbing Installation in Kidderminster
- Plumbing Installation in Kingswinford
- Plumbing Installation in Kingswood and Fishponds
- Plumbing Installation in Lancaster
- Plumbing Installation in Lincoln
- Plumbing Installation in Loughborough
- Plumbing Installation in Lowestoft
- Plumbing Installation in Macclesfield
- Plumbing Installation in Maidenhead
- Plumbing Installation in Maidstone
- Plumbing Installation in Mansfield
- Plumbing Installation in Margate
- Plumbing Installation in Newcastle-under-Lyme
- Plumbing Installation in Nuneaton
- Plumbing Installation in Oldham
- Plumbing Installation in Paignton
- Plumbing Installation in Poole
- Plumbing Installation in Preston
- Plumbing Installation in Redditch
- Plumbing Installation in Rochdale
- Plumbing Installation in Rochester
- Plumbing Installation in Rotherham
- Plumbing Installation in Royal Leamington Spa
- Plumbing Installation in Royal Sutton Coldfield
- Plumbing Installation in Royal Tunbridge Wells
- Plumbing Installation in Rugby
- Plumbing Installation in Runcorn
- Plumbing Installation in Sale
- Plumbing Installation in Salford
- Plumbing Installation in Scarborough
- Plumbing Installation in Scunthorpe
- Plumbing Installation in Shrewsbury
- Plumbing Installation in Sittingbourne
- Plumbing Installation in Slough
- Plumbing Installation in Smethwick
- Plumbing Installation in Solihull
- Plumbing Installation in South Shields
- Plumbing Installation in Southport
- Plumbing Installation in St Albans
- Plumbing Installation in St Helens
- Plumbing Installation in Stafford
- Plumbing Installation in Stevenage
- Plumbing Installation in Stockport
- Plumbing Installation in Stockton-on-Tees
- Plumbing Installation in Stourbridge
- Plumbing Installation in Tamworth
- Plumbing Installation in Taunton
- Plumbing Installation in Telford
- Plumbing Installation in Torquay
- Plumbing Installation in Tynemouth
- Plumbing Installation in Wakefield
- Plumbing Installation in Wallasey
- Plumbing Installation in Walsall
- Plumbing Installation in Warrington
- Plumbing Installation in Washington
- Plumbing Installation in Watford
- Plumbing Installation in Wellingborough
- Plumbing Installation in Welwyn Garden City
- Plumbing Installation in West Bromwich
- Plumbing Installation in Weston-super-Mare
- Plumbing Installation in Weymouth
- Plumbing Installation in Widnes
- Plumbing Installation in Wigan
- Plumbing Installation in Woking
- Plumbing Installation in Wokingham
- Plumbing Installation in Worcester
- Plumbing Installation in Worthing
- Plumbing Installation in Wythenshawe
- Plumbing Installation in Yeovil
Northern Ireland
Show 7 citiesHide cities
Scotland
Show 10 citiesHide cities
- Plumbing Installation in Aberdeen
- Plumbing Installation in Dundee
- Plumbing Installation in Edinburgh
- Plumbing Installation in Glasgow
- Plumbing Installation in Cumbernauld
- Plumbing Installation in Dunfermline
- Plumbing Installation in East Kilbride
- Plumbing Installation in Hamilton
- Plumbing Installation in Livingston
- Plumbing Installation in Paisley
What affects the cost of plumbing installation
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Type of problem and how easy it is to find
- Access to pipes behind walls, under floors or underground
- Parts and fixtures chosen
- Age and material of the existing pipes
- Emergency, evening or weekend service
- Permits and inspections, where required
How to compare plumbers before you hire
- Hire a plumber who is licensed for this work in your area, especially for gas water heaters, sewer lines and new plumbing.
- Ask whether they charge a flat rate or by the hour, and what the call-out fee covers.
- For leaks and drain problems, choose someone who explains the cause and doesn't only clear the symptom.
- Get the scope in writing for larger jobs such as a water heater, sewer repair or re-piping.
- If it's urgent, ask how soon they can arrive and whether after-hours rates apply.
Questions to ask plumbers before you hire
- Are you licensed for plumbing work in my area?
- Do you charge a flat rate or by the hour, and is there a call-out fee?
- What do you think is causing the problem?
- Will this work need a permit or an inspection, and who will arrange it?
- Will you need to open walls, floors or the yard to reach the problem?
- What warranty do you offer on parts and labour?
When to call a pro for plumbing installation
- An active leak: shut off the main water valve if you can reach it safely, then call a plumber.
- Sewage backing up into drains or the basement
- No hot water, or water pooling around the water heater
- Pipes that may have frozen during a cold snap
Plumbing installation permits and local rules
Some plumbing installation work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingSeasonal maintenance
This job is part of our home maintenance checklists for:
Guides about plumbing installation
- ✦
Plumbers guide
Plumbing in a British home covers the cold water arriving at the stopcock, the hot water and heating pipework, and everything that drains away: taps, cylinders, showers, toilets, washing machine connections, outside…
Read guide - ✦
Emergency Plumbers guide
Emergency plumbing is the part of the trade that runs on the clock rather than the diary: a burst pipe soaking a ceiling, a leak that will not stop when you close the stopcock, a toilet or soil stack backing up, a hot…
Read guide - ✦
Plumbing Repair guide
Plumbing repair covers the unglamorous middle of the trade: the cistern that refills all night, the compression joint weeping behind a kitchen unit, the radiator valve that will not shut, the shower that has lost its…
Read guide
Ready to get plumbing installation quotes?
Tell us about your plumbing installation project.
Do you offer plumbing installation services?
Join LokalMatch to get matched with homeowners in the areas you serve.