Driveway Repair
Driveway Repair near you
A driveway in Australia has to survive reactive clay underneath it, intense sun on top of it, storm water running across it and a vehicle parked on it every day. When it starts cracking, sinking at one end or breaking up at the edges, the repair that lasts is the one that deals with why it moved rather than the one that fills what you can see.
Tell us about your driveway repair project and we’ll help you find local paving contractors who serve your area.
Free for homeowners · No obligation to hire
On this page
Driveway repair covers crack filling and sealing, patching potholes and broken edges, lifting or replacing sunken sections, resurfacing, re-laying pavers that have dropped, correcting falls so water runs the right way, and rebuilding the crossing where the driveway meets the kerb. Surfaces here are mostly plain and decorative concrete, asphalt, segmental pavers, and gravel or compacted rubble on larger blocks.
The single most useful thing to work out before you get quotes is whether the problem is the surface or the ground beneath it. A crack that has stayed the same width for years is a different job from one that opens and closes with the seasons, and a section that has dropped is telling you about the base, the fill or the drainage rather than the concrete. Repairs applied over a moving base come back, and they usually come back in the same place.
Reading the damage: cracks, settlement and edge failure
Much of Australia sits on reactive clay that swells as it takes up moisture and shrinks as it dries out, and that seasonal movement is the background cause of a large share of driveway damage. The code's response for housing is to require the foundations where footings and slabs are located to be classified in accordance with AS 2870, and the same soil is under your driveway even though the driveway itself is rarely designed with that rigour. Add a hot sun that drives surface shrinkage and a storm that dumps a month of rain in an afternoon, and the surface has plenty to complain about.
- Fine surface crazing across a concrete driveway, usually cosmetic and related to how the surface was finished and cured.
- Narrow cracks that appeared early and have not moved since, generally shrinkage and a sealing job rather than a structural one.
- Cracks that open in the dry months and close after rain, which is the ground moving and needs jointing and drainage rather than filler alone.
- A section that has dropped relative to its neighbours, pointing at uncompacted fill, a washout or a service trench under the slab.
- Broken edges along the side of a concrete or asphalt drive, where there is no support beside the slab and soil has eroded away.
- Potholes and alligator cracking in asphalt, which mean water has reached the base and softened it.
- Pavers that have sunk in wheel tracks or lifted over a root, which is a bedding and base problem rather than a paver problem.
- A step or crack where the driveway meets the garage or the kerb, which is often where two differently supported slabs meet.
Repair, resurface or replace: how to tell which one you need
Repair is the right answer when the slab or pavement is fundamentally sound and sitting still. Sealing dormant cracks, patching a pothole, replacing a broken edge, re-laying a dropped panel of pavers or grinding a trip hazard all buy years when the base underneath is stable and the water is going somewhere sensible.
Resurfacing suits a surface that has worn out above a base that has not. An asphalt overlay or a decorative topping can transform appearance and shed water again, but it is a cosmetic layer with no structural contribution, so laying it over a moving or hollow base simply hides the movement until it reappears through the new surface, usually within a season or two.
Replacement becomes the cheaper answer when the base is the problem: when whole sections have settled, when cracks are wide and still moving, when the falls send water towards the house or garage, or when repeated patches have failed in the same spot. Replacement is also the only practical time to correct the things that cannot be fixed from above, namely the depth and compaction of the base, the jointing layout, the reinforcement and the drainage. Ask for the diagnosis in writing, with the reasoning, so you can compare quotes that propose genuinely different work rather than the same work at different numbers.
The crossover: the part of your driveway that is not yours
Between your boundary and the road there is a strip that belongs to the public, and the section of driveway crossing it is generally called a crossover or vehicle crossing. It is regulated separately from the driveway inside your property, and repairing or widening it is a council matter. Brisbane City Council, for example, requires a driveway permit for a driveway crossing between the carriageway of a road and your property, assesses proposals against the relevant requirements and guidelines including the council's technical standards, and states that property owners are responsible for the construction and ongoing maintenance of their driveway including the adjacent kerb and channel. Other councils run equivalent schemes under their own names and standards, so ask yours before scheduling work.
The same principle appears in planning law. The NSW Planning Portal notes that any structure on or over public land or roads must have approval specifically from the local council or Transport for NSW. Its exempt development criteria for driveways, pathways and paving also require that the work be constructed so any surface water or run-off is disposed of by a drainage system connected to the existing stormwater drainage system, and that construction comply with AS/NZS 2890.1 for off-street car parking, with restrictions on heritage items, heritage conservation areas, foreshore areas and environmentally sensitive land.
The practical consequence is that a driveway repair can involve two approvals and two standards: one for the part inside your boundary, which may well be exempt, and one for the crossing, which almost certainly is not. Sort out which is which before the concrete is ordered, and get the crossover approval in your own name rather than assuming the contractor has it.
Base, falls and the parts of a repair you will never see again
A durable repair starts below the surface. Ask how deep the excavation goes, what base material is used, how it is compacted and in what thickness of layers, because the Housing Provisions expect fill to be placed and mechanically compacted in layers not more than 150 millimetres for good reason: a thick, loosely tipped layer will keep settling long after the surface looks finished. Ask too whether underground services are being located before anyone digs or saw-cuts.
Then the water. The Housing Provisions require the ground next to a slab-on-ground building to be graded to give a slope of not less than 25 millimetres over the first metre from the building where rainfall is low and the surface impermeable, and 50 millimetres over the first metre in any other case. A driveway that falls towards the house or the garage door is working against that, and the National Construction Code's performance requirement is that surface water from a storm with a one per cent annual exceedance probability must not enter the building, while water from a five per cent annual exceedance probability storm must be disposed of in a way that avoids the likelihood of damage or nuisance to any other property. Re-grading and a properly placed drain are often the real repair.
For concrete work, the specified minimums for housing are worth knowing because they appear on the delivery docket: concrete with a strength at 28 days of not less than 20 megapascals, denoted N20 grade, a 20 millimetre maximum nominal aggregate size and a nominal 100 millimetre slump. Ask also where the control joints will go, since planned joints are how you decide where the concrete cracks rather than letting it decide for you.
Driveway surfaces and how each one is repaired
- Plain concrete, repaired by sealing dormant cracks, patching, grinding trip hazards or cutting out and replacing whole panels between joints.
- Decorative concrete such as exposed aggregate, stencilled or coloured finishes, where matching an existing repair is genuinely difficult and a full panel replacement often looks better than a patch.
- Asphalt, repaired by cutting out and replacing failed areas or overlaying, with potholes and alligator cracking signalling water in the base.
- Segmental and brick pavers, which have the advantage of being liftable, so a dropped area can be taken up, the bedding corrected and the same pavers relaid.
- Gravel and compacted rubble on rural and semi-rural blocks, maintained by grading, topping up and keeping the crown and table drains working.
- Joint sealants and backing rod, which keep water out of the very cracks that let it into the base.
- Subsoil drains, grated drains and kerbing, which are often the actual fix when the surface keeps failing in the same spot.
When to schedule driveway work in Australia
Because summer runs through December, January and February and winter through June, July and August, the constraints are the reverse of the northern hemisphere. The Australian problem is not freezing; it is that hot, dry, windy conditions pull water out of fresh concrete faster than it can bleed to the surface, which causes plastic shrinkage cracking. Summer pours are often started early in the day and need a genuine curing plan rather than a promise.
Winter in the southern states brings the opposite issue: cold mornings slow the set and delay finishing, extending how long the crew is on site and how long you are without a driveway. Wet ground also makes excavation and compaction harder and the site messier. In the tropical north, the wet season disrupts both access and the work itself, and this sort of job is realistically scheduled in the dry season.
Whatever the season, ask what the contingency is if rain arrives within hours of a pour, and do not push a crew to work in weather they are telling you is wrong. Then ask, and get in writing, when you can walk on the surface and when you can drive on it. The Housing Provisions require slab surfaces including edges to be moist cured for seven days and prohibit loading a slab with stacked materials or building plant for a minimum of seven days after pouring, and a surface that will carry a vehicle is normally given longer again. Driving on it early is damage no warranty will cover.
Licensing, what to agree in writing, and how LokalMatch works
Licensing follows the usual state pattern. In New South Wales the general concreting category covers concrete laying, formwork, fixing reinforcement, stencilling, stamped patterns, exposed aggregate, pebblecrete, concrete repairs and resurfacing, along with the excavation necessary before the concrete goes in, and is required for work above the value threshold under the Home Building Act 1989; it explicitly does not cover major site preparation, excavation shoring or work affecting the structural stability of neighbouring property. Queensland licenses concreting as its own trade class covering formwork, reinforcement and concrete, with a QBCC licence required for building work above the commission's threshold, and the structural landscaping class separately covers preparing sites and installing paving or concrete not intended for vehicular traffic, which is a distinction worth noting for a driveway.
The Australian Consumer Law guarantees apply whatever the size of the job: the service must be carried out with an acceptable level of care and skill, be fit for any stated purpose and be supplied within a reasonable time where none was agreed. Because cracking is the thing most likely to be argued about later, agree in writing beforehand what will and will not be treated as a defect, where the joints go, what finish and tolerance you are getting, what is being done about falls and drainage, and when the driveway can carry a vehicle. Keep the delivery dockets showing the concrete grade and slump, along with the council crossover approval, with the contract.
LokalMatch is built for the comparison stage. You describe the driveway once, including the surface, the area, the slope, what is failing and whether the crossing at the kerb is part of the job, and matched paving and concreting contractors get in touch with you directly. Those businesses pay for the requests they receive. LokalMatch does no work, sets no prices and does not vet, rank or recommend any contractor, so the licence check, the council approval and the reference visits remain yours.
Driveway Repair: frequently asked questions
Is it worth filling cracks, or will they just come back?
It depends on whether the crack is still moving. A narrow crack that appeared early and has stayed the same width is shrinkage, and sealing it keeps water out of the base, which is genuinely useful. A crack that opens in the dry months and closes after rain is ground movement, and filler alone will fail there repeatedly until the jointing and drainage are addressed.
Do I need council approval to repair my driveway?
For the part inside your boundary, often not, though conditions still apply, including that run-off be disposed of through a drainage system connected to the existing stormwater system. For the crossing between the kerb and your boundary, almost certainly yes: councils run their own driveway permit schemes and technical standards for that section, and structures on or over public land need council or state road authority approval.
How long before I can drive on a new concrete driveway?
Longer than most people expect, and you should get the figure in writing. The Housing Provisions require slab surfaces including edges to be moist cured for seven days and prohibit loading a slab for a minimum of seven days after pouring, and a surface carrying vehicle loads is usually given more than that. Early loading damage is self-inflicted and is not a warranty claim.
Why has one section of my driveway sunk?
Almost always something below it. Common causes are fill that was tipped rather than compacted in layers, a service trench that was backfilled loosely, or water washing fines out of the base. Because the cause is under the slab, lifting or replacing that section without correcting the base and the drainage usually buys only a few years.
Can I resurface instead of replacing?
If the base is sound, yes, and it can be a good outcome. A resurfacing layer is cosmetic rather than structural, so it will not bridge a base that is settling or hollow, and movement underneath reappears through the new surface fairly quickly. Ask the contractor to explain specifically why the base is sound before accepting a resurfacing quote.
Does a driveway repair need a licensed contractor?
Above your state's contract value threshold, yes. New South Wales covers concrete laying, repairs and resurfacing under its general concreting category, and Queensland licenses concreting as a trade class, with different classes covering paving intended for vehicles and paving that is not. Check the licence number on the regulator's own public register rather than taking it from the quote letterhead.
Sources
- Brisbane City Council: Apply for a driveway permit (vehicle crossing)
- NSW Planning Portal: Driveways, pathways and paving as exempt development
- NCC: ABCB Housing Provisions Part 4.2 Footings, slabs and associated elements
- NCC: ABCB Housing Provisions Part 3.3 Drainage and surface water
- NCC: ABCB Housing Provisions Part 3.2 Earthworks and compacted fill
- NCC Volume Two Part H2: Surface water performance requirements
- NSW Government: General concreting work licence
- QBCC: Concreting licence class
- QBCC: Who must hold a QBCC licence
- ACCC: Consumer guarantees
Written by the LokalMatch editorial team. Last reviewed 14 September 2026. How we write and check our guides
Find paving contractors by city
Australian Capital Territory
Show 1 citiesHide cities
New South Wales
Show 8 citiesHide cities
Northern Territory
Show 1 citiesHide cities
Queensland
Show 10 citiesHide cities
South Australia
Show 1 citiesHide cities
Tasmania
Show 2 citiesHide cities
Victoria
Show 5 citiesHide cities
Western Australia
Show 2 citiesHide cities
What affects the cost of driveway repair
Prices depend on the details of your project. We only publish price ranges when they’re backed by real LokalMatch quote data or reliable sources. Until then, here’s what usually changes the price:
- Size and thickness of the area
- Removal of the old surface
- Excavation and base preparation
- Finish, colour or pattern
- Access for equipment and trucks
- Steps, curves, drains or retaining edges
How to compare paving contractors before you hire
- Choose a contractor who explains how they'll prepare the base, since most concrete and interlock problems start underneath.
- Ask how they'll slope the surface so water drains away from the house.
- Get a written quote that covers excavation, base material, reinforcement, finish and removal of the old surface.
- Look at jobs they finished a few seasons ago to see how they've held up through freeze and thaw.
- Ask whether they'll call to have underground utilities located before digging.
Questions to ask paving contractors before you hire
- How deep will you excavate, and what base will you put down?
- Will you use reinforcement, and what kind?
- How will you make sure water drains away from the house?
- Does this work need a permit from my municipality?
- How soon can the surface be walked on or driven on after it's done?
- What warranty do you offer for cracking, settling or heaving?
When to call a pro for driveway repair
- Cracks that are widening or slabs that have sunk or lifted
- Water pooling against the foundation after rain
- Trip hazards on steps, walkways or driveways
Driveway repair permits and local rules
Some driveway repair work needs a permit or has to meet local bylaws. Rules vary by municipality, so ask your pro whether a permit is needed and who will apply for it — and check with your city or town if you’re unsure.
Permits and licensingSeasonal maintenance
This job is part of our home maintenance checklists for:
Free project calculators
Guides about driveway repair
- ✦
Landscapers guide
Landscaping in Australia answers to water, heat and fire before it answers to taste. Much of the country lives under permanent water rules rather than occasional restrictions, so a garden that only survives on daily…
Read guide - ✦
Landscape Design guide
Landscape design is the part of an outdoor project that happens on paper. Somebody measures the block, works out where the sun and the prevailing wind come from, resolves the levels, decides what is paved and what is…
Read guide - ✦
Lawn Care guide
An Australian lawn runs on an upside-down calendar compared with most of the advice on the internet. The warm-season grasses that cover most of the country put on their heaviest growth through the warm, wet months from…
Read guide
Ready to get driveway repair quotes?
Tell us about your driveway repair project.
Do you offer driveway repair services?
Join LokalMatch to get matched with homeowners in the areas you serve.